Filter interviews by
I applied via Recruitment Consultant and was interviewed in Aug 2018. There were 4 interview rounds.
Answers to questions related to manufacturing and engineering processes.
5s is a methodology for workplace organization and standardization.
TPM stands for Total Productive Maintenance and is a system for maximizing equipment effectiveness.
There are seven basic tools of quality control: flowchart, check sheet, histogram, Pareto chart, control chart, cause-and-effect diagram, and scatter diagram.
There are 1000 microns in ...
Top trending discussions
based on 1 review
Rating in categories
Production Engineer
53
salaries
| ₹1.5 L/yr - ₹3.6 L/yr |
Quality Engineer
22
salaries
| ₹1.7 L/yr - ₹4 L/yr |
Design Engineer
21
salaries
| ₹4.6 L/yr - ₹14.9 L/yr |
Senior Engineer
19
salaries
| ₹4.5 L/yr - ₹25.7 L/yr |
Trainee
19
salaries
| ₹1.4 L/yr - ₹2.4 L/yr |
Eaton Corporation
Sun Hydraulics
Kawasaki Heavy Industries
Yuken India