Filter interviews by
I applied via Recruitment Consulltant and was interviewed before Jan 2022. There was 1 interview round.
The present salary is confidential and can be discussed during the negotiation process.
It is best to avoid disclosing your current salary during an interview.
Focus on discussing your skills, qualifications, and achievements instead.
If pressed for an answer, politely mention that you prefer to discuss salary expectations based on the responsibilities and requirements of the Assistant Manager role.
Provide examples of you...
Top trending discussions
I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.
HRG stands for Human Resource Group while LRG stands for Large Retail Group.
HRG focuses on managing human resources within an organization
LRG focuses on managing a large retail business
HRG deals with employee relations, recruitment, training, and development
LRG deals with sales, inventory management, customer service, and marketing
Transformer sizing involves calculating the appropriate size of a transformer based on load requirements.
Determine the total load requirements in kVA
Consider the load factor and diversity factor
Calculate the transformer size based on the total load requirements
Ensure the transformer is rated for the appropriate voltage and frequency
Consult with a professional engineer if needed
To work in a metro city with an EPB machine, one must be familiar with its operation and maintenance.
Understand the operation of the EPB machine and follow safety protocols
Regularly maintain and inspect the EPB machine to ensure proper functioning
Coordinate with other team members and stakeholders for efficient project execution
Stay updated on the latest technology and advancements in EPB machines
The VT pump installation process involves several steps. The raising main has multiple valves of different types. The cooling lubrication system is also important.
The VT pump installation process involves selecting the right location for the pump, preparing the foundation, and installing the pump.
The raising main typically has gate valves, check valves, and air release valves.
The cooling lubrication system is responsib...
I am looking for new challenges and opportunities for growth.
Seeking new challenges and opportunities for growth
Wanting to expand my skill set and knowledge
Desire for a higher level of responsibility
Seeking a better work-life balance
Unsatisfied with the current work environment or company culture
I expect a competitive salary that reflects my experience and the responsibilities of the Assistant Manager role.
I am looking for a salary that is in line with industry standards and the level of responsibility associated with the Assistant Manager position.
I have researched the average salary range for Assistant Managers in this industry and location, and I believe my skills and experience warrant a salary within that...
Designing a floating head assembly involves considering various factors such as material selection, sealing mechanisms, and thermal expansion.
Select appropriate materials for the floating head assembly based on the application requirements.
Design effective sealing mechanisms to prevent leakage and ensure proper functioning.
Consider thermal expansion and contraction to accommodate temperature variations.
Ensure proper al...
H2S service for pressure vessel refers to the use of hydrogen sulfide in a pressure vessel.
H2S service involves the handling and containment of hydrogen sulfide gas in a pressure vessel.
Pressure vessels used in H2S service must be designed and constructed to withstand the corrosive effects of hydrogen sulfide.
Special materials and coatings may be required to prevent hydrogen sulfide from corroding the pressure vessel.
R...
Gaskets are mechanical seals used to prevent leakage between two surfaces. There are various types of gaskets available.
Sheet gaskets
Spiral wound gaskets
Ring gaskets
Metallic gaskets
Rubber gaskets
Cork gaskets
Non-asbestos gaskets
posted on 10 Jan 2025
I applied via Naukri.com and was interviewed before Jan 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed before Jun 2023. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.
The productivity of plaster work and tiles is an important factor in construction projects.
Productivity in plaster work can be measured by the amount of plaster applied per hour or per day.
Factors that can affect plaster work productivity include the skill level of the workers, the quality of materials used, and the efficiency of the tools and equipment.
For example, experienced plasterers may be able to apply plaster m...
Centiler beam steel design is a method used to determine the appropriate size and shape of steel beams for structural support.
Centiler beam steel design involves calculating the load and span of the beam to determine the required section modulus.
The section modulus is then used to select the appropriate beam size from standard steel beam tables.
Factors such as the type of load, material properties, and safety factors a...
The density of steel is a measure of its mass per unit volume.
Density of steel is typically measured in units of grams per cubic centimeter (g/cm³) or kilograms per cubic meter (kg/m³).
The density of steel can vary depending on the specific type and composition of the steel.
For example, the density of carbon steel is around 7.85 g/cm³, while stainless steel has a density of about 8 g/cm³.
The density of steel is an impo...
AAC blocks are a type of lightweight concrete blocks used in construction. They come in various sizes and prices.
AAC blocks are made from autoclaved aerated concrete, which is a mixture of cement, lime, sand, water, and an expanding agent.
The size of AAC blocks can vary, but common sizes include 600mm x 200mm x 100mm and 600mm x 200mm x 150mm.
The prices of AAC blocks depend on factors such as the brand, quality, and qu...
based on 4 reviews
Rating in categories
Design Engineer
210
salaries
| ₹3.9 L/yr - ₹14.5 L/yr |
Senior Engineer
137
salaries
| ₹8.1 L/yr - ₹28 L/yr |
Senior Design Engineer
94
salaries
| ₹7.1 L/yr - ₹18 L/yr |
Engineer
62
salaries
| ₹4.3 L/yr - ₹13.5 L/yr |
Buyer
51
salaries
| ₹4.2 L/yr - ₹16.5 L/yr |
TechnipFMC
McDermott International
Saipem
Subsea 7