Upload Button Icon Add office photos

Bureau Veritas

Compare button icon Compare button icon Compare

Filter interviews by

Bureau Veritas QC Inspector Interview Questions, Process, and Tips

Updated 12 Feb 2025

Top Bureau Veritas QC Inspector Interview Questions and Answers

  • Q1. What is inspected you before during and after welding ?
  • Q2. How to inspected and released fabrication spool before send to erection site
  • Q3. What you will in check RT films ? What is sensitivity calculation
View all 6 questions

Bureau Veritas QC Inspector Interview Experiences

2 interviews found

QC Inspector Interview Questions & Answers

user image Anonymous

posted on 12 Feb 2025

Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Feb 2024.

Round 1 - HR 

(1 Question)

  • Q1. How much experience
  • Ans. 

    I have 5 years of experience as a QC Inspector in the manufacturing industry.

    • I have 5 years of experience in quality control inspections

    • I am familiar with industry standards and regulations

    • I have experience using various inspection tools and equipment

    • I have conducted audits and implemented corrective actions

    • I have trained new inspectors on quality control procedures

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please check the salary

QC Inspector Interview Questions & Answers

user image Anonymous

posted on 3 Jul 2021

I applied via Referral and was interviewed in Jun 2021. There were 3 interview rounds.

Interview Questionnaire 

8 Questions

  • Q1. What is inspected you before during and after welding ?
  • Ans. 

    Before, during, and after welding, various aspects are inspected to ensure quality and safety.

    • Before welding, the materials and equipment are inspected for cleanliness, proper setup, and suitability for the welding process.

    • During welding, the inspector checks for proper welding technique, adherence to welding procedures, and the quality of welds being produced.

    • After welding, the inspector inspects the completed welds f...

  • Answered by AI
  • Q2. How to inspected and released fabrication spool before send to erection site
  • Ans. 

    Fabrication spools must be inspected thoroughly before releasing to the erection site.

    • Check for any defects or damages on the spool.

    • Ensure that the spool meets the required specifications and standards.

    • Verify that all necessary documentation and certifications are in place.

    • Perform visual and dimensional inspections on the spool.

    • Conduct hydrostatic testing to check for leaks or other issues.

    • Ensure that the spool is prop...

  • Answered by AI
  • Q3. What u will be check on time Ground Inspection or IMIR
  • Ans. 

    I will check both Ground Inspection and IMIR for quality control purposes.

    • I will check the ground inspection report for any discrepancies or issues with the physical product.

    • I will also review the IMIR (In-Process Material Inspection Report) to ensure that all necessary inspections and tests have been completed.

    • I will verify that all required documentation is present and accurate.

    • I will communicate any issues or concer...

  • Answered by AI
  • Q4. What you will in check RT films ? What is sensitivity calculation
  • Ans. 

    In RT film check, I will inspect for any defects or anomalies in the radiographic image. Sensitivity calculation is the measure of the smallest detectable flaw.

    • Inspect for any defects or anomalies in the radiographic image

    • Check for proper exposure and contrast

    • Ensure that the film is free from any artifacts or processing errors

    • Calculate the sensitivity of the film to detect the smallest flaw

    • Use a penetrameter to determi...

  • Answered by AI
  • Q5. What is hydro test procedures?
  • Ans. 

    Hydro test procedures involve filling a vessel or pipeline with water and pressurizing it to check for leaks or structural integrity.

    • The vessel or pipeline is filled with water

    • The water is pressurized to a predetermined level

    • The pressure is held for a specified amount of time

    • The vessel or pipeline is inspected for leaks or structural damage

    • If no issues are found, the water is drained and the vessel or pipeline is deeme...

  • Answered by AI
  • Q6. What u will check at during spool erection time
  • Ans. 

    During spool erection time, I will check for proper alignment, fit-up, welding quality, and dimensional accuracy.

    • Check for proper alignment of spool components

    • Ensure fit-up is correct and there are no gaps or misalignments

    • Inspect welding quality for defects such as cracks, porosity, and incomplete fusion

    • Verify dimensional accuracy of the spool according to the design specifications

    • Check for any damage or corrosion on t

  • Answered by AI
  • Q7. Chemical composition mainly check in SS CS AS materials and grade of AS
  • Q8. Self introduced

Interview Preparation Tips

Interview preparation tips for other job seekers - Nice 45 minutes take time but simple and clear

QC Inspector Interview Questions Asked at Other Companies

Q1. What is inspected you before during and after welding ?
Q2. How to inspected and released fabrication spool before send to er ... read more
Q3. What you will in check RT films ? What is sensitivity calculation
Q4. What u will be check on time Ground Inspection or IMIR
Q5. What is least count of vernier caliper?

