Upload Button Icon Add office photos

Dee Piping System

Compare button icon Compare button icon Compare

Filter interviews by

Dee Piping System Executive Interview Questions and Answers

Updated 6 Oct 2023

Dee Piping System Executive Interview Experiences

1 interview found

Executive Interview Questions & Answers

user image Anonymous

posted on 20 Aug 2023

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Written test taken by the HR
Round 3 - Group Discussion 

About working knowledge as per requirement

Round 4 - HR 

(1 Question)

  • Q1. About Salary nacessary document

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepare fully your self with basic knowledge what are you doing

Interview questions from similar companies

I applied via Naukri.com and was interviewed in May 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Basics and details of compressed air system, EOT cranes,
  • Q2. Basics of stacker reclaimer, bag filter, thickener

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident. Be thorough with the basics. You will clear the interview if you have really worked on the systems.

Interview Questionnaire 

2 Questions

  • Q1. About my company work
  • Q2. About me

Interview Preparation Tips

Round: Resume Shortlist
Experience: technical education
Tips: skill knowdlege

Round: Test
Experience: digital electronics, microprosser, mathmatics,
Tips: objective questions
Duration: 30 minutes
Total Questions: 15

I applied via Walk-in and was interviewed in Jul 2019. There were 5 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Departmental questions were put up.
  • Q2. HR was asking to rate yourself in computer knowledge, punctuality & gentleman.
  • Q3. Senior Director were asking for my personal approach that under whom I was working in my previous organization & also relate to long time career goal.

Interview Preparation Tips

Interview preparation tips for other job seekers - You should reveal truth whoever you are, whatever you know etc.

I applied via Recruitment Consulltant and was interviewed before Mar 2021. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Mostly questions were based on resume. They ask you about your day to day task and how you'd apply those skills to the current role.
Round 2 - Technical 

(1 Question)

  • Q1. 2nd interview was with the divisional head who basically asked what was previously asked in round 1

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company for Mumbai locals, especially if you stay in the vicinity of Kanjurmarg. Usually involves staying overtime as everyone works under pressure owing to very limited resources and too much beurucracy.

Interview Questionnaire 

6 Questions

  • Q1. Percentage of steel in pile
  • Ans. 

    The percentage of steel in a pile varies depending on the type and design of the pile.

    • The percentage of steel in a pile can range from 0% to over 90%.

    • The type of pile (e.g. steel, concrete, timber) and its design (e.g. diameter, length, wall thickness) determine the percentage of steel.

    • Steel piles typically have a higher percentage of steel than other types of piles.

    • The percentage of steel in a pile can also affect its

  • Answered by AI
  • Q2. Pile built-up above cut off level as per IS code
  • Ans. 

    Pile built-up above cut off level as per IS code

    • IS code specifies the maximum allowable pile length above cut off level

    • Pile length above cut off level should not exceed 3 times the pile diameter

    • Built-up pile above cut off level can cause structural instability and failure

  • Answered by AI
  • Q3. Pile vertical tolerance as per IS code
  • Ans. 

    Vertical tolerance for piles as per IS code

    • As per IS 2911-1:2010, the vertical tolerance for piles is +/- 25mm

    • This tolerance is applicable for both driven and cast-in-situ piles

    • The tolerance is measured at the top of the pile and at intervals of 3m along the length

    • If the deviation exceeds the tolerance limit, the pile may need to be rejected or remedial measures taken

  • Answered by AI
  • Q4. Pile concrete consumption +- tolerance
  • Ans. 

    Pile concrete consumption tolerance depends on various factors.

    • Pile diameter and length

    • Concrete mix design

    • Placement method

    • Quality control measures

    • Environmental conditions

    • Tolerance typically ranges from 5-10% of estimated consumption

    • Regular monitoring and adjustment of concrete consumption is necessary

  • Answered by AI
  • Q5. Unit weight of steel
  • Ans. 

    Unit weight of steel is 7850 kg/m³

    • The unit weight of steel is the weight of a specific volume of steel

    • It is measured in kilograms per cubic meter (kg/m³)

    • The unit weight of steel is 7850 kg/m³

    • This value may vary slightly depending on the composition and manufacturing process of the steel

  • Answered by AI
  • Q6. Contractor MB related

I applied via Naukri.com and was interviewed in Mar 2021. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Totally related on work experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Nice

Interview Questionnaire 

2 Questions

  • Q1. Engineering drwaiing
  • Q2. HR questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Oct 2022. There were 5 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

Gd happend on one given topic among group of 10 people

Round 3 - One-on-one 

(2 Questions)

  • Q1. Asked to draw bmd, sfd, and deflecfion diagram for various structures. Stable vs unstable structure identification.
  • Q2. Basic SOM questions
Round 4 - Technical 

(1 Question)

  • Q1. Bmd and sfd questions. Asked to calculate the force in a truss member
Round 5 - HR 

(1 Question)

  • Q1. Basics about background and your work done.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - One-on-one 

(1 Question)

  • Q1. Jobs details regarding previous experience

Dee Piping System Interview FAQs

How many rounds are there in Dee Piping System Executive interview?
Dee Piping System interview process usually has 4 rounds. The most common rounds in the Dee Piping System interview process are HR, Resume Shortlist and Group Discussion.
How to prepare for Dee Piping System Executive interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Dee Piping System. The most common topics and skills that interviewers at Dee Piping System expect are Heavy Fabrication and Store Management.
What are the top questions asked in Dee Piping System Executive interview?

Some of the top questions asked at the Dee Piping System Executive interview -

  1. About Salary nacessary docum...read more
  2. Written test taken by the...read more

Tell us how to improve this page.

Dee Piping System Executive Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 118 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
Bechtel Interview Questions
3.9
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 61 Interviews
Wood Group Interview Questions
3.8
 • 61 Interviews
Psp Projects Interview Questions
3.9
 • 51 Interviews
View all
Dee Piping System Executive Salary
based on 15 salaries
₹3.3 L/yr - ₹6.1 L/yr
5% more than the average Executive Salary in India
View more details

Dee Piping System Executive Reviews and Ratings

based on 6 reviews

4.2/5

Rating in categories

4.3

Skill development

4.3

Work-life balance

4.2

Salary

4.2

Job security

4.2

Company culture

4.2

Promotions

4.2

Work satisfaction

Explore 6 Reviews and Ratings
Assistant Engineer
93 salaries
unlock blur

₹2.9 L/yr - ₹5.5 L/yr

Assistant Manager
83 salaries
unlock blur

₹6.7 L/yr - ₹12.2 L/yr

Senior Engineer
78 salaries
unlock blur

₹4.1 L/yr - ₹9.5 L/yr

Junior Engineer
66 salaries
unlock blur

₹2.8 L/yr - ₹5 L/yr

Engineer
65 salaries
unlock blur

₹3.6 L/yr - ₹7.5 L/yr

Explore more salaries
Compare Dee Piping System with

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.8
Compare

Apco Infratech

3.7
Compare

Saipem

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview