I applied via Referral and was interviewed in Jun 2021. There were 3 interview rounds.
Before, during, and after welding, various aspects are inspected to ensure quality and safety.
Before welding, the materials and equipment are inspected for cleanliness, proper setup, and suitability for the welding process.
During welding, the inspector checks for proper welding technique, adherence to welding procedures, and the quality of welds being produced.
After welding, the inspector inspects the completed welds f...
Fabrication spools must be inspected thoroughly before releasing to the erection site.
Check for any defects or damages on the spool.
Ensure that the spool meets the required specifications and standards.
Verify that all necessary documentation and certifications are in place.
Perform visual and dimensional inspections on the spool.
Conduct hydrostatic testing to check for leaks or other issues.
Ensure that the spool is prop...
I will check both Ground Inspection and IMIR for quality control purposes.
I will check the ground inspection report for any discrepancies or issues with the physical product.
I will also review the IMIR (In-Process Material Inspection Report) to ensure that all necessary inspections and tests have been completed.
I will verify that all required documentation is present and accurate.
I will communicate any issues or concer...
In RT film check, I will inspect for any defects or anomalies in the radiographic image. Sensitivity calculation is the measure of the smallest detectable flaw.
Inspect for any defects or anomalies in the radiographic image
Check for proper exposure and contrast
Ensure that the film is free from any artifacts or processing errors
Calculate the sensitivity of the film to detect the smallest flaw
Use a penetrameter to determi...
Hydro test procedures involve filling a vessel or pipeline with water and pressurizing it to check for leaks or structural integrity.
The vessel or pipeline is filled with water
The water is pressurized to a predetermined level
The pressure is held for a specified amount of time
The vessel or pipeline is inspected for leaks or structural damage
If no issues are found, the water is drained and the vessel or pipeline is deeme...
During spool erection time, I will check for proper alignment, fit-up, welding quality, and dimensional accuracy.
Check for proper alignment of spool components
Ensure fit-up is correct and there are no gaps or misalignments
Inspect welding quality for defects such as cracks, porosity, and incomplete fusion
Verify dimensional accuracy of the spool according to the design specifications
Check for any damage or corrosion on t
Top trending discussions
I applied via Recruitment Consulltant and was interviewed in Dec 2022. There were 2 interview rounds.
based on 4 reviews
Rating in categories
Surveyor
225
salaries
| ₹2.5 L/yr - ₹10.4 L/yr |
Quality Inspector
179
salaries
| ₹1.6 L/yr - ₹8 L/yr |
Chemist
177
salaries
| ₹1.7 L/yr - ₹5.2 L/yr |
Project Coordinator
153
salaries
| ₹2 L/yr - ₹8 L/yr |
Inspection Engineer
136
salaries
| ₹3 L/yr - ₹10 L/yr |
SGS
Intertek
TÜV NORD
DNV