Permissible limit of tilt and shift for well foundation is typically around 1:40 to 1:60.
Permissible limit of tilt for well foundation is usually around 1:40 to 1:60.
Permissible limit of shift for well foundation is typically around 1:40 to 1:60.
Excessive tilt or shift can lead to structural instability and failure of the foundation.
The weight of cutting edge per running metre is typically calculated based on the material and dimensions of the cutting edge.
The weight of the cutting edge per running metre can vary depending on the material used (e.g. steel, tungsten carbide) and the dimensions of the cutting edge.
For example, a steel cutting edge may weigh around 10-15 kg per running metre, while a tungsten carbide cutting edge may weigh around 20-...
Pile head may be cheapened to reduce construction costs without compromising structural integrity.
Cheaping pile head can be a cost-saving measure in construction projects.
Using cheaper materials or construction methods for pile heads can help reduce overall project expenses.
It is important to ensure that cost-cutting measures do not compromise the structural stability of the pile foundation.
Engineering calculations and...
One method to manage tilt shift is through underpinning, which involves strengthening the foundation of the structure.
Underpinning the foundation to stabilize the structure
Using hydraulic jacks to lift and level the structure
Installing helical piers or micropiles for additional support
The viscosity range of polymers can vary widely depending on the type and molecular weight of the polymer.
Viscosity of polymers can range from low to high depending on the molecular weight and structure.
High molecular weight polymers tend to have higher viscosity.
Examples of polymers with high viscosity include polyethylene glycol and polyvinyl alcohol.
Viscosity can also be affected by temperature and shear rate.
posted on 19 Jul 2017
posted on 10 Sep 2017
I appeared for an interview before Sep 2016.
posted on 29 Jun 2017
I appeared for an interview in Feb 2017.
posted on 10 Sep 2015
I applied via PLACEMENT
posted on 12 May 2018
I applied via Newspaper Ad and was interviewed before Apr 2021. There were 2 interview rounds.
What You know
What you mentioned in resume
posted on 14 Feb 2021
PQC stands for Pavement Quality Concrete. It is a type of concrete used for road construction.
PQC is a high-quality concrete mix used for the construction of rigid pavements.
It is designed to withstand heavy traffic loads and resist wear and tear.
PQC is made with a higher cement content and a lower water-cement ratio than regular concrete.
It is also reinforced with steel bars or fibers to increase its strength and dura...
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
posted on 19 Jun 2022
I applied via Walk-in and was interviewed before Jun 2021. There were 2 interview rounds.
based on 1 interview
Interview experience
based on 7 reviews
Rating in categories
Civil Engineer
38
salaries
| ₹2.5 L/yr - ₹7.4 L/yr |
Senior Engineer
14
salaries
| ₹3.1 L/yr - ₹6.5 L/yr |
Mechanical Engineer
10
salaries
| ₹2.5 L/yr - ₹6.2 L/yr |
Civil Site Engineer
10
salaries
| ₹2.4 L/yr - ₹5.2 L/yr |
Electrical Engineer
7
salaries
| ₹3.7 L/yr - ₹4.8 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures