Upload Button Icon Add office photos

Filter interviews by

Technip Energies Deputy Manager Interview Questions and Answers

Updated 31 Oct 2022

Technip Energies Deputy Manager Interview Experiences

1 interview found

I applied via Recruitment Consulltant and was interviewed in May 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Assignment 

Last assignment in etp, control parameters.

Round 3 - Case Study 

Utilizing the water after using.best way to reduce effluent.

Interview Preparation Tips

Interview preparation tips for other job seekers - Focus on job profile of company and prepared accordingly.

Deputy Manager Jobs at Technip Energies

View all

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
-

I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - Telephonic Call 

(1 Question)

  • Q1. Roles and Responsibilities

I applied via Naukri.com and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. The HR round was very pathetic. Sreethala took my HR round.

Interview Preparation Tips

Interview preparation tips for other job seekers - Please don't waste your precious time in giving the interview for Baker Hughes, Powai
Mumbai location. They will take all the interview rounds. The HR will ask you to submit all documents and last moment they will cancel your candidature without giving you any specific reason.

I applied via Naukri.com and was interviewed before Nov 2019. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. Basics related to piperack design
  • Q2. Design parameters for steel structure
  • Ans. 

    Design parameters for steel structure

    • Load capacity and distribution

    • Material strength and durability

    • Environmental factors such as wind and seismic activity

    • Connection details and joint design

    • Fire resistance and protection measures

  • Answered by AI
  • Q3. Number of years exposure to staad
  • Ans. 

    I have 5 years of exposure to STAAD software.

    • I have used STAAD for various structural analysis and design projects.

    • I am proficient in using STAAD for modeling, analysis, and design of steel and concrete structures.

    • I have experience in using STAAD for seismic analysis and design of structures.

    • I have also used STAAD for foundation design and analysis.

    • I keep myself updated with the latest versions and features of STAAD so

  • Answered by AI
  • Q4. Grating design and deflection limits

Interview Preparation Tips

Interview preparation tips for other job seekers - Be positive & confident

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions
Interview experience
2
Poor
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Referral and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. 1. Safety valve types and selection criteria 2. Thermowell Design concept 3. Diff. Pressure Type Flow meter concept and criteria 4. Cable construction details 5. Hook-Ups details
  • Q2. 1. Installation details 2. Flowmeter straigth lengths requirement

Interview Preparation Tips

Interview preparation tips for other job seekers - On which things you worked on , all basics and details things shall be clear.
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
No response
Round 1 - Technical 

(5 Questions)

  • Q1. About current projects. And more about seismic/ wind loads
  • Q2. How to perform RSM method ?
  • Ans. 

    Response Surface Methodology (RSM) is a statistical technique used to model and analyze the relationship between a response variable and multiple input variables.

    • Design a set of experiments based on a factorial design

    • Collect data from the experiments

    • Fit a regression model to the data

    • Analyze the model to determine optimal input settings for the response variable

  • Answered by AI
  • Q3. Soil test report
  • Q4. Foundation uplift
  • Q5. Connection design
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Which column takes more load short or Long Column
  • Q2. What kind of pressures will impose on the water tank walls during seismic

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared with fundamentals

I applied via Company Website and was interviewed in Nov 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What was your role in recent projects and explain in detail
  • Ans. As well stated in my resume, i had explained all the reponsibilities
  • Answered by Suresh Kumar
  • Q2. How will you be performing in the new job profile if offered the job
  • Ans. The notified job profile is similar to my current role and hence confident to add value.
  • Answered by Suresh Kumar

Interview Preparation Tips

Interview preparation tips for other job seekers - Be honest and confident while answering to the questions.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Apr 2023. There were 2 interview rounds.

Round 1 - Group Discussion 

How to handle team. How you will give satisfactory response to clients

Round 2 - One-on-one 

(1 Question)

  • Q1. How to tackle clients?
  • Ans. 

    Tackling clients involves building relationships, understanding their needs, and providing excellent customer service.

    • Listen actively to clients to understand their needs and concerns

    • Communicate clearly and effectively to address any issues or questions

    • Provide personalized solutions and excellent customer service to build trust and loyalty

    • Follow up with clients to ensure satisfaction and address any further needs

    • Handle...

  • Answered by AI

Technip Energies Interview FAQs

How many rounds are there in Technip Energies Deputy Manager interview?
Technip Energies interview process usually has 3 rounds. The most common rounds in the Technip Energies interview process are Resume Shortlist, Assignment and Case Study.
How to prepare for Technip Energies Deputy Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Technip Energies. The most common topics and skills that interviewers at Technip Energies expect are Recruitment, Transition, MS Office, Procurement and Cost Control.

Tell us how to improve this page.

Technip Energies Deputy Manager Interview Process

based on 1 interview

Interview experience

4
  
Good
View more
Technip Energies Deputy Manager Salary
based on 92 salaries
₹7 L/yr - ₹23 L/yr
42% more than the average Deputy Manager Salary in India
View more details

Technip Energies Deputy Manager Reviews and Ratings

based on 17 reviews

4.1/5

Rating in categories

3.4

Skill development

3.6

Work-life balance

3.7

Salary

3.7

Job security

3.7

Company culture

3.1

Promotions

3.7

Work satisfaction

Explore 17 Reviews and Ratings
Study Manager, Genesis -Chennai

Chennai

10-18 Yrs

Not Disclosed

Study Manager - Genesis

Chennai

15-20 Yrs

Not Disclosed

Explore more jobs
Process Engineer
125 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
117 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Principal Engineer
108 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Piping Designer
99 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
92 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Technip Energies with

L&T Energy Hydrocarbon

3.8
Compare

Baker Hughes

4.0
Compare

McDermott International

4.3
Compare

Saipem

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview