Upload Button Icon Add office photos

Filter interviews by

Dee Piping System Project Executive Interview Questions and Answers

Updated 20 Jun 2022

Dee Piping System Project Executive Interview Experiences

1 interview found

I applied via LinkedIn and was interviewed in May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Piping material And code classacification

Interview Preparation Tips

Interview preparation tips for other job seekers - No any advice for job seekers
Thank you

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(4 Questions)

  • Q1. What is the Steel margin
  • Ans. 

    Steel margin refers to the difference between the cost of producing steel and the selling price.

    • Steel margin is calculated by subtracting the cost of production (including raw materials, labor, and overhead) from the selling price of steel products.

    • It is important for companies to maintain a healthy steel margin to ensure profitability and sustainability.

    • Factors that can impact the steel margin include fluctuations in ...

  • Answered by AI
  • Q2. What is the persentage of Aggregate in Gradiation test
  • Ans. 

    The percentage of aggregate in gradation test varies depending on the specific requirements of the project.

    • The percentage of aggregate in gradation test is typically determined by the specifications provided for the project

    • It can range from 0% to 100% depending on the type of aggregate being used and the desired characteristics of the final mix

    • For example, in a concrete mix design, the percentage of coarse aggregate ma...

  • Answered by AI
  • Q3. Project manager role at site
  • Ans. 

    The project manager plays a crucial role in overseeing and coordinating all aspects of a project at the site.

    • Responsible for planning, organizing, and directing project activities

    • Ensuring project goals are met within budget and timeline

    • Managing resources and stakeholders effectively

    • Problem-solving and decision-making skills are essential

    • Strong communication and leadership skills are necessary

  • Answered by AI
  • Q4. What is the overall cost in project in role of RCC
  • Ans. 

    The overall cost in a project in the role of RCC refers to the total expenses incurred for the Reinforced Cement Concrete work.

    • Calculate the cost of materials such as cement, aggregates, and reinforcement bars.

    • Consider the cost of labor for construction and installation of RCC components.

    • Include any additional costs such as equipment rental, transportation, and overhead expenses.

    • Factor in the cost of quality control me...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Mot Satisfaction job
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company

Round 1 - One-on-one 

(2 Questions)

  • Q1. Change managerment
  • Q2. Project execution approach and phases
  • Ans. 

    Project execution approach involves planning, executing, and monitoring phases to ensure successful completion.

    • Planning phase involves defining project scope, objectives, and deliverables.

    • Execution phase involves carrying out the plan and coordinating resources.

    • Monitoring phase involves tracking progress, identifying issues, and making adjustments as needed.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - show proactive approach towards managing things
showcase Stakeholder management
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Why do you want yo join
  • Ans. 

    I want to join because I am passionate about project management and engineering challenges.

    • Passionate about project management and engineering

    • Excited about the challenges and opportunities in the role

    • Interested in contributing to the success of the team and company

  • Answered by AI
  • Q2. What are your strengths
Round 2 - Technical 

(2 Questions)

  • Q1. Engineering flow and sequence
  • Q2. Manhours realted to engineering activities
Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Be confident and old
  • Q2. What was your previous job role like
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Oct 2023. There was 1 interview round.

Round 1 - One-on-one 

(3 Questions)

  • Q1. Complete process of functionality of treatment plant
  • Ans. 

    The functionality of a treatment plant involves multiple steps to treat wastewater and make it safe for disposal or reuse.

    • 1. Collection of wastewater from various sources

    • 2. Screening to remove large objects and debris

    • 3. Primary treatment to separate solids from liquids

    • 4. Secondary treatment to remove organic matter and pathogens

    • 5. Tertiary treatment for further purification

    • 6. Disinfection to kill remaining bacteria and...

  • Answered by AI
  • Q2. What are the basic process of inspection for JJM sites
  • Ans. 

    The basic process of inspection for JJM sites involves site visits, documentation review, and compliance verification.

    • Site visits to physically inspect the location and facilities

    • Review of documentation such as permits, licenses, and safety records

    • Verification of compliance with regulations and standards

    • Reporting findings and recommending corrective actions if necessary

  • Answered by AI
  • Q3. Is code related questions
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Metro work experience mainly in planning department, project management, scheduling, cost management
  • Q2. Why need planning in a construction project
  • Q3. Some software related question like MSP and Excel
  • Q4. Amicable contract closer related question

Interview Preparation Tips

Interview preparation tips for other job seekers - Be honest, point to paint anwer and be confident.
Interview experience
1
Bad
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
No response

I applied via Approached by Company and was interviewed in Jun 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Tendering department design department survey department questions are asked from project enginner

Interview Preparation Tips

Interview preparation tips for other job seekers - For engineer post questions are asked about survey department in core, then questions are asked about designing department, then about tendering department and when your department came like engg. They just minimise their questions
When questions are asked from 4 departments and you are only good in one department. Then your moral automatically came down
I had a question to all those project managers how could your 20+ years experience will be matched to 5 years experience of the candidates
And if you don’t want to select any candidate why you waste yours and candidate time . Just pick your referrals and finish the game.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Jun 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Process of W. T. P
  • Ans. 

    The process of Water Treatment Plant (W.T.P) involves various stages to purify water for consumption.

    • 1. Coagulation: Adding chemicals to water to make particles clump together.

    • 2. Sedimentation: Allowing the clumped particles to settle at the bottom.

    • 3. Filtration: Passing water through filters to remove remaining particles.

    • 4. Disinfection: Adding chlorine or other chemicals to kill bacteria and viruses.

    • 5. Distribution: ...

  • Answered by AI
  • Q2. About safety precautions
Round 2 - HR 

(1 Question)

  • Q1. Salary discussion
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. What is SFRA test on power transformer?
  • Ans. 

    SFRA test is a diagnostic test performed on power transformers to assess their mechanical and electrical integrity.

    • SFRA stands for Sweep Frequency Response Analysis.

    • It is a non-intrusive test that measures the frequency response of a transformer to a swept sinusoidal input signal.

    • The test helps in identifying mechanical and electrical faults in the transformer windings.

    • SFRA test results can be compared with baseline me...

  • Answered by AI

Dee Piping System Interview FAQs

How many rounds are there in Dee Piping System Project Executive interview?
Dee Piping System interview process usually has 2 rounds. The most common rounds in the Dee Piping System interview process are Resume Shortlist and Technical.

Tell us how to improve this page.

People are getting interviews through

based on 1 Dee Piping System interview
Job Portal
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

Apco Infratech Interview Questions
3.8
 • 111 Interviews
AECOM Interview Questions
4.3
 • 109 Interviews
Bechtel Interview Questions
4.0
 • 65 Interviews
Samsung E&A Interview Questions
4.1
 • 58 Interviews
Wood Group Interview Questions
3.7
 • 55 Interviews
View all
Assistant Engineer
97 salaries
unlock blur

₹2.9 L/yr - ₹5.5 L/yr

Assistant Manager
88 salaries
unlock blur

₹6.2 L/yr - ₹12.9 L/yr

Engineer
74 salaries
unlock blur

₹3.2 L/yr - ₹7.5 L/yr

Senior Engineer
71 salaries
unlock blur

₹4.1 L/yr - ₹9 L/yr

Junior Engineer
65 salaries
unlock blur

₹2.8 L/yr - ₹4.2 L/yr

Explore more salaries
Compare Dee Piping System with

L&T Energy Hydrocarbon

3.9
Compare

AECOM

4.3
Compare

Apco Infratech

3.8
Compare

Toyo Engineering

3.9
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview