Aker Solutions Project Manager Interview Questions and Answers

Updated 13 Jul 2024

Aker Solutions Project Manager Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company

Round 1 - One-on-one 

(2 Questions)

  • Q1. Change managerment
  • Q2. Project execution approach and phases
  • Ans. 

    Project execution approach involves planning, executing, and monitoring phases to ensure successful completion.

    • Planning phase involves defining project scope, objectives, and deliverables.

    • Execution phase involves carrying out the plan and coordinating resources.

    • Monitoring phase involves tracking progress, identifying issues, and making adjustments as needed.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - show proactive approach towards managing things
showcase Stakeholder management

Interview questions from similar companies

I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About pipeline
  • Q2. Hydrotest procedure
  • Ans. 

    Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.

    • The vessel or pipeline is filled with water and pressurized to a specified level

    • The pressure is held for a specified amount of time to check for leaks or deformations

    • The test is usually performed before commissioning or after repairs

    • The test pressure and duration are deter...

  • Answered by AI
  • Q3. HDD procedure
  • Ans. 

    HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.

    • Ensure the HDD is compatible with the computer system

    • Physically install the HDD in the appropriate bay

    • Connect the necessary cables to the HDD and motherboard

    • Configure the HDD in the BIOS settings

    • Format the HDD and install the operating system

    • Test the HDD for proper functionality

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic of pipeline and brief knowledge required.

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jan 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. What is the process of developing an erection plan?
  • Ans. 

    Developing an erection plan involves creating a detailed strategy for the construction process.

    • Identify project requirements and objectives

    • Create a timeline for completion

    • Allocate resources and manpower

    • Coordinate with subcontractors and suppliers

    • Ensure compliance with building codes and regulations

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be calm and focused towars your goal

I applied via Recruitment Consulltant and was interviewed in Dec 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Aluminium formwork slab cycle, components, sqm work for per carpenters
  • Q2. How much sqm plastering done by Mason per day, concrete blocks sizes, workability, painting, gypsum work
  • Ans. 

    The amount of sqm plastering done by a Mason per day depends on various factors such as the size of concrete blocks, workability, painting, and gypsum work.

    • The size of concrete blocks can affect the amount of plastering done per day.

    • Workability of the plastering material can also affect the speed of work.

    • Painting and gypsum work can add to the time required for plastering.

    • It is difficult to give an exact number for the...

  • Answered by AI
  • Q3. Conventional shuttering, BBS, steel weight per metre, field test for steel
  • Q4. Field concrete tests, cement, grade of concrete
Round 3 - HR 

(1 Question)

  • Q1. Reason for job change, why should we hire you

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil basics and site execution work to be have good knowledge
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Dec 2024.

Round 1 - Technical 

(1 Question)

  • Q1. Lattice tower Sub bracing design
  • Ans. 

    Lattice tower sub bracing design involves the structural support system for the tower.

    • Sub bracing design is crucial for maintaining the stability and strength of lattice towers.

    • The design should consider factors such as wind load, weight distribution, and material strength.

    • Examples of sub bracing design elements include diagonal bracing, horizontal bracing, and cross bracing.

    • Computer-aided design software is often used...

  • Answered by AI
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Sep 2024.

Round 1 - One-on-one 

(2 Questions)

  • Q1. About previous experience
  • Q2. Why i left all previous companies.
  • Ans. 

    I left previous companies to pursue growth opportunities, align with my career goals, and seek better work-life balance.

    • I left Company A after 3 years to seek a role that offered more leadership opportunities, as I wanted to develop my management skills.

    • At Company B, I transitioned to a new position that aligned better with my long-term career goals in project management.

    • I departed from Company C to find a work environ...

  • Answered by AI
Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Tell me about yourself
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Elaborate VT pump installation process step by step.. How many valves & types used in Raising main? Explain about Cooling Lubrication system.
  • Ans. 

    The VT pump installation process involves several steps. The raising main has multiple valves of different types. The cooling lubrication system is also important.

    • The VT pump installation process involves selecting the right location for the pump, preparing the foundation, and installing the pump.

    • The raising main typically has gate valves, check valves, and air release valves.

    • The cooling lubrication system is responsib...

  • Answered by AI
  • Q2. Why are you going to quit the current job?
  • Ans. 

    I am looking for new challenges and opportunities for growth.

    • Seeking new challenges and opportunities for growth

    • Wanting to expand my skill set and knowledge

    • Desire for a higher level of responsibility

    • Seeking a better work-life balance

    • Unsatisfied with the current work environment or company culture

  • Answered by AI
  • Q3. What is your salary expectation?
  • Ans. 

