Filter interviews by
I applied via campus placement at Seth Jai Prakash Mukund Lal Institute of Engineering and Technology, Yamunanagar and was interviewed before Dec 2023. There were 2 interview rounds.
Reasoning, maths & english + 1-2 question on engineering
I am a recent graduate with a degree in Mechanical Engineering and a passion for problem-solving and innovation.
Recent graduate with a degree in Mechanical Engineering
Passionate about problem-solving and innovation
Strong technical skills in CAD software and mechanical design
Experience with project management and teamwork
Excellent communication and interpersonal skills
Top trending discussions
Software or tool test
I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.
posted on 28 Jul 2022
I applied via LinkedIn and was interviewed in Jun 2022. There were 2 interview rounds.
CFBC Boiler related questions
I applied via Recruitment Consulltant and was interviewed before May 2021. There was 1 interview round.
Blinding is the process of isolating a section of a pipeline or equipment to prevent flow or contamination.
Temporary or permanent blinds can be used depending on the situation
Common types of blinds include spectacle blinds, paddle blinds, and bleed rings
Blinding is often used during maintenance or repair work to ensure safety
Blinding can also be used to prevent contamination during storage or transportation
Blinding can...
Before starting work in a refinery equipment, certain procedures must be followed.
Obtain a work permit
Perform a safety check of the equipment
Ensure proper personal protective equipment is worn
Verify that all valves are in the correct position
Confirm that the equipment is properly grounded
Check for any leaks or abnormal conditions
Communicate with other workers in the area
Follow all established procedures and protocols
I will follow the emergency response plan and evacuate the area immediately.
Activate the alarm system to alert others in the area
Put on personal protective equipment (PPE) including a respirator
Evacuate the area immediately and move to a safe location
Notify emergency services and follow the emergency response plan
Monitor the situation and wait for the all-clear signal before returning to the area
I would advise my workers to start unbolting the heat exchanger head from the top and work their way down.
Start from the top and work your way down
Use appropriate tools and safety equipment
Follow proper procedures and guidelines
Ensure all bolts are properly labeled and accounted for
Inspect the gasket and replace if necessary
I applied via Indeed and was interviewed in Apr 2024. There was 1 interview round.
Truss members in tension have forces pulling them apart, while members in compression have forces pushing them together.
Tension members have forces acting away from the joint they are connected to.
Compression members have forces acting towards the joint they are connected to.
Identify tension or compression based on the direction of the force on the member.
Consider the overall equilibrium of forces in the truss to deter...
posted on 22 Feb 2023
HR life cycle refers to the stages of an employee's journey within an organization, from recruitment to exit.
The HR life cycle includes stages such as recruitment, onboarding, performance management, career development, and exit
Recruitment involves sourcing, screening, and selecting candidates for open positions
Onboarding includes orientation, training, and integration into the company culture
Performance management inv...
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
The height of top guard rails, mid rails, and toe board rails varies depending on the specific application and regulations.
The height of top guard rails is typically between 42 and 45 inches above the walking surface.
Mid rails are typically located halfway between the top rail and the walking surface.
Toe board rails are typically between 4 and 6 inches high and are installed at the base of the guardrail system.
Specific...
Safe working load is the maximum weight a structure or equipment can safely support without risk of failure.
SWL is determined by factors such as material strength, design, and intended use.
Formula for SWL varies depending on the type of equipment or structure.
For example, the SWL formula for a crane may take into account the boom length, angle, and weight distribution.
It is important to always follow the manufacturer's...
Mechanical engineers play a crucial role in building a sky-scraper by designing and implementing the mechanical systems.
Designing and implementing HVAC systems to regulate temperature and air quality
Designing and implementing plumbing systems for water supply and drainage
Designing and implementing elevator and escalator systems for vertical transportation
Designing and implementing fire protection systems to ensure safe...
based on 1 review
Rating in categories
Assistant Engineer
16
salaries
| ₹1.8 L/yr - ₹3.6 L/yr |
Engineer
13
salaries
| ₹2.6 L/yr - ₹5.9 L/yr |
Senior Engineer
11
salaries
| ₹3 L/yr - ₹6 L/yr |
Design Engineer
10
salaries
| ₹2.1 L/yr - ₹4 L/yr |
Quality Engineer
8
salaries
| ₹2 L/yr - ₹3.6 L/yr |
BHEL
Larsen & Toubro Limited
Thermax Limited
Siemens