Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Newspaper Ad and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Ask about piping and its code, boilers and its code

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Type of heat exchanger
  • Ans. 

    Heat exchangers are devices used to transfer heat between two or more fluids.

    • There are several types of heat exchangers, including shell and tube, plate heat exchangers, and finned tube heat exchangers.

    • The type of heat exchanger used depends on factors such as the application, fluid properties, and space constraints.

    • For example, shell and tube heat exchangers are commonly used in industrial applications, while plate he...

  • Answered by AI
  • Q2. She'll & tube, plate, double pipe, U-tube, and scrapped surface heat exchanger

Interview Preparation Tips

Interview preparation tips for other job seekers - I want job

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical
Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed before Dec 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Control valves on-off valves
Round 3 - Technical 

(1 Question)

  • Q1. PSV pressure regulators

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical study is important . Basics to be perfect

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions

I applied via Company Website and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. They asked for previous company work management, work culture, work timing & some technical questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Its not so difficult
Just share your work experience
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. PAST EXPERIENCE QUESTIONS

Interview Preparation Tips

Topics to prepare for L&T Energy Hydrocarbon Senior Engineer interview:
  • Piping
Interview preparation tips for other job seekers - GET DETAILS OF CODES AND STANDARDS YOU USED IN WORK

Interview Questionnaire 

5 Questions

  • Q1. Seismic design of building, criteria, type of checks in building with respect to seismic, analysis approach
  • Q2. Pile and foundation detail, structural system in building, shear wall, dual system implications
  • Q3. Steel structure- Class of section, connection detail, slender member design criteria
  • Q4. Building irregularities type
  • Q5. Nature of scope of work performed, understanding of coordination approach, software knowledge

I applied via Company Website and was interviewed in Sep 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. Errection and maintenance related
  • Q2. Installation of b/plant, tower crain etc
  • Q3. Aggregate processing plant, screen house, primary crusher, secondary crusher, conveyor belt errection,fluit coupling repairing work

Interview Preparation Tips

Interview preparation tips for other job seekers - All over India telephonic or walk-in interview please call my no for interview
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. What are your strengths and weaknesses?
Round 3 - Technical 
Round 4 - Technical 
Round 5 - Technical 
Round 6 - One-on-one 

Interview Preparation Tips

Interview preparation tips for other job seekers - Reference not accept

Dee Piping System Interview FAQs

How many rounds are there in Dee Piping System Production Engineer interview?
Dee Piping System interview process usually has 1 rounds. The most common rounds in the Dee Piping System interview process are One-on-one Round.
How to prepare for Dee Piping System Production Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Dee Piping System. The most common topics and skills that interviewers at Dee Piping System expect are ASME Codes, Gujarati, Pressure Vessels and RF Engineering.

Tell us how to improve this page.

Dee Piping System Production Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 119 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
Bechtel Interview Questions
4.0
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 61 Interviews
Wood Group Interview Questions
3.8
 • 61 Interviews
Psp Projects Interview Questions
3.9
 • 52 Interviews
View all
Dee Piping System Production Engineer Salary
based on 16 salaries
₹2.8 L/yr - ₹6.9 L/yr
19% more than the average Production Engineer Salary in India
View more details

Dee Piping System Production Engineer Reviews and Ratings

based on 9 reviews

3.9/5

Rating in categories

4.1

Skill development

3.4

Work-life balance

3.6

Salary

3.7

Job security

4.1

Company culture

3.8

Promotions

3.9

Work satisfaction

Explore 9 Reviews and Ratings
Assistant Engineer
93 salaries
unlock blur

₹2.9 L/yr - ₹5.5 L/yr

Assistant Manager
83 salaries
unlock blur

₹6.7 L/yr - ₹12.2 L/yr

Senior Engineer
78 salaries
unlock blur

₹4.1 L/yr - ₹9.5 L/yr

Engineer
68 salaries
unlock blur

₹3.2 L/yr - ₹7.5 L/yr

Junior Engineer
66 salaries
unlock blur

₹2.8 L/yr - ₹5 L/yr

Explore more salaries
Compare Dee Piping System with

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.8
Compare

Apco Infratech

3.7
Compare

Saipem

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview