Q1. How do you interpret contract document and elobrate in the perspective of costing
Interpreting contract documents involves analyzing terms and conditions to determine cost implications.
Reviewing the scope of work outlined in the contract
Identifying all cost components such as materials, labor, equipment, and overhead
Analyzing payment terms and schedules to determine cash flow
Understanding any penalties or incentives related to project completion
Considering potential risks and contingencies that may impact costs
Using software tools like Excel or specialized...read more
Q2. WHAT IS 3PH SUPPLY 415V WHAT IS SINGLE PHASE SUPPLY 230V
3PH supply is a three-phase electrical power supply with 415V voltage, while single-phase supply is a single-phase electrical power supply with 230V voltage.
3PH supply has three alternating currents that are out of phase with each other, while single-phase supply has only one alternating current.
3PH supply is commonly used in industrial and commercial applications, while single-phase supply is used in residential and small commercial applications.
Examples of 3PH supply applic...read more
Tendering Engineer Interview Questions and Answers for Freshers
Q3. Tell me what comprises of a 11kv substation
An 11kv substation typically consists of transformers, circuit breakers, isolators, lightning arresters, busbars, and control panels.
Transformers: Step up or step down voltage for distribution.
Circuit breakers: Protect the system from overloads and short circuits.
Isolators: Provide isolation for maintenance work.
Lightning arresters: Protect equipment from lightning strikes.
Busbars: Distribute power within the substation.
Control panels: Monitor and control the substation opera...read more
Q4. Unit changes in different mode and find Volume of Given figure
The question involves calculating unit changes in different modes and finding the volume of a given figure.
Identify the different modes in which the units are changing
Convert the units to a common measurement system if necessary
Calculate the volume of the given figure using appropriate formulas
Q5. What is the process of tendering?
Tendering is the process of inviting bids from suppliers to provide goods or services at a specified price.
Identify the need for goods or services
Prepare tender documents outlining requirements and specifications
Invite bids from potential suppliers
Evaluate bids based on criteria such as price, quality, and delivery time
Award the contract to the successful bidder
Q6. How do you do rate analysis
Rate analysis involves calculating the rates of various items in a construction project to determine the overall cost.
Gather detailed information on the quantities and specifications of materials, labor, and equipment required for the project.
Determine the unit rates for each item by considering factors such as market prices, labor costs, and equipment rental rates.
Calculate the total cost of each item by multiplying the quantity required by the unit rate.
Sum up the total cos...read more
Share interview questions and help millions of jobseekers 🌟
Q7. What is the Area of Given figure
The area of a figure can be calculated by multiplying its length by its width or using the appropriate formula for the specific shape.
For a rectangle, the area is calculated by multiplying its length by its width: Area = length x width
For a circle, the area is calculated using the formula: Area = π x radius^2
For a triangle, the area is calculated using the formula: Area = 0.5 x base x height
For irregular shapes, the area can be calculated by dividing the shape into smaller, m...read more
Q8. WHAT IS SINGLE PHASE SUPPLY 230V
Single phase supply is a type of electrical power distribution that uses a single alternating current (AC) waveform.
Single phase supply has only one voltage waveform that alternates in a sinusoidal manner.
It is commonly used in residential and small commercial applications.
The voltage of a single phase supply is typically 230V in Europe and 120V in North America.
Single phase supply is not suitable for high power applications and three phase supply is used instead.
Tendering Engineer Jobs
Q9. What is tender ?
A tender is a formal offer or proposal made by a company in response to an invitation to bid for a project or contract.
Tenders are used in the procurement process to select the best supplier or contractor for a project.
They typically include details such as pricing, timelines, and specifications.
Tenders are usually submitted in response to a Request for Proposal (RFP) or Invitation to Tender (ITT).
Q10. Explain earth potential rise?
Earth potential rise is the increase in voltage that occurs when a large current flows into the ground.
Occurs when a large current is injected into the ground
Can be caused by lightning strikes, fault currents, or power system faults
Can lead to dangerous touch and step potentials
Important to consider in grounding and lightning protection systems
Q11. What is Kirchof Law
Kirchhoff's Law states that the total current entering a junction is equal to the total current leaving the junction.
Kirchhoff's Current Law (KCL) states that the algebraic sum of currents entering a node is zero.
Kirchhoff's Voltage Law (KVL) states that the sum of voltage drops in a closed loop is equal to the applied voltage.
These laws are fundamental in analyzing electrical circuits and are used to solve circuit problems.
KCL and KVL are essential for determining unknown cu...read more
Interview experiences of popular companies
Calculate your in-hand salary
Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Reviews
Interviews
Salaries
Users/Month