Filter interviews by
I applied via Recruitment Consulltant and was interviewed before Sep 2021. There were 2 interview rounds.
Top trending discussions
I applied via Naukri.com and was interviewed before Oct 2023. There were 2 interview rounds.
I applied via campus placement at MBM Engineering College, Jodhpur and was interviewed before Oct 2022. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed in May 2022. There were 3 interview rounds.
Last assignment in etp, control parameters.
Utilizing the water after using.best way to reduce effluent.
posted on 6 Jul 2024
To mitigate the cost impact of project delays, focus on improving efficiency, reducing waste, and optimizing resources.
Identify the root causes of the delays and address them promptly.
Implement project management tools and techniques to streamline processes and improve productivity.
Optimize resource allocation to ensure maximum utilization and minimize idle time.
Negotiate with suppliers and vendors for better pricing o...
The carpet area is the area within the walls of the apartment that can be carpeted, while the built-up area includes the carpet area plus the thickness of the walls.
Carpet area is the actual area where you can lay a carpet.
Built-up area includes the carpet area plus the thickness of the walls.
Carpet area is usually around 70-80% of the built-up area.
For example, if the built-up area is 1000 square feet, the carpet area
Electrical instruments interface involves connecting, configuring, and troubleshooting various electrical devices for optimal performance.
Understanding the specifications and requirements of each electrical instrument
Properly connecting the instruments to power sources and other devices
Configuring settings and parameters to ensure accurate readings and functionality
Troubleshooting issues such as faulty connections or m...
I applied via campus placement at MBM Engineering College, Jodhpur and was interviewed before Oct 2022. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed in May 2022. There were 3 interview rounds.
Last assignment in etp, control parameters.
Utilizing the water after using.best way to reduce effluent.
I applied via Naukri.com and was interviewed before Sep 2023. There was 1 interview round.
I have a proven track record of effectively handling equipment in critical condition.
Successfully managed and maintained critical equipment in previous roles
Implemented preventive maintenance strategies to avoid critical failures
Trained team members on proper handling and troubleshooting of critical equipment
I applied via Naukri.com and was interviewed before Oct 2023. There were 2 interview rounds.
based on 2 reviews
Rating in categories
Design Engineer
215
salaries
| ₹3.9 L/yr - ₹14.5 L/yr |
Senior Engineer
136
salaries
| ₹8.1 L/yr - ₹27 L/yr |
Senior Design Engineer
94
salaries
| ₹7.1 L/yr - ₹18 L/yr |
Engineer
62
salaries
| ₹4.3 L/yr - ₹13.5 L/yr |
Buyer
51
salaries
| ₹4.2 L/yr - ₹16.5 L/yr |
TechnipFMC
McDermott International
Saipem
Subsea 7