Upload Button Icon Add office photos

Filter interviews by

Delco Infrastructure Projects Civil Site Engineer Interview Questions and Answers

Updated 25 Apr 2022

Delco Infrastructure Projects Civil Site Engineer Interview Experiences

2 interviews found

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Just they need old experience work list

Interview Preparation Tips

Interview preparation tips for other job seekers - But don't try to get job in this company even if you are in worst situation.
They will not provide you salary untill you beg them by kneel down.
Round 1 - One-on-one 

(1 Question)

  • Q1. Nothing much. Only old experience needed.

Interview Preparation Tips

Interview preparation tips for other job seekers - Never try in this company.
Poor management.
Worst salary.
No manner no respect.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Dec 2020. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. What are your reasons for wanting to change your current company?
  • Ans. 

    Seeking new challenges and opportunities for growth in a more dynamic work environment.

    • Desire for professional growth and development

    • Seeking new challenges and projects to work on

    • Looking for a more dynamic and innovative work environment

    • Opportunity to learn new skills and technologies

    • Desire for better work-life balance

  • Answered by AI
  • Q2. How many years of experience do you have in building construction?
  • Ans. 

    I have 5 years of experience in building construction.

    • I have worked on various residential and commercial projects.

    • Managed construction teams and ensured projects were completed on time and within budget.

    • Experience with reading blueprints, conducting site inspections, and coordinating with architects and subcontractors.

  • Answered by AI
Round 2 - Technical 

(3 Questions)

  • Q1. What is compressive strength?
  • Ans. 

    Compressive strength is the ability of a material to withstand loads that reduce the size of the material without undergoing any deformation.

    • Compressive strength is a measure of the maximum load a material can withstand under compression before failure.

    • It is an important property in construction materials like concrete, masonry, and rock.

    • Compressive strength is typically measured in units of force per unit area, such a...

  • Answered by AI
  • Q2. Density of steel
  • Ans. 

    Density of steel is approximately 7850 kg/m^3.

    • Density of steel is typically around 7850 kg/m^3.

    • The density of steel can vary slightly depending on the specific alloy.

    • Density is an important factor in determining the weight of steel structures.

  • Answered by AI
  • Q3. How many days curing at column
  • Ans. 

    Curing of columns typically takes 7 days.

    • Columns generally require 7 days of curing to achieve the desired strength.

    • Curing helps in reducing cracks and increasing the durability of the concrete.

    • Proper curing is essential for the long-term performance of the column.

    • Factors like temperature, humidity, and type of concrete used can affect the curing time.

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Arvind Smartspaces Limited Civil Site Engineer interview:
  • Project Management
Interview preparation tips for other job seekers - Technical and professional communication is must
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is cement and sand
  • Ans. 

    Cement is a binding material used in construction to hold together bricks, stones, and other materials. Sand is a fine aggregate used in concrete mixes.

    • Cement is a powdery substance made from limestone and clay, which when mixed with water forms a paste that hardens to bind materials together.

    • Sand is a granular material composed of finely divided rock and mineral particles, commonly used as a fine aggregate in concrete...

  • Answered by AI
  • Q2. What is aggregate and sand
  • Ans. 

    Aggregate and sand are materials commonly used in construction for creating concrete and mortar.

    • Aggregate is a mixture of sand, gravel, crushed stone, or other materials used in construction.

    • Sand is a granular material composed of finely divided rock and mineral particles.

    • Aggregate is used in concrete to provide bulk and strength, while sand is used in mortar for bonding materials together.

    • Examples of aggregate include...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
-

I applied via Walk-in and was interviewed in Mar 2023. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Qty of cement in M25 grade concrete
  • Ans. 

    The quantity of cement in M25 grade concrete is 350 kg/m³.

    • M25 grade concrete has a mix proportion of 1:1:2 (cement:sand:aggregate).

    • The total volume of concrete is taken as 1 m³.

    • Therefore, the quantity of cement required for 1 m³ of M25 grade concrete is 350 kg.

    • This is calculated by multiplying the volume of concrete by the proportion of cement in the mix.

  • Answered by AI
  • Q2. Exact weight of different dia of steel
  • Ans. 

    The weight of steel varies with its diameter.

    • The weight of steel can be calculated using the formula: weight = volume x density

    • The density of steel is approximately 7850 kg/m³

    • The volume of steel can be calculated using the formula: volume = pi x (diameter/2)² x length

    • For example, a 10mm diameter steel rod with a length of 1 meter would weigh approximately 0.393 kg

  • Answered by AI
  • Q3. Process of waterproofing
  • Ans. 

    Waterproofing is the process of making a structure or object resistant to water penetration.

    • Identify the areas that need waterproofing such as roofs, walls, and foundations.

    • Clean and prepare the surface to be waterproofed.

    • Apply a waterproofing membrane or coating such as bituminous, acrylic, or polyurethane.

    • Ensure proper drainage and slope to prevent water accumulation.

    • Test the waterproofing system for leaks and make n...

  • Answered by AI
  • Q4. Conversion of brass to Cum
  • Ans. 

    Conversion of brass to Cum

    • Brass is an alloy of copper and zinc, while Cum is not a known substance

    • It is not possible to convert brass to Cum

    • Perhaps the question is referring to a different substance or material

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Worst management. My interview was scheduled on Friday but on Wednesday they email me to come on Thursday. When I reached the mentioned location in email , i was given another location which was 2-3 km away. However when I reached the venue, interview time was 11 Am but it started at 1. Pm . After interview Hr called and told me that you are selected for so and so position but there will be no hike on your current salary, and you have to come for second round . After 15 days they replied me that you are not selected.
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Typical Slab cycle duration & details,
  • Ans. 

    The typical slab cycle duration varies depending on the type of slab and construction method.

    • Slab cycle duration can range from a few days to several weeks.

    • Factors that affect the duration include the type of concrete used, curing time, and weather conditions.

    • For example, a typical cycle for a post-tensioned slab may take around 14 days, while a conventionally reinforced slab may take around 21 days.

    • During this time, t...

  • Answered by AI
  • Q2. Material reconciliation % allowance

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep ready finger Tips figure for different coefficient about material & manpower productivity

I applied via Walk-in and was interviewed in Jun 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About your self
  • Q2. My experience as an engineer
  • Q3. How to execute work on site
  • Ans. 

    Execution of work on site involves planning, coordination, and management of resources to ensure timely completion of the project.

    • Develop a detailed project plan and schedule

    • Allocate resources effectively and efficiently

    • Ensure safety measures are in place

    • Regularly monitor and report progress

    • Address any issues or challenges that arise

    • Maintain good communication with stakeholders

    • Ensure quality control and adherence to sp...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - BE polite. And humble and be in confidence
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Dec 2020. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. What are your reasons for wanting to change your current company?
  • Ans. 

    Seeking new challenges and opportunities for growth in a more dynamic work environment.

    • Desire for professional growth and development

    • Seeking new challenges and projects to work on

    • Looking for a more dynamic and innovative work environment

    • Opportunity to learn new skills and technologies

    • Desire for better work-life balance

  • Answered by AI
  • Q2. How many years of experience do you have in building construction?
  • Ans. 

    I have 5 years of experience in building construction.

    • I have worked on various residential and commercial projects.

    • Managed construction teams and ensured projects were completed on time and within budget.

    • Experience with reading blueprints, conducting site inspections, and coordinating with architects and subcontractors.

  • Answered by AI
Round 2 - Technical 

(3 Questions)

  • Q1. What is compressive strength?
  • Ans. 

    Compressive strength is the ability of a material to withstand loads that reduce the size of the material without undergoing any deformation.

    • Compressive strength is a measure of the maximum load a material can withstand under compression before failure.

    • It is an important property in construction materials like concrete, masonry, and rock.

    • Compressive strength is typically measured in units of force per unit area, such a...

  • Answered by AI
  • Q2. Density of steel
  • Ans. 

    Density of steel is approximately 7850 kg/m^3.

    • Density of steel is typically around 7850 kg/m^3.

    • The density of steel can vary slightly depending on the specific alloy.

    • Density is an important factor in determining the weight of steel structures.

  • Answered by AI
  • Q3. How many days curing at column
  • Ans. 

    Curing of columns typically takes 7 days.

    • Columns generally require 7 days of curing to achieve the desired strength.

    • Curing helps in reducing cracks and increasing the durability of the concrete.

    • Proper curing is essential for the long-term performance of the column.

    • Factors like temperature, humidity, and type of concrete used can affect the curing time.

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Arvind Smartspaces Limited Civil Site Engineer interview:
  • Project Management
Interview preparation tips for other job seekers - Technical and professional communication is must
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jul 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Just construction activities
Round 3 - HR 

(1 Question)

  • Q1. Just Salary negotiations
Round 4 - Behavioral 

(1 Question)

  • Q1. Position and Salary Finalisation

Interview Preparation Tips

Topics to prepare for Ashar group Site Engineer interview:
  • Construction Activity
  • finishing
  • Billing
  • Site Supervision
Interview preparation tips for other job seekers - Just be confident and prompt
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. 1.Waterproofing process 2.Tiling process 3. External plaster work process

Interview Preparation Tips

Interview preparation tips for other job seekers - Preparation for basic knowledge of construction work

Delco Infrastructure Projects Interview FAQs

How many rounds are there in Delco Infrastructure Projects Civil Site Engineer interview?
Delco Infrastructure Projects interview process usually has 1-2 rounds. The most common rounds in the Delco Infrastructure Projects interview process are One-on-one Round and Resume Shortlist.

Tell us how to improve this page.

Interview Questions from Similar Companies

Sunteck Realty Interview Questions
3.4
 • 21 Interviews
Pittie Group Interview Questions
2.9
 • 16 Interviews
Ambience Group Interview Questions
3.5
 • 15 Interviews
ASSA ABLOY Interview Questions
3.5
 • 15 Interviews
Pin Click Interview Questions
3.2
 • 12 Interviews
Alpha Corp Interview Questions
4.2
 • 12 Interviews
Maxinfra Interview Questions
4.2
 • 11 Interviews
View all
Delco Infrastructure Projects Civil Site Engineer Salary
based on 6 salaries
₹2.6 L/yr - ₹3.6 L/yr
12% less than the average Civil Site Engineer Salary in India
View more details

Delco Infrastructure Projects Civil Site Engineer Reviews and Ratings

based on 1 review

2.0/5

Rating in categories

1.0

Skill development

1.0

Work-Life balance

1.0

Salary & Benefits

1.0

Job Security

1.0

Company culture

1.0

Promotions/Appraisal

1.0

Work Satisfaction

Explore 1 Review and Rating
Civil Site Engineer
6 salaries
unlock blur

₹2.7 L/yr - ₹3.6 L/yr

Project Engineer
3 salaries
unlock blur

₹4.5 L/yr - ₹4.5 L/yr

Billing Engineer
3 salaries
unlock blur

₹4.2 L/yr - ₹5.8 L/yr

Explore more salaries
Compare Delco Infrastructure Projects with

Lulu International Shopping Mall

4.0
Compare

Signature Global

4.0
Compare

HM Group

4.5
Compare

Sunteck Realty

3.4
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview