Filter interviews by
I was interviewed before Jan 2024.
I was interviewed before Oct 2023.
I applied via Referral and was interviewed before Oct 2022. There were 3 interview rounds.
Availability zones in a cloud can be configured by setting up multiple data centers in different geographic locations.
Configure availability zones by selecting different data centers within a cloud provider's region.
Distribute resources across availability zones to ensure high availability and fault tolerance.
Use load balancers and auto-scaling groups to balance traffic and scale resources across availability zones.
Exa...
Seeking new challenges and opportunities for growth
Desire to work with cutting-edge technologies
Opportunity for career advancement
Interest in learning new skills and methodologies
Danfoss Power Solutions interview questions for popular designations
I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.
The new product development process involves several stages from ideation to launch.
Ideation and concept development
Market research and analysis
Design and prototyping
Testing and validation
Manufacturing and production
Launch and post-launch evaluation
posted on 4 Jul 2021
Starters are devices used to start and stop motors. There are various types of starters used in electrical and HVAC maintenance.
Direct On-Line (DOL) Starter
Star-Delta Starter
Soft Starter
Variable Frequency Drive (VFD) Starter
Auto Transformer Starter
I applied via Company Website and was interviewed in Apr 2021. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Jun 2021. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Jul 2021. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in Aug 2018. There were 4 interview rounds.
Answers to questions related to manufacturing and engineering processes.
5s is a methodology for workplace organization and standardization.
TPM stands for Total Productive Maintenance and is a system for maximizing equipment effectiveness.
There are seven basic tools of quality control: flowchart, check sheet, histogram, Pareto chart, control chart, cause-and-effect diagram, and scatter diagram.
There are 1000 microns in ...
Top trending discussions
based on 7 interviews
Interview experience
based on 251 reviews
Rating in categories
Production Engineer
53
salaries
| ₹1.5 L/yr - ₹3.6 L/yr |
Design Engineer
21
salaries
| ₹4.6 L/yr - ₹14.9 L/yr |
Quality Engineer
21
salaries
| ₹1.8 L/yr - ₹4.5 L/yr |
Senior Engineer
19
salaries
| ₹4.5 L/yr - ₹25.6 L/yr |
Trainee
19
salaries
| ₹1.4 L/yr - ₹2.4 L/yr |
Eaton
Sun Hydraulics
Kawasaki Heavy Industries
Yuken India