Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Colliers India Team. If you also belong to the team, you can get access from here

Colliers India Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Colliers India Project Engineer Interview Questions and Answers

Updated 23 Jun 2023

Colliers India Project Engineer Interview Experiences

2 interviews found

Project Engineer Interview Questions & Answers

user image DARWIN PRINCE J

posted on 23 Jun 2023

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Basic questions about present job
Round 3 - Technical 

(1 Question)

  • Q1. Basic questions regarding to project

I applied via Naukri.com and was interviewed in Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Related to the works we have handled , project details ,

Interview Preparation Tips

Interview preparation tips for other job seekers - Should be confident about our responsibilities we have handled

Project Engineer Interview Questions Asked at Other Companies

asked in Wipro
Q1. Triangle Star Pattern Task Your task is to print a triangle patte ... read more
asked in Wipro
Q2. Encode The String Problem Statement Given a string S of length N, ... read more
asked in Wipro
Q3. Binary to Decimal Conversion Challenge Transform a given binary n ... read more
asked in Wipro
Q4. Mindbending Product Problem Statement You are given an array ARR ... read more
asked in Wipro
Q5. Difference between compiler and interpreter. Why do you apply to ... read more

Project Engineer Jobs at Colliers India

View all

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

Some general questions

Round 2 - Technical 

(5 Questions)

  • Q1. How to initiate sub structure to finishing work
  • Ans. 

    Initiating substructure to finishing work involves proper planning, coordination, and communication.

    • Develop a detailed project plan outlining the sequence of activities from substructure to finishing work

    • Coordinate with subcontractors and suppliers to ensure timely delivery of materials and equipment

    • Communicate effectively with the project team to ensure everyone is clear on their roles and responsibilities

    • Regularly mo...

  • Answered by AI
  • Q2. How to handle your activities
  • Ans. 

    I handle my activities by prioritizing tasks, setting goals, creating schedules, delegating when necessary, and staying organized.

    • Prioritize tasks based on deadlines and importance

    • Set specific goals for each activity to stay focused

    • Create a schedule or to-do list to track progress

    • Delegate tasks to team members when needed to improve efficiency

    • Stay organized by keeping track of documents, emails, and meetings

  • Answered by AI
  • Q3. What kind of work did your previous company??
  • Ans. 

    My previous company was a construction firm specializing in commercial building projects.

    • Managed project timelines and budgets

    • Coordinated with architects, engineers, and subcontractors

    • Ensured compliance with building codes and regulations

    • Implemented quality control measures

    • Completed projects on time and within budget

  • Answered by AI
  • Q4. What about water proofing ? how to do ??
  • Ans. 

    Waterproofing is the process of making a structure or object resistant to water penetration.

    • Waterproofing can be done using various materials such as membranes, coatings, and sealants.

    • Proper surface preparation is essential before applying waterproofing materials.

    • Regular maintenance and inspections are necessary to ensure the effectiveness of waterproofing.

    • Examples of waterproofing methods include using waterproof memb...

  • Answered by AI
  • Q5. How to do BBS ??
  • Ans. 

    BBS stands for Behavior-Based Safety, a systematic approach to preventing workplace accidents by focusing on behaviors that can lead to incidents.

    • Conduct a thorough analysis of the workplace to identify potential hazards and at-risk behaviors

    • Develop safety procedures and protocols based on the identified hazards

    • Train employees on the importance of following safety protocols and encourage reporting of unsafe behaviors

    • Im...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Learn lot technical knowledge and improve your life..
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected
Round 1 - One-on-one 

(1 Question)

  • Q1. Allowable Tolerance on tiles?
  • Ans. 

    The allowable tolerance on tiles depends on the type of tile and the installation method.

    • Allowable tolerance for ceramic tiles is typically +/- 1/16 inch

    • For larger format tiles, the allowable tolerance may be greater

    • Tolerance for natural stone tiles can vary based on the type of stone and finish

    • Consult manufacturer guidelines for specific tolerance recommendations

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Mar 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Tell me about yourself
  • Q2. Previous company worked with?
  • Q3. Job profile in previous company
  • Q4. Daily activities of previous company
  • Q5. What quality check are doing at aite
  • Ans. 

    We conduct quality checks at every stage of the project to ensure compliance with standards and specifications.

    • Performing visual inspections of materials and equipment

    • Conducting tests and measurements to verify performance

    • Reviewing documentation for accuracy and completeness

    • Implementing corrective actions when deviations are found

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Salary negotiation
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Rate Analysis , Reconciliation of materials
  • Q2. Coefficient of cement
  • Ans. 

    The coefficient of cement is a measure of its ability to expand or contract due to changes in temperature or moisture.

    • The coefficient of cement is also known as the coefficient of thermal expansion.

    • It is an important factor to consider in construction projects to prevent cracking or damage to structures.

    • The coefficient of cement varies depending on the type and composition of the cement.

    • For example, Portland cement typ...

  • Answered by AI
  • Q3. Escalation of materials
  • Ans. 

    Escalation of materials refers to the process of increasing the priority or urgency of obtaining necessary materials for a project.

    • Escalation may occur when there are delays in the delivery of materials or when the demand for materials exceeds the supply.

    • Project managers may escalate materials by contacting suppliers to expedite delivery or by seeking alternative sources for the materials.

    • Escalation can impact project ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company , well balanced life, flexible time
Job security
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Aug 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. About tile works
  • Q2. About mivan structure
Round 2 - One-on-one 

(2 Questions)

  • Q1. Salary of previous company
  • Ans. 

    I am not comfortable disclosing the salary of my previous company.

    • It is not appropriate to discuss previous salary in an interview setting.

    • Focus on discussing the skills and experiences that make you a strong candidate for the position.

    • Salary expectations can be discussed during the negotiation phase if an offer is extended.

  • Answered by AI
  • Q2. Expected salary
  • Ans. 

    My expected salary is negotiable and dependent on the overall compensation package offered.

    • My expected salary is based on my experience, skills, and the responsibilities of the role.

    • I am open to discussing the salary range for this position during the interview process.

    • I am looking for a competitive salary that reflects the market value for my skills and experience.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Chiller efficiency
  • Ans. 

    Chiller efficiency is a measure of how well a chiller unit is able to cool a space while using the least amount of energy.

    • Chiller efficiency is typically measured by the Coefficient of Performance (COP), which is the ratio of cooling output to energy input.

    • Regular maintenance and cleaning of chiller components can improve efficiency.

    • Upgrading to a more energy-efficient chiller model can also increase efficiency.

    • Proper ...

  • Answered by AI
  • Q2. Which one more efficiently? Air cooled,or water cooled???
  • Ans. 

    Water cooled systems are generally more efficient than air cooled systems due to higher heat transfer capabilities.

    • Water has higher heat transfer capabilities compared to air

    • Water cooled systems can maintain more consistent temperatures

    • Water cooled systems are typically used in high performance applications such as data centers and industrial machinery

  • Answered by AI
  • Q3. How we improved duct velocity?
  • Ans. 

    Duct velocity can be improved by increasing the fan speed or reducing the duct size.

    • Increase the fan speed to increase the air velocity in the duct.

    • Reduce the duct size to increase the air velocity.

    • Use dampers or adjustable louvers to control and optimize the airflow.

    • Ensure proper sealing of duct joints to minimize air leakage.

    • Consider using smooth and straight ducts to reduce friction and improve airflow.

    • Regularly cle...

  • Answered by AI
  • Q4. What types of gas use chiller system?
  • Ans. 

    The chiller system uses various types of gases for cooling purposes.

    • Common types of gases used in chiller systems include R-134a, R-410A, and ammonia.

    • R-134a is a hydrofluorocarbon (HFC) refrigerant commonly used in air conditioning systems.

    • R-410A is a blend of hydrofluorocarbons used as a replacement for older refrigerants.

    • Ammonia (NH3) is often used in industrial chiller systems due to its high cooling capacity.

    • Other ...

  • Answered by AI
  • Q5. How we decided the vrf system capacity as per area??
  • Ans. 

    The VRF system capacity is determined based on the area's cooling and heating load requirements.

    • Calculate the total cooling load and heating load for the area

    • Consider factors such as insulation, windows, occupancy, and equipment

    • Select VRF system capacity based on the calculated load requirements

    • Consult with HVAC professionals for accurate sizing

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical round is more important than other rounds so we should prepare that things very easily putting during interview and most important things candidates CV,whatever he mension his cv technically should be know very well' 🙏
Round 1 - HR 

(2 Questions)

  • Q1. Personals information
  • Q2. Work related questions
Round 2 - Technical 

(2 Questions)

  • Q1. About work related questions
  • Q2. Family information and personal goals
Round 3 - HR 

(1 Question)

  • Q1. Final Salary discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - But my advice is don’t join this organization
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Salary details and negotiation
Round 3 - Technical 

(1 Question)

  • Q1. Projects and works done

Colliers India Interview FAQs

How many rounds are there in Colliers India Project Engineer interview?
Colliers India interview process usually has 2-3 rounds. The most common rounds in the Colliers India interview process are Resume Shortlist, Technical and HR.
How to prepare for Colliers India Project Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Colliers India. The most common topics and skills that interviewers at Colliers India expect are Project Management, Project Engineering, Construction Management, Resource Planning and Value Engineering.

Tell us how to improve this page.

Colliers India Project Engineer Interview Process

based on 4 interviews

Interview experience

5
  
Excellent
View more
Colliers India Project Engineer Salary
based on 145 salaries
₹3 L/yr - ₹8.5 L/yr
At par with the average Project Engineer Salary in India
View more details

Colliers India Project Engineer Reviews and Ratings

based on 22 reviews

4.0/5

Rating in categories

3.7

Skill development

4.1

Work-life balance

4.0

Salary

3.9

Job security

4.0

Company culture

3.7

Promotions

3.8

Work satisfaction

Explore 22 Reviews and Ratings
Project Engineer

Ahmedabad

4-8 Yrs

Not Disclosed

Explore more jobs
Assistant Manager
247 salaries
unlock blur

₹4.6 L/yr - ₹12 L/yr

Project Engineer
145 salaries
unlock blur

₹3 L/yr - ₹8.5 L/yr

Project Manager
129 salaries
unlock blur

₹6 L/yr - ₹20 L/yr

Assistant Project Manager
111 salaries
unlock blur

₹5.9 L/yr - ₹12.5 L/yr

Manager
102 salaries
unlock blur

₹6 L/yr - ₹15.5 L/yr

Explore more salaries
Compare Colliers India with

CBRE

4.2
Compare

JLL

4.1
Compare

Cushman & Wakefield

4.2
Compare

Knight Frank

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview