Process gear oil replacement is the procedure of draining out old gear oil from a system and refilling it with fresh gear oil.
Drain out old gear oil from the system
Ensure proper disposal of the old gear oil
Refill the system with fresh gear oil
Follow manufacturer's guidelines for the type and amount of gear oil to be used
Top trending discussions
posted on 28 Jul 2022
posted on 7 Feb 2022
I applied via Referral and was interviewed in Aug 2021. There were 2 interview rounds.
I applied via Campus Placement and was interviewed in Aug 2024. There were 4 interview rounds.
Aptitude test its very nice test for job test class test
Aptitude test its nice attitude test job test class test work test
Assignment test is the one topic and only one subject assignment test
posted on 29 Feb 2024
I applied via Company Website
I have experience working with pumps and vessels in various projects during my diploma in Mechanical Engineering.
I have hands-on experience in designing, installing, and maintaining pumps and vessels for different industrial applications.
I am familiar with different types of pumps such as centrifugal pumps, reciprocating pumps, and gear pumps.
I have worked on sizing and selecting pumps based on the flow rate, head, and...
I applied via Campus Placement and was interviewed in Feb 2023. There were 2 interview rounds.
posted on 29 Nov 2022
I applied via Walk-in and was interviewed in Oct 2022. There were 2 interview rounds.
posted on 27 Jun 2022
De-ashing process from ESP to silo involves several steps.
The ash is collected in hoppers located at the bottom of the ESP.
The ash is then transported to the silo using a pneumatic conveying system.
The ash is stored in the silo until it can be disposed of properly.
Regular maintenance of the ESP and pneumatic conveying system is necessary to ensure efficient de-ashing.
Proper safety measures must be taken during the de-a
The capacity of ESP hoppers varies depending on the size and model of the equipment.
ESP hoppers can range from a few hundred cubic feet to several thousand cubic feet in capacity.
The capacity can also depend on the type of material being collected in the hopper.
It is important to regularly monitor and maintain the hopper to prevent overfilling and potential equipment damage.
I applied via Campus Placement and was interviewed before Dec 2019. There were 5 interview rounds.
A funnel drawing sketch is required with top and front view.
Start by drawing a trapezoid shape for the top view
Add a curved shape for the funnel body
Draw a circle for the bottom of the funnel
For the front view, draw a straight line for the height of the funnel
Connect the top and bottom of the line with a curved shape
Add any necessary details such as a handle or spout
Heat treatment involves heating and cooling of metals to alter their properties. FE-C equilibrium diagram shows the relationship between carbon content and temperature in steel.
Heat treatment is used to improve the mechanical properties of metals.
It involves heating the metal to a specific temperature and then cooling it at a specific rate.
FE-C equilibrium diagram shows the phases of steel at different temperatures and...
posted on 11 Oct 2015
I applied via campus placement at Indian Institute of Technology (IIT), Chennai
I interned at XYZ Company as a mechanical engineer.
Assisted in designing and testing new products
Collaborated with team members to improve manufacturing processes
Conducted research on materials and their properties
Created technical drawings and schematics using CAD software
My family background is diverse and multicultural.
My parents are from different countries and cultures.
I grew up speaking multiple languages at home.
My family values education and hard work.
We have a strong sense of community and support for each other.
My grandparents were immigrants who worked hard to provide for their families.
Interview experience
Engineer
316
salaries
| ₹3 L/yr - ₹10.6 L/yr |
Assistant Lead Engineer
179
salaries
| ₹8.1 L/yr - ₹20 L/yr |
Lead Engineer
174
salaries
| ₹8.2 L/yr - ₹28 L/yr |
Senior Engineer
165
salaries
| ₹4.8 L/yr - ₹14.1 L/yr |
Buyer
107
salaries
| ₹3.2 L/yr - ₹9 L/yr |
Suzlon Group
Inox Wind
GE Vernova
Siemens Gamesa Renewable Power Private Limited