I applied via Approached by Company and was interviewed in Apr 2023. There were 2 interview rounds.
Takt time is the rate at which a product must be produced to meet customer demand.
Takt time is calculated by dividing the available production time by the customer demand.
It helps in determining the production rate required to meet customer demand.
Cycle time, on the other hand, is the time taken to complete one production cycle.
Takt time is used in lean manufacturing to optimize production processes.
For example, if the...
Manufacturing processes in wire harness include cutting, stripping, crimping, and soldering wires.
Cutting wires to the required length
Stripping the insulation from the ends of the wires
Crimping terminals onto the stripped ends of the wires
Soldering the connections for added strength and durability
Testing the harness for continuity and proper function
Various materials are used in wire harness manufacturing process
Wires
Connectors
Terminals
Tapes
Sleeves
Clips
Labels
Cable ties
Grommets
Heat shrink tubing
Line valensing is not a commonly used term in assembly or manufacturing.
posted on 5 May 2019
I applied via Recruitment Consultant and was interviewed in Aug 2018. There were 4 interview rounds.
Answers to questions related to manufacturing and engineering processes.
5s is a methodology for workplace organization and standardization.
TPM stands for Total Productive Maintenance and is a system for maximizing equipment effectiveness.
There are seven basic tools of quality control: flowchart, check sheet, histogram, Pareto chart, control chart, cause-and-effect diagram, and scatter diagram.
There are 1000 microns in ...
Deputy Manager
238
salaries
| ₹6 L/yr - ₹15.3 L/yr |
Manager
169
salaries
| ₹5.8 L/yr - ₹23 L/yr |
Senior Engineer
162
salaries
| ₹4 L/yr - ₹12 L/yr |
Engineer
86
salaries
| ₹3 L/yr - ₹8 L/yr |
Senior Manager
65
salaries
| ₹10 L/yr - ₹32 L/yr |
BHEL
Thermax Limited
Siemens
Alstom Transportation