Steel margin refers to the difference between the cost of producing steel and the selling price.
Steel margin is calculated by subtracting the cost of production (including raw materials, labor, and overhead) from the selling price of steel products.
It is important for companies to maintain a healthy steel margin to ensure profitability and sustainability.
Factors that can impact the steel margin include fluctuations in ...
The percentage of aggregate in gradation test varies depending on the specific requirements of the project.
The percentage of aggregate in gradation test is typically determined by the specifications provided for the project
It can range from 0% to 100% depending on the type of aggregate being used and the desired characteristics of the final mix
For example, in a concrete mix design, the percentage of coarse aggregate ma...
The project manager plays a crucial role in overseeing and coordinating all aspects of a project at the site.
Responsible for planning, organizing, and directing project activities
Ensuring project goals are met within budget and timeline
Managing resources and stakeholders effectively
Problem-solving and decision-making skills are essential
Strong communication and leadership skills are necessary
The overall cost in a project in the role of RCC refers to the total expenses incurred for the Reinforced Cement Concrete work.
Calculate the cost of materials such as cement, aggregates, and reinforcement bars.
Consider the cost of labor for construction and installation of RCC components.
Include any additional costs such as equipment rental, transportation, and overhead expenses.
Factor in the cost of quality control me...
I applied via Approached by Company
Project execution approach involves planning, executing, and monitoring phases to ensure successful completion.
Planning phase involves defining project scope, objectives, and deliverables.
Execution phase involves carrying out the plan and coordinating resources.
Monitoring phase involves tracking progress, identifying issues, and making adjustments as needed.
I applied via Walk-in and was interviewed in May 2024. There were 2 interview rounds.
I want to join because I am passionate about project management and engineering challenges.
Passionate about project management and engineering
Excited about the challenges and opportunities in the role
Interested in contributing to the success of the team and company
I applied via LinkedIn and was interviewed in Mar 2024. There was 1 interview round.
posted on 20 Apr 2024
I applied via Referral and was interviewed in Oct 2023. There was 1 interview round.
The functionality of a treatment plant involves multiple steps to treat wastewater and make it safe for disposal or reuse.
1. Collection of wastewater from various sources
2. Screening to remove large objects and debris
3. Primary treatment to separate solids from liquids
4. Secondary treatment to remove organic matter and pathogens
5. Tertiary treatment for further purification
6. Disinfection to kill remaining bacteria and...
The basic process of inspection for JJM sites involves site visits, documentation review, and compliance verification.
Site visits to physically inspect the location and facilities
Review of documentation such as permits, licenses, and safety records
Verification of compliance with regulations and standards
Reporting findings and recommending corrective actions if necessary
I applied via Walk-in and was interviewed in Jul 2023. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Jun 2023. There was 1 interview round.
posted on 21 Jun 2024
I applied via Company Website and was interviewed before Jun 2023. There were 2 interview rounds.
The process of Water Treatment Plant (W.T.P) involves various stages to purify water for consumption.
1. Coagulation: Adding chemicals to water to make particles clump together.
2. Sedimentation: Allowing the clumped particles to settle at the bottom.
3. Filtration: Passing water through filters to remove remaining particles.
4. Disinfection: Adding chlorine or other chemicals to kill bacteria and viruses.
5. Distribution: ...
posted on 8 Jan 2024
SFRA test is a diagnostic test performed on power transformers to assess their mechanical and electrical integrity.
SFRA stands for Sweep Frequency Response Analysis.
It is a non-intrusive test that measures the frequency response of a transformer to a swept sinusoidal input signal.
The test helps in identifying mechanical and electrical faults in the transformer windings.
SFRA test results can be compared with baseline me...
Assistant Engineer
97
salaries
| ₹2.9 L/yr - ₹5.5 L/yr |
Assistant Manager
88
salaries
| ₹6.2 L/yr - ₹12.9 L/yr |
Engineer
74
salaries
| ₹3.2 L/yr - ₹7.5 L/yr |
Senior Engineer
71
salaries
| ₹4.1 L/yr - ₹9 L/yr |
Junior Engineer
65
salaries
| ₹2.8 L/yr - ₹4.2 L/yr |
L&T Energy Hydrocarbon
AECOM
Apco Infratech
Toyo Engineering