    I expect a competitive salary that reflects my experience and the responsibilities of the Assistant Manager role.

    • I am looking for a salary that is in line with industry standards and the level of responsibility associated with the Assistant Manager position.

    • I have researched the average salary range for Assistant Managers in this industry and location, and I believe my skills and experience warrant a salary within that...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Confident..
Be Genuine..
Listen each & every Qustion or case study & Explain properly as per practical conditions.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jan 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Related to field and years of experience
  • Q2. Salary,expectations,company requirements and commitment to work
  • Q3. They test your patience and response capability
Round 3 - Technical 

(2 Questions)

  • Q1. Cable laying and jointing knowledge
  • Q2. Related to field inspection and site acceptance

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well in advance irrespective of field too,they make ask different questions to check your capable to give better position other than applied.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - Technical 

(9 Questions)

  • Q1. Stairs case ralling Section and fixing process
  • Q2. Productivity of plaster work and tiles
  • Ans. 

    The productivity of plaster work and tiles is an important factor in construction projects.

    • Productivity in plaster work can be measured by the amount of plaster applied per hour or per day.

    • Factors that can affect plaster work productivity include the skill level of the workers, the quality of materials used, and the efficiency of the tools and equipment.

    • For example, experienced plasterers may be able to apply plaster m...

  • Answered by AI
  • Q3. Centiler beam steel design
  • Ans. 

    Centiler beam steel design is a method used to determine the appropriate size and shape of steel beams for structural support.

    • Centiler beam steel design involves calculating the load and span of the beam to determine the required section modulus.

    • The section modulus is then used to select the appropriate beam size from standard steel beam tables.

    • Factors such as the type of load, material properties, and safety factors a...

  • Answered by AI
  • Q4. In footing 25 mm dia bend deduction yes ya No
  • Q5. Responsibility and team' work
  • Q6. Your work at site?
  • Q7. Work permit at site
  • Q8. Density of steel with unit
  • Ans. 

    The density of steel is a measure of its mass per unit volume.

    • Density of steel is typically measured in units of grams per cubic centimeter (g/cm³) or kilograms per cubic meter (kg/m³).

    • The density of steel can vary depending on the specific type and composition of the steel.

    • For example, the density of carbon steel is around 7.85 g/cm³, while stainless steel has a density of about 8 g/cm³.

    • The density of steel is an impo...

  • Answered by AI
  • Q9. AAC block price and size details
  • Ans. 

    AAC blocks are a type of lightweight concrete blocks used in construction. They come in various sizes and prices.

    • AAC blocks are made from autoclaved aerated concrete, which is a mixture of cement, lime, sand, water, and an expanding agent.

    • The size of AAC blocks can vary, but common sizes include 600mm x 200mm x 100mm and 600mm x 200mm x 150mm.

    • The prices of AAC blocks depend on factors such as the brand, quality, and qu...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for L&T Construction Assistant Manager interview:
  • Nice

Aker Solutions Interview FAQs

How many rounds are there in Aker Solutions Project Manager interview?
Aker Solutions interview process usually has 1 rounds. The most common rounds in the Aker Solutions interview process are One-on-one Round.
How to prepare for Aker Solutions Project Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Aker Solutions. The most common topics and skills that interviewers at Aker Solutions expect are Design Engineering, Detail Engineering, Project Engineering, Project Engineering Management and Project Scheduling.
What are the top questions asked in Aker Solutions Project Manager interview?

Some of the top questions asked at the Aker Solutions Project Manager interview -

  1. Project execution approach and pha...read more
  2. change managerm...read more

Tell us how to improve this page.

Aker Solutions Project Manager Interview Process

based on 1 interview

Interview experience

4
  
Good
View more
Aker Solutions Project Manager Salary
based on 4 salaries
₹20 L/yr - ₹26 L/yr
35% more than the average Project Manager Salary in India
View more details
Design Engineer
204 salaries
unlock blur

₹4.2 L/yr - ₹14.5 L/yr

Senior Engineer
146 salaries
unlock blur

₹8.2 L/yr - ₹26.7 L/yr

Senior Design Engineer
89 salaries
unlock blur

₹7.1 L/yr - ₹18 L/yr

Engineer
64 salaries
unlock blur

₹4.5 L/yr - ₹13.5 L/yr

Buyer
51 salaries
unlock blur

₹4.2 L/yr - ₹16.5 L/yr

Explore more salaries
Compare Aker Solutions with

L&T Construction

4.0
Compare

Shapoorji Pallonji Group

4.1
Compare

Saint-Gobain

4.0
Compare

Worley

4.1
Compare