Upload Button Icon Add office photos

Filter interviews by

Chettinad Group Interview Questions and Answers

Updated 30 Apr 2024

Chettinad Group Interview Experiences

Popular Designations

3 interviews found

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
No response

I applied via Approached by Company and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Explain the risk assessment in the audit undertaken by yourself.
  • Ans. 

    Risk assessment in audit involves identifying potential risks, evaluating their likelihood and impact, and developing strategies to mitigate them.

    • Identify key areas of risk in the audit process, such as financial misstatements, fraud, regulatory compliance issues, etc.

    • Assess the likelihood of each risk occurring and the potential impact on the audit findings.

    • Develop risk mitigation strategies, such as increasing sample...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - explain the financial risks and quantify them.

Senior Executive Interview Questions asked at other Companies

Q1. If oneday the men power is very less due to some problem and lode is more that day as a senior Exucative, how will u handle your team ?
View answer (55)

I applied via Approached by Company and was interviewed before Jun 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. All costing related and based on resume questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Be familiar with your areas that you provide in the resume

Deputy Manager Interview Questions asked at other Companies

Q1. 1.WHAT IS SPECIAL OF UR HOME TOWN 2.Who is Main compitetor with us and which products...3.what is main business in your area and its functions...4 Previous comoany achevements 5.Your strengts and weakness.
View answer (67)

I applied via Company Website and was interviewed before Nov 2019. There were 5 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. How do you set your personal and professional goals?
  • Q2. Being in this domain, is it a choice or by chance?
  • Q3. Could you list down your areas of strength and weaknesses?
  • Q4. Have you taken any tough decision for the organisation? Specify

Interview Preparation Tips

Interview preparation tips for other job seekers - Do your research about the organisation before you appear for the interview. List down the strong areas of the company and mention during your interaction. Be specific and honest with your responses.

Vice President (VP) Interview Questions asked at other Companies

Q1. How soon can you grow our business vertical to INR 100 Cr per year?
View answer (2)

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jan 2025.

Round 1 - Technical 

(5 Questions)

  • Q1. What different OPC and premium cement quality ???
  • Q2. What is cement ???
  • Q3. How you convert other brand cement to our brand ??
  • Q4. How handing complain at our running site ???
  • Q5. What's zipsam ??? And how it is work in cement
Round 2 - HR 

(1 Question)

  • Q1. Salary deduction
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - One-on-one 

(3 Questions)

  • Q1. Can you explain the process of designing a specific grade of concrete, including the relevant considerations and calculations involved?
  • Q2. Design a grade of PQC Concrete
  • Q3. Refer relevant IS code, google it and learn it. Take advice of RMC expert

Interview Preparation Tips

Interview preparation tips for other job seekers - Learn about concrete, its raw materials, their testing procedures, and the relevant Indian Standards (IS) codes associated with them. Additionally, understand durability testing and the relevant IS codes. Explore the technical indicators of a Ready Mixed Concrete (RMC) plant, including admixture cost per kilogram of cement and megapascals (MPa), among other factors.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(4 Questions)

  • Q1. What are the basics of Civil Engineering?
  • Ans. 

    Civil engineering involves designing, constructing, and maintaining infrastructure such as buildings, bridges, roads, and dams.

    • Involves designing and planning structures and infrastructure

    • Requires knowledge of materials and construction techniques

    • Focuses on ensuring safety, functionality, and sustainability of projects

    • Examples include designing a new highway, constructing a skyscraper, or repairing a bridge

  • Answered by AI
  • Q2. What is the process for calculating the quantity of building materials?
  • Ans. 

    The process for calculating the quantity of building materials involves determining the dimensions of the structure and using formulas to estimate the required amount of materials.

    • Measure the dimensions of the structure (length, width, height)

    • Calculate the volume of the structure using the formula: Volume = Length x Width x Height

    • Determine the type of material needed (e.g. bricks, concrete, steel)

    • Consult material speci...

  • Answered by AI
  • Q3. Designing of concrete grade.
  • Ans. 

    Designing concrete grade involves selecting the appropriate mix of cement, aggregates, and water to achieve desired strength and durability.

    • Determine the required strength for the concrete based on the project specifications

    • Select the appropriate cement type and content based on the desired strength and durability

    • Choose the right combination of aggregates (such as sand, gravel, or crushed stone) to achieve the desired ...

  • Answered by AI
  • Q4. Causes of faults in concrete and its solution.
  • Ans. 

    Causes of faults in concrete include improper mix design, inadequate curing, and poor workmanship. Solutions involve proper quality control, adequate curing, and skilled labor.

    • Improper mix design: using incorrect proportions of cement, aggregates, and water can lead to weak concrete

    • Inadequate curing: not providing enough moisture or temperature control during the curing process can result in cracks and reduced strength

    • ...

  • Answered by AI

Foreman Interview Questions & Answers

ACC user image Anonymous

posted on 6 Feb 2025

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I was interviewed in Jan 2025.

Round 1 - One-on-one 

(5 Questions)

  • Q1. What are the safety purposes in various contexts?
  • Q2. What is your experience with manpower handling in production environments?
  • Q3. Capacity of crusher
  • Q4. Hall road width and bench hight
  • Q5. Burm ki hight and width
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Artha matic reasoning english

Round 2 - Technical 

(5 Questions)

  • Q1. Marketing skills
  • Q2. Channel sales Field work
  • Q3. Network expansion
  • Q4. Outstanding followup
  • Q5. Dealer sales and project sales
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jan 2025.

Round 1 - Technical 

(2 Questions)

  • Q1. Tap bathroom fittings check and service done
  • Q2. Senior tacnicain pulmber

Interview Preparation Tips

Interview preparation tips for other job seekers - Salary good and maintenance job search
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via campus placement at Jawaharlal College, Balangir and was interviewed in Dec 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

It was good and simple with basics

Round 2 - Technical 

(2 Questions)

  • Q1. What is data science
  • Q2. Explain linear regression

Interview Preparation Tips

Interview preparation tips for other job seekers - Learn basics and explain in detail

Chettinad Group Interview FAQs

How many rounds are there in Chettinad Group interview?
Chettinad Group interview process usually has 1 rounds. The most common rounds in the Chettinad Group interview process are Technical.
How to prepare for Chettinad Group interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Chettinad Group. The most common topics and skills that interviewers at Chettinad Group expect are Corporate Finance, MySQL, Statutory Compliance, Accounting and Accounting System.
What are the top questions asked in Chettinad Group interview?

Some of the top questions asked at the Chettinad Group interview -

  1. Explain the risk assessment in the audit undertaken by yourse...read more
  2. All costing related and based on resume questi...read more

Tell us how to improve this page.

Chettinad Group Interview Process

based on 1 interview

Interview experience

3
  
Average
View more

Interview Questions from Similar Companies

Tata Group Interview Questions
4.2
 • 358 Interviews
Adani Group Interview Questions
3.9
 • 183 Interviews
Essar Group Interview Questions
3.8
 • 28 Interviews
Hinduja Group Interview Questions
4.0
 • 23 Interviews
Murugappa Group Interview Questions
4.1
 • 17 Interviews
Bajaj Group Interview Questions
3.8
 • 3 Interviews
View all

Chettinad Group Reviews and Ratings

based on 52 reviews

3.8/5

Rating in categories

3.7

Skill development

3.8

Work-life balance

3.6

Salary

3.7

Job security

3.7

Company culture

3.2

Promotions

3.6

Work satisfaction

Explore 52 Reviews and Ratings
Junior Engineer
15 salaries
unlock blur

₹2.2 L/yr - ₹3.5 L/yr

Engineer
8 salaries
unlock blur

₹4.3 L/yr - ₹8 L/yr

Deputy Manager
7 salaries
unlock blur

₹6 L/yr - ₹10.8 L/yr

Assistant Engineer
7 salaries
unlock blur

₹3.5 L/yr - ₹5.6 L/yr

Manager
5 salaries
unlock blur

₹12.6 L/yr - ₹15 L/yr

Explore more salaries
Compare Chettinad Group with

Murugappa Group

4.1
Compare

Tata Group

4.2
Compare

Aditya Birla Group

4.1
Compare

Reliance Industries

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview