Line balancing is the process of evenly distributing workload among workstations in a production line to optimize efficiency.
Line balancing aims to minimize idle time and maximize productivity
It involves assigning tasks to workstations based on their processing times
Example: In a manufacturing plant, line balancing ensures each workstation has a similar amount of work to do
Assembly balancing is the process of optimizing the work distribution among different workstations to improve efficiency and productivity.
Assembly balancing involves assigning tasks to different workstations in a way that minimizes idle time and maximizes throughput.
It helps in achieving a smooth flow of work and prevents bottlenecks in the production process.
Factors considered in assembly balancing include task time, ...
Cycle time is the total time it takes to complete a process, while tact time is the time it takes to produce one unit.
Cycle time includes all the time spent on a process, including wait time and processing time.
Tact time is the rate at which a product must be produced to meet customer demand.
For example, if a process takes 10 minutes to complete and the customer demand is 100 units per hour, the tact time would be 0.6 ...
Production is the process of creating goods or services, while quality refers to the standard of those goods or services.
Production involves the manufacturing or creation of goods or services.
Quality refers to the standard or level of excellence of those goods or services.
Production and quality are closely linked as the goal is to produce high-quality products efficiently.
Examples: In a manufacturing plant, production ...
OLE stands for Overall Equipment Effectiveness and OEE stands for Overall Labor Effectiveness.
OLE measures the overall performance of equipment in a manufacturing plant.
OEE measures the overall performance of labor in a manufacturing plant.
Both metrics are used to identify areas for improvement and optimize efficiency.
Example: OLE can help identify equipment downtime and OEE can help identify labor productivity issues.
I applied via Campus Placement
The least count of vernier caliper is the smallest measurement it can accurately measure. The least count of a micrometer is the smallest measurement it can accurately measure.
The least count of a vernier caliper is typically 0.02 mm or 0.001 inches.
The least count of a micrometer is typically 0.01 mm or 0.001 inches.
Vernier calipers are used to measure dimensions of objects with high accuracy.
Micrometers are used to m...
I applied via Company Website and was interviewed before Apr 2023. There was 1 interview round.
Types of wires include solid, stranded, and braided wires. Colors of wires vary depending on their purpose and industry standards.
Types of wires: solid, stranded, braided
Colors of wires vary by industry standards
Common wire colors: black, red, blue, green, white, yellow
Basic mathematics, reasoning ang technical
Dhoot Transmission interview questions for popular designations
I applied via Referral and was interviewed in Feb 2022. There were 2 interview rounds.
Get interview-ready with Top Dhoot Transmission Interview Questions
I applied via campus placement at P E S College of Engineering, Mandya and was interviewed in Aug 2022. There were 2 interview rounds.
The group discussion all of listening to leader..
I applied via Approached by Company and was interviewed in May 2022. There was 1 interview round.
I applied via Campus Placement and was interviewed before Dec 2021. There were 4 interview rounds.
They give traing about overal harness of honda activa in group wise at training centre.
After that we give 100 marks of mcq questions.
I applied via Referral and was interviewed in May 2022. There were 2 interview rounds.
Top trending discussions
The duration of Dhoot Transmission interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 44 interviews
Interview experience
based on 923 reviews
Rating in categories
Quality Engineer
315
salaries
| ₹1 L/yr - ₹4.1 L/yr |
Production Engineer
166
salaries
| ₹0.9 L/yr - ₹6 L/yr |
Production Supervisor
99
salaries
| ₹1 L/yr - ₹4.5 L/yr |
Graduate Engineer Trainee (Get)
90
salaries
| ₹1 L/yr - ₹3 L/yr |
Design Engineer
86
salaries
| ₹1.5 L/yr - ₹5 L/yr |
Bharat Forge
Samvardhana Motherson Group
TVS Sundram Fasteners
Ramkrishna Forgings