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Nov 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Site related activity regarding Quality standards
  • Q2. Present project job working details.
  • Q3. PQR, WPS related questions
  • Q4. Hydrotest regarding
  • Q5. Ndt method, types which you follow
  • Ans. 

    I follow various NDT methods such as visual inspection, liquid penetrant testing, magnetic particle testing, ultrasonic testing, and radiographic testing.

    • Visual inspection involves examining the surface of a component for any visible defects.

    • Liquid penetrant testing uses a liquid dye to detect surface-breaking defects.

    • Magnetic particle testing uses magnetic fields to identify surface and near-surface defects.

    • Ultrasonic...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I have given interview fully confidence and share my knowledge to interviewer. So be carefully give answer which asking.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Dec 2024. There were 2 interview rounds.

Round 1 - Technical 

(5 Questions)

  • Q1. What is the process for installing solar panels, and what are the methods to test their functionality?
  • Ans. 

    The process for installing solar panels involves site assessment, mounting the panels, connecting to the electrical system, and testing functionality.

    • Site assessment to determine optimal location for maximum sunlight exposure

    • Mounting the panels securely on the roof or ground

    • Connecting the panels to the electrical system using inverters and wiring

    • Testing functionality through performance monitoring and inspection

  • Answered by AI
  • Q2. How much type quality test in solar system
  • Ans. 

    Various types of quality tests are conducted in solar systems to ensure efficiency and reliability.

    • Quality tests for solar panels include performance testing, durability testing, and efficiency testing.

    • Other quality tests may involve checking for defects in materials, connections, and overall construction.

    • Regular maintenance and monitoring are also important quality control measures in solar systems.

  • Answered by AI
  • Q3. Installation teat
  • Q4. Trench dept test
  • Q5. Sand bedding test
Round 2 - Case Study 

Diploma in electrical engineering

Interview Preparation Tips

Interview preparation tips for other job seekers - Ensure work quality according to the specifications in the drawing while maintaining effective cost control.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I was interviewed in Aug 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. What is Least count of lathe machine?
  • Ans. 

    The least count of a lathe machine is the smallest measurement that can be read or measured by the machine.

    • The least count of a lathe machine is typically determined by the number of divisions on the main scale and the number of divisions on the Vernier scale.

    • For example, if the main scale has 1 mm divisions and the Vernier scale has 10 divisions that cover 9 mm, the least count would be 0.1 mm.

    • The least count is impor...

  • Answered by AI
  • Q2. Which tool was used to boring machine?
  • Ans. 

    The tool used for boring machine is called a boring bar.

    • Boring bar is a cutting tool used in machining to create holes with precise dimensions and smooth finishes.

    • It is commonly used in metalworking and woodworking industries.

    • Examples of boring bars include solid carbide bars, indexable insert bars, and adjustable bars.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Small or big don't give up job for any situations
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via AmbitionBox and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Related drawing question
  • Q2. Related drawing questions
  • Q3. How to grow production
  • Ans. 

    To grow production, focus on optimizing processes, increasing efficiency, and investing in technology.

    • Analyze current production processes and identify areas for improvement

    • Implement lean manufacturing principles to eliminate waste and increase efficiency

    • Invest in new technology and equipment to improve production speed and quality

    • Train and develop employees to improve skills and knowledge

    • Collaborate with suppliers and...

  • Answered by AI
  • Q4. How to control quantity in production
  • Ans. 

    Quantity control in production can be achieved through various methods.

    • Setting production targets and monitoring progress regularly

    • Implementing quality control measures to avoid defects and rework

    • Using statistical process control techniques to identify and correct variations

    • Regularly auditing the production process to ensure compliance with standards

    • Training and empowering employees to identify and report quality issue...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please ask me drawing or technical questions look like dimension looking view
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Apr 2023. There were 2 interview rounds.

Round 1 - One-on-one 

(5 Questions)

  • Q1. What are the different grades of material you have worked on
  • Ans. I have experience on working with materials SA-516 Gr. 70 and IS-2062 in MS, SS316, SS304, Inconel and Monel
  • Answered by theseventhhokage
  • Q2. What is material specification for piping, forgings fittings tubes fasteners for MS materials
  • Ans. 

    Material specifications for piping, forgings, fittings, tubes, and fasteners for MS materials include ASTM standards and specific grades.

