I applied via Recruitment Consulltant and was interviewed in Aug 2023. There were 2 interview rounds.
Top trending discussions
I was interviewed before Feb 2024.
posted on 5 Aug 2023
I applied via Recruitment Consulltant and was interviewed in Sep 2022. There were 2 interview rounds.
I applied via Job Fair and was interviewed before Apr 2023. There was 1 interview round.
Regarding electrical project related discussion
I applied via Walk-in and was interviewed in Mar 2022. There were 2 interview rounds.
posted on 29 Mar 2023
I applied via Naukri.com and was interviewed before Mar 2022. There were 2 interview rounds.
The process to control shrinkage in stores involves implementing strict inventory management procedures and conducting regular audits.
Implementing a system for tracking inventory levels and monitoring stock movement
Conducting regular audits to identify any discrepancies or losses
Training staff on proper inventory management procedures and the importance of minimizing shrinkage
Implementing security measures such as CCTV...
posted on 9 Apr 2024
I applied via Walk-in and was interviewed before Apr 2023. There was 1 interview round.
Gravels are used in switch yards to provide a stable surface for equipment and to improve drainage.
Gravels help in reducing the risk of equipment damage due to flooding or standing water.
They also help in preventing erosion and maintaining the stability of the ground.
Gravels are easy to install and maintain, making them a cost-effective option for switch yards.
They allow for better heat dissipation, which is important ...
A Single Line Diagram (SLD) of a 33/11 kV switchyard shows the layout and connections of electrical equipment.
Key equipments include transformers, circuit breakers, isolators, busbars, surge arresters, and control panels.
Transformers step down voltage from 33 kV to 11 kV for distribution.
Circuit breakers protect the system from overloads and short circuits.
Isolators are used for isolating equipment for maintenance.
Busb...
OC and SC tests are conducted on transformers to determine their efficiency and performance under different load conditions.
OC test (Open Circuit test) is conducted to determine the no-load loss and magnetizing impedance of the transformer.
SC test (Short Circuit test) is conducted to determine the full-load copper loss and equivalent resistance of the transformer.
Both tests help in evaluating the efficiency and voltage...
based on 1 interview
Interview experience
based on 6 reviews
Rating in categories
Associate Engineer
160
salaries
| ₹1.8 L/yr - ₹7.5 L/yr |
Quality Engineer
160
salaries
| ₹1 L/yr - ₹5 L/yr |
Quality Inspector
123
salaries
| ₹1.2 L/yr - ₹3.5 L/yr |
Assistant Manager
85
salaries
| ₹7 L/yr - ₹13.5 L/yr |
Senior Technical Officer
83
salaries
| ₹3.2 L/yr - ₹10.1 L/yr |
TE Connectivity
Molex
Delphi Automotive Systems
Jabil