i
Medhaj Techno Concept
Filter interviews by
I applied via LinkedIn and was interviewed in Aug 2023. There were 4 interview rounds.
Top trending discussions
I applied via Campus Placement and was interviewed before Oct 2022. There were 2 interview rounds.
Electrical and Electronic test
I applied via Recruitment Consultant and was interviewed in Aug 2021. There were 3 interview rounds.
I appeared for an interview in Mar 2023, where I was asked the following questions.
In my previous role as a Project Engineer, I managed engineering projects from conception to completion, ensuring timely delivery and quality.
Led a team of engineers to design and implement a new manufacturing process, resulting in a 20% increase in efficiency.
Coordinated with cross-functional teams to ensure project milestones were met, improving communication and collaboration.
Conducted risk assessments and developed...
Effective interaction and movement of major components ensure project success and efficiency in engineering tasks.
Understand the specifications of each component to ensure compatibility.
Utilize CAD software for precise modeling and visualization of component interactions.
Implement a systematic approach for assembly, such as following a step-by-step guide.
Conduct regular checks and tests during the movement phase to ide...
Tensioning and torquing tools ensure proper fastening and load distribution in engineering projects.
Torque Wrench: Used to apply a specific torque to fasteners, ensuring they are tightened to the correct specification.
Tensioning Tool: Devices like hydraulic tensioners that apply a precise amount of tension to bolts, often used in large structures.
Torque Angle Gauge: Measures the angle of rotation after a fastener has b...
MCC (Motor Control Center) work process involves design, installation, and maintenance of electrical control systems for motors.
Design: Create layout and specifications for the MCC based on project requirements.
Installation: Assemble and install MCC components like circuit breakers, contactors, and control panels.
Testing: Conduct functional tests to ensure all components operate correctly and safely.
Maintenance: Regula...
MCC closing involves safely shutting down a Motor Control Center, ensuring equipment and personnel safety.
1. Ensure all equipment is in a safe state before closing the MCC.
2. Notify all personnel involved in the operation about the MCC closure.
3. Follow lockout/tagout (LOTO) procedures to prevent accidental re-energization.
4. Gradually reduce load on the MCC by shutting down connected equipment.
5. Monitor voltage and c...
Implementing strict protocols and training can prevent tool mishandling and ensure safety on site.
Conduct regular training sessions on proper tool handling and safety protocols.
Implement a tool tracking system to monitor the usage and location of tools.
Establish a designated storage area for tools and components to prevent loss and damage.
Use color-coded tags or labels to identify tools and their designated users.
Condu...
Implementing preventive measures and regular maintenance can effectively control tool damage in engineering projects.
Conduct regular inspections to identify wear and tear, e.g., checking drill bits for dullness.
Implement proper storage solutions to prevent accidental damage, such as using toolboxes or racks.
Train staff on correct usage techniques to minimize misuse, e.g., demonstrating proper handling of power tools.
Es...
Pre-com is the process of preparing and organizing project components before execution.
Define project scope and objectives clearly.
Gather and analyze all necessary data and resources.
Develop a detailed project plan with timelines.
Identify and allocate roles and responsibilities among team members.
Conduct risk assessments and develop mitigation strategies.
A post-com plan outlines the steps for project completion and site handover, ensuring all tasks are finalized efficiently.
Conduct a final site inspection to ensure all work meets quality standards.
Compile and submit all necessary documentation, including as-built drawings and warranties.
Organize a handover meeting with stakeholders to discuss project outcomes and address any concerns.
Ensure all safety measures are revi...
I applied via Walk-in and was interviewed in Aug 2024. There was 1 interview round.
I am a seasoned executive with over 15 years of experience in leading teams and driving business growth.
Over 15 years of executive experience
Proven track record in leading teams
Strong focus on driving business growth
I have a proven track record of exceeding expectations and delivering results in previous roles.
I have relevant experience and skills that align with the requirements of the position.
I am a quick learner and adaptable to new environments.
I am highly motivated and dedicated to achieving success.
I have a strong work ethic and consistently strive for excellence.
I have received positive feedback and recognition for my work...
I appeared for an interview in Feb 2024.
I applied via Naukri.com and was interviewed before Nov 2021. There were 3 interview rounds.
I applied via LinkedIn and was interviewed before Apr 2023. There were 2 interview rounds.
Casestudy on market sizing
based on 2 interviews
Interview experience
based on 25 reviews
Rating in categories
Senior Engineer
188
salaries
| ₹2 L/yr - ₹7.6 L/yr |
Deputy Manager
150
salaries
| ₹3.1 L/yr - ₹9.6 L/yr |
Field Engineer
135
salaries
| ₹1.5 L/yr - ₹4.5 L/yr |
Electrical Engineer
131
salaries
| ₹1.4 L/yr - ₹4 L/yr |
Site Engineer
101
salaries
| ₹1.5 L/yr - ₹4 L/yr |
Bureau Veritas
SGS
CMS Infosystems
Intertek