    • ASTM A53/A53M - Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless

    • ASTM A105/A105M - Standard Specification for Carbon Steel Forgings for Piping Applications

    • ASTM A234/A234M - Standard Specification for Piping Fittings of Wrought Carbon Steel ...

  • Answered by AI
  • Q3. What is the difference between SS316 and SS304
  • Ans. 

    SS316 has higher corrosion resistance and strength compared to SS304.

    • SS316 contains molybdenum which enhances its corrosion resistance, while SS304 does not.

    • SS316 is more suitable for use in harsh environments like marine applications, while SS304 is more commonly used in indoor settings.

    • SS316 has higher tensile strength and creep strength than SS304.

  • Answered by AI
  • Q4. Difference between SS316L and SS316
  • Ans. 

    SS316L has lower carbon content than SS316, making it more corrosion resistant and suitable for welding applications.

    • SS316L has lower carbon content (0.03% max) compared to SS316 (0.08% max)

    • SS316L is more corrosion resistant due to the lower carbon content

    • SS316L is commonly used in welding applications where post-weld annealing is not possible

    • SS316 is more commonly used in applications where higher strength is required

  • Answered by AI
  • Q5. Where do we refer the remaining chemical composition for SA-516 Gr. 70 plates
  • Ans. 

    Refer to ASME Section II Part A for remaining chemical composition of SA-516 Gr. 70 plates

    • Refer to ASME Section II Part A for detailed chemical composition

    • Check the material test report (MTR) for specific chemical composition

    • Consult with the manufacturer or supplier for any additional information

  • Answered by AI
Round 2 - Aptitude Test 

Questions related to Standard reference, codes, welding and inspection

Interview Preparation Tips

Topics to prepare for TÜV NORD QA QC Engineer interview:
  • Welding Inspection
  • Impact testing
  • Quality Standards
  • ASME Codes
  • CSWIP
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Dec 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. ALL QUESTIONS RELATED TO ASME AND PED, NDT, MATERIAL, WELDING
  • Q2. They ask you about lot about raw material, WPS PQR, INSPECTION EQUIPMENT REGARDING QUESTIONS

Interview Preparation Tips

Topics to prepare for TÜV NORD Quality Inspector interview:
  • ASME
  • NDT Inspection
  • Raw Material
  • welding technology
  • EQUIPMENT INSPECTION
  • Heat Treatment
Interview preparation tips for other job seekers - If we want to travel lot more than usual you can join this job as Inspection enginer

Interview Questionnaire 

1 Question

  • Q1. Agriculture products
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Coding Test 

.net online coding 100 mins

Bureau Veritas Interview FAQs

How many rounds are there in Bureau Veritas QC Inspector interview?
Bureau Veritas interview process usually has 1 rounds. The most common rounds in the Bureau Veritas interview process are HR.
What are the top questions asked in Bureau Veritas QC Inspector interview?

Some of the top questions asked at the Bureau Veritas QC Inspector interview -

  1. What is inspected you before during and after weldin...read more
  2. How to inspected and released fabrication spool before send to erection si...read more
  3. What you will in check RT films ? What is sensitivity calculati...read more

Tell us how to improve this page.

Bureau Veritas QC Inspector Interview Process

based on 1 interview

Interview experience

2
  
Poor
View more

Interview Questions from Similar Companies

SGS Interview Questions
3.9
 • 92 Interviews
TÜV NORD Interview Questions
3.8
 • 63 Interviews
TÜV SÜD Interview Questions
3.9
 • 60 Interviews
CMS Infosystems Interview Questions
3.6
 • 54 Interviews
Intertek Interview Questions
3.7
 • 50 Interviews
Cashify Interview Questions
3.8
 • 39 Interviews
Titan Eye Plus Interview Questions
4.2
 • 30 Interviews
View all
Bureau Veritas QC Inspector Salary
based on 12 salaries
₹2.2 L/yr - ₹9.4 L/yr
17% less than the average QC Inspector Salary in India
View more details

Bureau Veritas QC Inspector Reviews and Ratings

based on 4 reviews

5.0/5

Rating in categories

4.6

Skill development

4.6

Work-life balance

4.9

Salary

4.9

Job security

4.9

Company culture

4.9

Promotions

4.9

Work satisfaction

Explore 4 Reviews and Ratings
Surveyor
215 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Project Coordinator
170 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Quality Inspector
167 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Chemist
151 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Surveyor
127 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Bureau Veritas with

SGS

3.9
Compare

Intertek

3.8
Compare

TÜV NORD

3.8
Compare

DNV

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview