Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Colliers India Team. If you also belong to the team, you can get access from here

Colliers India Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Colliers India Project Manager Civil Interview Questions and Answers

Updated 27 Feb 2024

Colliers India Project Manager Civil Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Pressure in fire hydrant pipe
  • Ans. 

    Pressure in fire hydrant pipe is determined by factors like water flow rate, pipe diameter, and elevation difference.

    • Pressure in fire hydrant pipe is directly related to the flow rate of water through the pipe.

    • The diameter of the pipe also affects the pressure, with larger diameter pipes resulting in lower pressure loss.

    • Elevation difference between the hydrant and the point of discharge can impact the pressure in the p...

  • Answered by AI
  • Q2. What is NRC full form
  • Ans. 

    NRC stands for National Register of Citizens.

    • NRC is a register containing names of all genuine Indian citizens in the state of Assam, India.

    • It was first prepared in 1951 and is now being updated to identify illegal immigrants.

    • The NRC process involves verifying the citizenship status of individuals based on documents like birth certificates, land records, etc.

  • Answered by AI

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Tell me about your experience?
  • Q2. What salary you expect from us ?
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - Technical 

(3 Questions)

  • Q1. What is the grade of concrete
  • Ans. 

    The grade of concrete refers to its strength and is determined by the ratio of cement to sand to aggregate.

    • The grade of concrete is typically denoted by a number followed by the letter 'M', such as M20, M30, etc.

    • The number in the grade represents the compressive strength of the concrete in megapascals (MPa) after 28 days of curing.

    • For example, M20 concrete has a compressive strength of 20 MPa, while M30 concrete has a ...

  • Answered by AI
  • Q2. What is the unit used for estimating painting work?
  • Ans. 

    The unit used for estimating painting work is square feet.

    • Square feet is commonly used to estimate the amount of paint needed for a project.

    • Other units like square meters can also be used depending on the region.

    • Calculations are based on the surface area to be painted.

  • Answered by AI
  • Q3. What you mean by RL in survey
  • Ans. 

    RL in survey stands for Reduced Level, which is the vertical distance between a point and a reference point.

    • RL is used in surveying to determine the elevation of a point relative to a known reference point.

    • It is commonly used in construction projects to ensure accurate leveling of structures and surfaces.

    • RL can be calculated using leveling instruments such as a dumpy level or a theodolite.

    • For example, if a benchmark ha...

  • Answered by AI
Round 2 - One-on-one 

(2 Questions)

  • Q1. Types of cement
  • Ans. 

    Types of cement include Portland cement, rapid-hardening cement, and sulfate-resistant cement.

    • Portland cement is the most common type and is used in general construction.

    • Rapid-hardening cement sets quickly and is often used in repair work.

    • Sulfate-resistant cement is used in areas where soil or water has high sulfate content.

  • Answered by AI
  • Q2. Size of columns
  • Ans. 

    The size of columns in civil engineering is determined based on the load they will support and the height of the structure.

    • Columns are sized based on the load they will support, with larger loads requiring larger columns.

    • The height of the structure also plays a role in determining column size, with taller structures requiring larger columns for stability.

    • Factors such as material strength, column spacing, and building c...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare for the basic civil engineering concept and knowledge
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

General knowledge skills

Round 2 - Technical 

(5 Questions)

  • Q1. Your previous company experience
  • Ans. 

    Worked as a Project Engineer at a construction company for 5 years.

    • Managed multiple civil engineering projects simultaneously

    • Coordinated with architects, contractors, and clients to ensure project success

    • Performed site inspections and quality control checks

    • Prepared project schedules and budgets

    • Resolved any issues or conflicts that arose during construction

  • Answered by AI
  • Q2. Asking your previous work experience
  • Q3. Structure related questions
  • Q4. Finishing related question
  • Q5. Water proofing related question and Bbs

Interview Preparation Tips

Interview preparation tips for other job seekers - Development your technical knowledge
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Explain mivan slab cycle
  • Ans. 

    Mivan slab cycle is a construction technique using aluminum formwork for casting slabs in a repetitive cycle.

    • Mivan slab cycle involves setting up aluminum formwork panels for casting slabs.

    • The cycle includes fixing reinforcement, pouring concrete, curing, and then dismantling the formwork for reuse.

    • This method is efficient, cost-effective, and results in high-quality finishes.

    • Mivan slab cycle reduces construction time ...

