Filter interviews by
Top trending discussions
I applied via LinkedIn and was interviewed before Mar 2021. There were 3 interview rounds.
I applied via Campus Placement
I interned at XYZ Company as a mechanical engineer.
Assisted in designing and testing new products
Collaborated with team members to improve manufacturing processes
Conducted research on materials and their properties
Created technical drawings and schematics using CAD software
My family background is diverse and multicultural.
My parents are from different countries and cultures.
I grew up speaking multiple languages at home.
My family values education and hard work.
We have a strong sense of community and support for each other.
My grandparents were immigrants who worked hard to provide for their families.
I appeared for an interview before Nov 2016.
Yes, I am willing to work at any location for the Senior Engineer position.
I am open to relocating for the right opportunity
I have experience working in different locations
I am flexible and adaptable to new environments
I have a proven track record of staying calm and focused in challenging situations, allowing me to problem-solve effectively.
I have experience working in high-pressure environments and have successfully delivered projects on time despite obstacles.
I am adaptable and can quickly assess a situation to determine the best course of action.
I have strong problem-solving skills and can think creatively to find solutions in ad
I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.
To analyse total diesel consumption in equipment, I would gather data on usage and calculate fuel efficiency.
Collect data on equipment usage and fuel consumption
Calculate fuel efficiency by dividing fuel consumption by equipment usage
Compare fuel efficiency across different equipment to identify outliers
Identify factors that may affect fuel efficiency, such as maintenance or operator behavior
I have 10 years of experience in electrical project management, including designing and implementing electrical systems for commercial buildings.
Managed a team of engineers and technicians to successfully complete a large-scale electrical project for a shopping mall.
Designed and installed electrical systems for office buildings, ensuring compliance with safety regulations and energy efficiency standards.
Collaborated wi...
The working process of a project involves planning, execution, monitoring, and completion.
Planning phase includes defining project goals, scope, and deliverables.
Execution phase involves assigning tasks, managing resources, and implementing the project plan.
Monitoring phase includes tracking progress, identifying issues, and making necessary adjustments.
Completion phase involves finalizing deliverables, conducting proj
The question is asking about the process from survey execution to billing and closure.
Survey execution involves designing and distributing surveys to collect data.
Data collected from surveys is then analyzed and processed.
Based on the analysis, billing is done for the services provided.
Finally, the project is closed, and any remaining tasks or documentation are completed.
I applied via Naukri.com and was interviewed before Feb 2022. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Oct 2023. There were 2 interview rounds.
Control panel of a Cummins genset is a crucial component that allows users to monitor and control the operation of the generator set.
The control panel typically includes features such as start/stop buttons, gauges for monitoring voltage, current, and frequency, and alarms for indicating faults or abnormalities.
Some advanced control panels may also have remote monitoring capabilities, allowing users to check the status ...
Cummins engine overhauling involves disassembling, inspecting, repairing, and reassembling the engine to improve performance and extend its lifespan.
Overhauling a Cummins engine involves disassembling the engine to inspect and repair components such as pistons, cylinders, and valves.
The engine is then cleaned thoroughly to remove any build-up of dirt or debris that could affect performance.
After repairs are made, the e...
based on 1 interview
Interview experience
based on 7 reviews
Rating in categories
Manager
143
salaries
| ₹9 L/yr - ₹30 L/yr |
Design Engineer
126
salaries
| ₹2.6 L/yr - ₹11.5 L/yr |
Senior Executive
124
salaries
| ₹5.2 L/yr - ₹17.1 L/yr |
Deputy Manager
83
salaries
| ₹8.9 L/yr - ₹20 L/yr |
Senior Engineer
69
salaries
| ₹6.4 L/yr - ₹15 L/yr |
Siemens
Adani Power
Eaton
Adani Green Energy