Filter interviews by
Clear (1)
I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.
The new product development process involves several stages from ideation to launch.
Ideation and concept development
Market research and analysis
Design and prototyping
Testing and validation
Manufacturing and production
Launch and post-launch evaluation
Top trending discussions
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.
I applied via Referral and was interviewed in Apr 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Nov 2022. There were 3 interview rounds.
I applied via Company Website and was interviewed in Oct 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Mar 2021. There were 4 interview rounds.
To tackle vibrations in axial fans, proper balancing, alignment, and maintenance are essential.
Perform dynamic balancing of the fan blades to minimize vibrations.
Ensure proper alignment of the fan with the motor and the surrounding structure.
Regularly inspect and maintain the fan components to prevent wear and tear.
Use vibration analysis techniques to identify and address any potential issues.
Consider installing vibrat...
We follow a permit system based on the project requirements and local regulations.
Our permit system ensures compliance with safety standards and legal requirements.
We obtain permits for activities such as construction, electrical work, and hazardous material handling.
The specific permit requirements vary depending on the nature of the project and the location.
We work closely with regulatory authorities to ensure timely...
I applied via Company Website and was interviewed in Apr 2021. There was 1 interview round.
I have 2 years of experience in the wind field.
I have worked on wind turbine design and optimization projects.
I have conducted wind resource assessments for potential wind farm sites.
I have experience in analyzing wind data and performing wind flow modeling.
I have knowledge of wind energy conversion systems and their components.
I have worked with software tools like WindPRO and WAsP for wind energy analysis.
I applied via Campus Placement
I interned at XYZ Company as a mechanical engineer.
Assisted in designing and testing new products
Collaborated with team members to improve manufacturing processes
Conducted research on materials and their properties
Created technical drawings and schematics using CAD software
My family background is diverse and multicultural.
My parents are from different countries and cultures.
I grew up speaking multiple languages at home.
My family values education and hard work.
We have a strong sense of community and support for each other.
My grandparents were immigrants who worked hard to provide for their families.
I appeared for an interview in Oct 2017.
Production Engineer
52
salaries
| ₹0 L/yr - ₹0 L/yr |
Design Engineer
21
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Engineer
21
salaries
| ₹0 L/yr - ₹0 L/yr |
Software Engineer
18
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
18
salaries
| ₹0 L/yr - ₹0 L/yr |
Eaton
Sun Hydraulics
Kawasaki Heavy Industries
Yuken India