i
Colliers India
Filter interviews by
I applied via Company Website and was interviewed in May 2021. There were 3 interview rounds.
Transformers work by converting electrical energy from one circuit to another through electromagnetic induction.
Transformers have two coils of wire, a primary coil and a secondary coil.
The primary coil is connected to a power source and produces a magnetic field when current flows through it.
The magnetic field induces a voltage in the secondary coil, which is connected to the load.
The voltage in the secondary coil is p...
There can be multiple causes for an alternator to not start.
Dead battery
Faulty alternator
Broken or loose belts
Faulty voltage regulator
Bad wiring or connections
I applied via Walk-in and was interviewed in Jan 2021. There were 3 interview rounds.
Top trending discussions
I applied via Indeed and was interviewed in Nov 2022. There were 3 interview rounds.
I worked as a Shift Engineer at XYZ company.
Managed and maintained the production line equipment
Ensured smooth operations and minimized downtime
Performed routine maintenance and troubleshooting
Collaborated with other departments to improve efficiency
Trained new employees on equipment operation and safety procedures
DG automation refers to the process of automating diesel generators for efficient and reliable power generation.
DG automation involves the use of sensors, controllers, and software to monitor and control the operation of diesel generators.
Automated DG systems can detect faults and take corrective actions, reducing downtime and maintenance costs.
DG automation can also improve fuel efficiency and reduce emissions by opti...
I applied via Referral and was interviewed in Jan 2021. There was 1 interview round.
I applied via Walk-in and was interviewed in Mar 2022. There were 2 interview rounds.
The challenges faced at site include equipment breakdowns, safety hazards, and meeting production targets.
Equipment breakdowns can cause delays and require quick repairs to minimize downtime.
Safety hazards must be identified and addressed to ensure the well-being of workers.
Meeting production targets can be challenging due to unforeseen circumstances or unexpected changes in demand.
Coordination with other departments a...
based on 1 interview
Interview experience
based on 27 reviews
Rating in categories
Assistant Manager
247
salaries
| ₹3.8 L/yr - ₹12 L/yr |
Project Engineer
143
salaries
| ₹3 L/yr - ₹8.5 L/yr |
Project Manager
128
salaries
| ₹6 L/yr - ₹20 L/yr |
Assistant Project Manager
111
salaries
| ₹5.9 L/yr - ₹12.5 L/yr |
Manager
102
salaries
| ₹6 L/yr - ₹15.5 L/yr |
CBRE
JLL
Cushman & Wakefield
Knight Frank