  • Answered by AI
  • Q2. What will you ensure before concreting
  • Ans. 

    Before concreting, ensure proper formwork, reinforcement placement, concrete mix design, and weather conditions.

    • Check formwork for proper alignment and stability

    • Ensure reinforcement bars are correctly placed as per design

    • Verify concrete mix design meets project specifications

    • Monitor weather conditions to prevent issues like rain or extreme temperatures affecting the concrete

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Expected salary if selected
  • Ans. 

    My expected salary is based on my qualifications, experience, and the industry standards.

    • I am looking for a competitive salary that reflects my skills and experience in the civil engineering field.

    • I have researched the average salary range for Civil Site Engineers in this region and industry.

    • I am open to negotiation based on the overall compensation package offered by the company.

    • I am looking for a salary that aligns w...

  • Answered by AI
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Civil engineer 

(2 Questions)

  • Q1. What is concrete
  • Ans. 

    Concrete is a composite material made of cement, water, aggregates, and sometimes additives, used in construction.

    • Concrete is a versatile and durable material used in construction for buildings, bridges, roads, and more

    • It is made by mixing cement, water, and aggregates like sand and gravel

    • Additives can be included to enhance specific properties of the concrete, such as strength or workability

    • Once mixed, concrete harden...

  • Answered by AI
  • Q2. What is BBS & Components
  • Ans. 

    BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars to be used in a construction project.

    • BBS includes details such as bar mark, type of bar, diameter, length, shape, and quantity.

    • It helps in estimating the quantity of steel required for the project.

    • BBS is essential for ensuring the structural integrity and strength of the building.

    • Components of BBS include bending shapes, cutting length,

  • Answered by AI

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Abt work Experience?
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. My experience & my qualification &my knowledge
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. About your self
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Referral and was interviewed in Dec 2023. There were 2 interview rounds.

Round 1 - Group Discussion 

Quality control and waste management

Round 2 - Aptitude Test 

Maths reasoning and core subjects

Interview Preparation Tips

Topics to prepare for Godrej Properties Civil Engineer interview:
  • RCC
Interview preparation tips for other job seekers - Many questions related to ambition box

Colliers India Interview FAQs

How many rounds are there in Colliers India Project Manager Civil interview?
Colliers India interview process usually has 1 rounds. The most common rounds in the Colliers India interview process are Technical.
How to prepare for Colliers India Project Manager Civil interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Colliers India. The most common topics and skills that interviewers at Colliers India expect are Civil Engineering, Civil Project Management and Project Engineering.
What are the top questions asked in Colliers India Project Manager Civil interview?

Some of the top questions asked at the Colliers India Project Manager Civil interview -

  1. What is NRC full f...read more
  2. Pressure in fire hydrant p...read more

Tell us how to improve this page.

Colliers India Project Manager Civil Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

JLL Interview Questions
4.1
 • 352 Interviews
CBRE Interview Questions
4.2
 • 264 Interviews
Sobha Interview Questions
3.9
 • 128 Interviews
Lodha Group Interview Questions
4.0
 • 125 Interviews
DLF Interview Questions
3.9
 • 74 Interviews
Casagrand Interview Questions
3.8
 • 56 Interviews
View all
Colliers India Project Manager Civil Salary
based on 19 salaries
₹8 L/yr - ₹18 L/yr
At par with the average Project Manager Civil Salary in India
View more details

Colliers India Project Manager Civil Reviews and Ratings

based on 3 reviews

4.0/5

Rating in categories

4.0

Skill development

4.0

Work-life balance

4.0

Salary

4.0

Job security

3.7

Company culture

3.7

Promotions

4.0

Work satisfaction

Explore 3 Reviews and Ratings
Assistant Manager
247 salaries
unlock blur

₹4.6 L/yr - ₹12 L/yr

Project Engineer
145 salaries
unlock blur

₹3 L/yr - ₹8.5 L/yr

Project Manager
129 salaries
unlock blur

₹6 L/yr - ₹20 L/yr

Assistant Project Manager
111 salaries
unlock blur

₹5.9 L/yr - ₹12.5 L/yr

Manager
102 salaries
unlock blur

₹6 L/yr - ₹15.5 L/yr

Explore more salaries
Compare Colliers India with

CBRE

4.2
Compare

JLL

4.1
Compare

Cushman & Wakefield

4.2
Compare

Knight Frank

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview