Filter interviews by
I applied via Referral and was interviewed before Dec 2022. There were 3 interview rounds.
Permissible limit of tilt and shift for well foundation is typically around 1:40 to 1:60.
Permissible limit of tilt for well foundation is usually around 1:40 to 1:60.
Permissible limit of shift for well foundation is typically around 1:40 to 1:60.
Excessive tilt or shift can lead to structural instability and failure of the foundation.
The weight of cutting edge per running metre is typically calculated based on the material and dimensions of the cutting edge.
The weight of the cutting edge per running metre can vary depending on the material used (e.g. steel, tungsten carbide) and the dimensions of the cutting edge.
For example, a steel cutting edge may weigh around 10-15 kg per running metre, while a tungsten carbide cutting edge may weigh around 20-...
Pile head may be cheapened to reduce construction costs without compromising structural integrity.
Cheaping pile head can be a cost-saving measure in construction projects.
Using cheaper materials or construction methods for pile heads can help reduce overall project expenses.
It is important to ensure that cost-cutting measures do not compromise the structural stability of the pile foundation.
Engineering calculations and...
One method to manage tilt shift is through underpinning, which involves strengthening the foundation of the structure.
Underpinning the foundation to stabilize the structure
Using hydraulic jacks to lift and level the structure
Installing helical piers or micropiles for additional support
The viscosity range of polymers can vary widely depending on the type and molecular weight of the polymer.
Viscosity of polymers can range from low to high depending on the molecular weight and structure.
High molecular weight polymers tend to have higher viscosity.
Examples of polymers with high viscosity include polyethylene glycol and polyvinyl alcohol.
Viscosity can also be affected by temperature and shear rate.
I applied via Approached by Company
posted on 20 Oct 2024
I applied via Walk-in and was interviewed in Sep 2024. There were 2 interview rounds.
The goal of an aptitude test is to predict the ability to learn new skills
I applied via campus placement at National Institute of Technology (NIT), Tiruchirappalli and was interviewed in Nov 2024. There was 1 interview round.
posted on 5 Oct 2024
To determine the workability of concrete mix
To ensure the concrete mix has the desired consistency for proper placement and compaction
To assess the water content in the concrete mix
To check the quality of the concrete mix and its ability to flow and settle
To prevent issues such as segregation and bleeding in the concrete mix
To meet the specifications and requirements of the project
Example: If the slump test result show...
The minimum slump of concrete should be 25 mm according to standards.
The minimum slump of concrete is typically specified by standards such as ASTM or ACI.
A slump test is conducted to measure the consistency of concrete, with a minimum value of 25 mm usually required.
A higher slump value indicates a more workable concrete mix, while a lower value may result in difficulties during placement and compaction.
posted on 21 Jun 2024
I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.
posted on 24 Jun 2024
I applied via Company Website and was interviewed in May 2024. There was 1 interview round.
To cast fast and maintain quality, prioritize proper planning, use high-quality materials, ensure skilled labor, and implement quality control measures.
Proper planning is essential to streamline the casting process and avoid delays.
Use high-quality materials to ensure the durability and strength of the casted structure.
Skilled labor is crucial for precise casting and to avoid errors that may compromise quality.
Implemen...
Managing a department involves effective communication, delegation, organization, and leadership.
Establish clear goals and expectations for the department.
Communicate regularly with team members to ensure everyone is on the same page.
Delegate tasks based on individual strengths and skills.
Provide support and guidance to team members when needed.
Monitor progress and performance to address any issues promptly.
Lead by exa...
posted on 22 Mar 2024
I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.
Seeking new challenges and opportunities for growth.
Desire for career advancement
Looking for new challenges
Seeking better work-life balance
Company restructuring or downsizing
Relocation to a new area
Currently working in a construction company in downtown Los Angeles.
Working in downtown Los Angeles
Construction company
Civil engineering job
based on 7 reviews
Rating in categories
Civil Engineer
38
salaries
| ₹2.5 L/yr - ₹7.4 L/yr |
Senior Engineer
14
salaries
| ₹3.1 L/yr - ₹6.5 L/yr |
Mechanical Engineer
10
salaries
| ₹2.5 L/yr - ₹6.2 L/yr |
Civil Site Engineer
9
salaries
| ₹3.2 L/yr - ₹5.2 L/yr |
Planning Engineer
7
salaries
| ₹4.6 L/yr - ₹7 L/yr |
Larsen & Toubro Limited
Tata Group
Reliance Industries
Adani Group