Faster and better experience!
Filter interviews by
I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.
Key tools of lean manufacturing include KANBAN, 5S, and Value Stream Mapping.
KANBAN is a visual scheduling system used to manage inventory and production flow.
5S is a workplace organization method that involves sorting, simplifying, sweeping, standardizing, and sustaining.
Value Stream Mapping is a tool used to analyze and improve the flow of materials and information in a process.
Other tools include Just-In-Time (JIT) ...
CCP stands for Critical Control Point which is a step in the process where control can be applied to prevent, eliminate or reduce a food safety hazard to an acceptable level. Critical Control Limit is the maximum or minimum value to which a biological, chemical or physical parameter must be controlled at a CCP to prevent, eliminate or reduce a food safety hazard to an acceptable level.
CCP is a step in the process where...
Top trending discussions
posted on 23 Aug 2015
I applied via Campus Placement
I applied via Referral and was interviewed before Dec 2022. There were 2 interview rounds.
There are several types of pumps used in various industries and applications.
Centrifugal pumps
Reciprocating pumps
Rotary pumps
Diaphragm pumps
Gear pumps
Peristaltic pumps
Jet pumps
Submersible pumps
Screw pumps
Vane pumps
Handling hazardous chemicals requires proper training, protective equipment, and adherence to safety protocols.
Obtain proper training on handling hazardous chemicals
Wear appropriate personal protective equipment (PPE) such as gloves, goggles, and lab coats
Follow safety protocols and guidelines provided by the chemical manufacturer
Store hazardous chemicals in designated areas with proper labeling
Dispose of hazardous was...
Father is former and mother is house wife
Velox motors Maruti Suzuki as a body shop advisor
Because I am eligible for godrej
I am Adarsh Pandey I am 26 year old leave in Mumbai and complete Mechanical automobile diploma my father is former and mother is house wife
posted on 24 Jan 2025
I was interviewed in Dec 2024.
Vice, gauge, and file are common tools used in mechanical engineering.
Vice is a mechanical device used to hold workpieces securely in place during machining or assembly.
Gauge is a tool used for measuring dimensions or checking the accuracy of machined parts.
File is a tool used for removing material by abrasion, typically used for smoothing or shaping workpieces.
There are several types of files including flat, round, ha
Hacking is the process of cutting or shaping materials using a hacksaw. There are different types of hacksaws for various purposes, including deep hacksaws for cutting thick materials.
Hacking is the process of cutting or shaping materials using a hacksaw
Types of hacksaws include junior hacksaw, coping saw, and power hacksaw
Deep hacksaws are used for cutting thick materials like metal pipes or rods
A punch is a tool used to create holes or indentations in materials. Safety measures are important to prevent accidents. There are various types of safety measures.
A punch is a hand tool with a sharp end used to create holes in materials like metal or leather.
Types of punches include center punch, pin punch, and drive punch.
Safety measures when using punches include wearing safety goggles, using proper technique, and s...
I applied via Walk-in and was interviewed in Dec 2022. There were 3 interview rounds.
Line balancing is the process of evenly distributing workload among workstations in a production line to optimize efficiency.
Line balancing aims to minimize idle time and maximize productivity
It involves assigning tasks to workstations based on their processing times
Example: In a manufacturing plant, line balancing ensures each workstation has a similar amount of work to do
Assembly balancing is the process of optimizing the work distribution among different workstations to improve efficiency and productivity.
Assembly balancing involves assigning tasks to different workstations in a way that minimizes idle time and maximizes throughput.
It helps in achieving a smooth flow of work and prevents bottlenecks in the production process.
Factors considered in assembly balancing include task time, ...
Cycle time is the total time it takes to complete a process, while tact time is the time it takes to produce one unit.
Cycle time includes all the time spent on a process, including wait time and processing time.
Tact time is the rate at which a product must be produced to meet customer demand.
For example, if a process takes 10 minutes to complete and the customer demand is 100 units per hour, the tact time would be 0.6 ...
Production is the process of creating goods or services, while quality refers to the standard of those goods or services.
Production involves the manufacturing or creation of goods or services.
Quality refers to the standard or level of excellence of those goods or services.
Production and quality are closely linked as the goal is to produce high-quality products efficiently.
Examples: In a manufacturing plant, production ...
OLE stands for Overall Equipment Effectiveness and OEE stands for Overall Labor Effectiveness.
OLE measures the overall performance of equipment in a manufacturing plant.
OEE measures the overall performance of labor in a manufacturing plant.
Both metrics are used to identify areas for improvement and optimize efficiency.
Example: OLE can help identify equipment downtime and OEE can help identify labor productivity issues.
7QC tools are a set of quality control tools used to identify and solve quality problems in manufacturing processes.
7QC tools include Pareto chart, cause-and-effect diagram, control chart, histogram, scatter diagram, flowchart, and check sheet.
They help in identifying and analyzing quality problems, determining root causes, and implementing corrective actions.
They are used to improve product quality, reduce defects, an...
PPAP and APQP are quality management systems used in manufacturing.
PPAP stands for Production Part Approval Process and is used to ensure that manufactured parts meet customer requirements.
APQP stands for Advanced Product Quality Planning and is used to plan and manage the design and development of new products.
Both systems are commonly used in the automotive industry but can be applied to other manufacturing industrie...
Pareto is a principle that states 80% of effects come from 20% of causes.
Also known as the 80/20 rule
Used in business to identify the most important factors
Can be applied to various fields such as economics, engineering, and social sciences
Example: 80% of a company's profits come from 20% of its customers
OEE can be calculated by multiplying Availability, Performance, and Quality percentages.
Calculate Availability by dividing Operating Time by Planned Production Time.
Calculate Performance by dividing Actual Production by Maximum Production.
Calculate Quality by dividing Good Units by Total Units Produced.
Multiply Availability, Performance, and Quality percentages to get OEE.
I applied via Referral and was interviewed in Sep 2020. There were 5 interview rounds.
I was interviewed before Jun 2016.
Senior Territory Manager
65
salaries
| ₹0 L/yr - ₹0 L/yr |
Territory Manager
44
salaries
| ₹0 L/yr - ₹0 L/yr |
Key Account Manager
25
salaries
| ₹0 L/yr - ₹0 L/yr |
Business Development Manager
25
salaries
| ₹0 L/yr - ₹0 L/yr |
Area Sales Manager
17
salaries
| ₹0 L/yr - ₹0 L/yr |
Ecolab
3M
Godrej Industries
Hindustan Unilever