Filter interviews by
I applied via Campus Placement and was interviewed in Jul 2020. There was 1 interview round.
I applied via Referral and was interviewed in Jun 2020. There were 3 interview rounds.
P2P cycle refers to the Procure-to-Pay cycle, which is the process of purchasing goods or services from a supplier.
The cycle starts with identifying the need for a product or service
Then, a purchase requisition is created and approved
Next, a purchase order is issued to the supplier
Goods or services are received and inspected
An invoice is received and matched to the purchase order and goods receipt
Finally, payment is ma...
I applied via Campus Placement and was interviewed before Sep 2020. There were 3 interview rounds.
7QC tools are a set of quality control tools used to identify and solve quality problems in manufacturing processes.
7QC tools include Pareto chart, cause-and-effect diagram, control chart, histogram, scatter diagram, flowchart, and check sheet.
They help in identifying and analyzing quality problems, determining root causes, and implementing corrective actions.
They are used to improve product quality, reduce defects, an...
PPAP and APQP are quality management systems used in manufacturing.
PPAP stands for Production Part Approval Process and is used to ensure that manufactured parts meet customer requirements.
APQP stands for Advanced Product Quality Planning and is used to plan and manage the design and development of new products.
Both systems are commonly used in the automotive industry but can be applied to other manufacturing industrie...
Pareto is a principle that states 80% of effects come from 20% of causes.
Also known as the 80/20 rule
Used in business to identify the most important factors
Can be applied to various fields such as economics, engineering, and social sciences
Example: 80% of a company's profits come from 20% of its customers
OEE can be calculated by multiplying Availability, Performance, and Quality percentages.
Calculate Availability by dividing Operating Time by Planned Production Time.
Calculate Performance by dividing Actual Production by Maximum Production.
Calculate Quality by dividing Good Units by Total Units Produced.
Multiply Availability, Performance, and Quality percentages to get OEE.
Dhoot Transmission interview questions for popular designations
I applied via Walk-in and was interviewed before Feb 2021. There was 1 interview round.
Get interview-ready with Top Dhoot Transmission Interview Questions
Top trending discussions
The duration of Dhoot Transmission interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 44 interviews
Interview experience
based on 927 reviews
Rating in categories
Quality Engineer
317
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
166
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Supervisor
99
salaries
| ₹0 L/yr - ₹0 L/yr |
Graduate Engineer Trainee (Get)
90
salaries
| ₹0 L/yr - ₹0 L/yr |
Design Engineer
86
salaries
| ₹0 L/yr - ₹0 L/yr |
Bharat Forge
Samvardhana Motherson Group
TVS Sundram Fasteners
Ramkrishna Forgings