posted on 14 Apr 2022
I applied via Naukri.com and was interviewed in Mar 2022. There were 2 interview rounds.
Line balancing is the process of optimizing workloads across a production line to improve efficiency and reduce bottlenecks.
It involves analyzing the tasks required to complete a product and assigning them to workstations in a way that minimizes idle time and maximizes throughput.
Line balancing can help reduce production costs, increase output, and improve quality.
Examples of line balancing techniques include time stud...
Manpower allocation is based on project requirements, skill sets, availability, and workload.
Manpower allocation is a crucial aspect of production engineering.
It involves identifying the required skill sets for a project.
Availability of resources is also taken into consideration.
Workload is another factor that determines manpower allocation.
The allocation process is dynamic and can change based on project progress and
I applied via Naukri.com and was interviewed before Dec 2021. There were 3 interview rounds.
Kaizen is a Japanese term for continuous improvement and 7QC tools are quality control techniques used to identify and solve problems.
Kaizen involves making small, incremental improvements to processes and systems to increase efficiency and reduce waste.
7QC tools include Pareto charts, cause-and-effect diagrams, flowcharts, histograms, scatter diagrams, control charts, and check sheets.
These tools are used to analyze d...
8D analysis, Six Sigma, and SPC are quality control methodologies used in production engineering.
8D analysis is an eight-step problem-solving methodology used to identify, correct, and prevent recurring problems.
Six Sigma is a data-driven approach to quality control that aims to reduce defects and improve processes.
SPC (Statistical Process Control) is a method of monitoring and controlling a process to ensure it operat...
OEE is a metric used to measure manufacturing productivity. 5 types of wastes are defects, overproduction, waiting, non-utilized talent, and transportation.
OEE stands for Overall Equipment Effectiveness and is a measure of how effectively a manufacturing operation is utilized
It is calculated by multiplying availability, performance, and quality
The 5 types of wastes are defects, overproduction, waiting, non-utilized tal...
I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.
I applied via Job Fair and was interviewed before Apr 2023. There was 1 interview round.
Regarding electrical project related discussion
posted on 29 Mar 2023
I applied via Naukri.com and was interviewed before Mar 2022. There were 2 interview rounds.
The process to control shrinkage in stores involves implementing strict inventory management procedures and conducting regular audits.
Implementing a system for tracking inventory levels and monitoring stock movement
Conducting regular audits to identify any discrepancies or losses
Training staff on proper inventory management procedures and the importance of minimizing shrinkage
Implementing security measures such as CCTV...
posted on 5 Aug 2023
I applied via Recruitment Consulltant and was interviewed in Sep 2022. There were 2 interview rounds.
I applied via Other and was interviewed before Oct 2019. There were 3 interview rounds.
based on 5 interviews
Interview experience
based on 9 reviews
Rating in categories
Associate Engineer
161
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Engineer
160
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Inspector
123
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
85
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Controller
84
salaries
| ₹0 L/yr - ₹0 L/yr |
TE Connectivity
Molex
Delphi Automotive Systems
Jabil