Execution of MS line, DI line, HDPE line involves proper planning, material selection, installation, and testing.
Plan the layout and route of the lines based on project requirements and specifications.
Select appropriate materials such as MS, DI, or HDPE based on factors like pressure rating, corrosion resistance, and cost.
Ensure proper installation of the lines including welding, jointing, and fittings.
Conduct pressure...
posted on 13 Dec 2022
I applied via Walk-in and was interviewed in Jun 2022. There were 2 interview rounds.
The basic concept for construction of a substation involves site selection, design, equipment installation, and commissioning.
Site selection involves identifying a suitable location for the substation based on factors such as proximity to power sources and load centers.
Design involves creating a plan for the substation layout, including the placement of equipment such as transformers, switchgear, and control systems.
Eq...
Single Line Diagram of Substation is a graphical representation of electrical distribution system in a substation.
It shows the electrical components and their connections in a simplified manner
It helps in understanding the flow of power and voltage levels in the system
It is used for planning, designing, and maintenance of the substation
It includes information about transformers, circuit breakers, busbars, and other equ...
I applied via Walk-in and was interviewed before Jan 2022. There were 3 interview rounds.
Technical questions about civil engineering works
The question is unrelated and consists of three different topics: frog, area of triangle, and types of tiles.
Frog is an amphibian with smooth, moist skin and long hind legs adapted for leaping.
The area of a triangle is calculated by multiplying the base by the height and dividing by 2.
There are various types of tiles such as ceramic, porcelain, mosaic, glass, etc.
I have experience in the field of civil engineering and currently working for a company.
I have a Bachelor's degree in Civil Engineering.
I have worked on various construction projects, including residential and commercial buildings.
I am proficient in using software such as AutoCAD and Revit for designing and drafting.
I have experience in conducting site inspections and ensuring compliance with building codes and regulat...
I applied via Walk-in and was interviewed before Aug 2021. There was 1 interview round.
posted on 10 Sep 2021
I applied via Walk-in and was interviewed before Sep 2020. There were 3 interview rounds.
Concrete is a composite material made up of cement, water, aggregates, and sometimes admixtures.
Concrete is used in construction for building foundations, walls, floors, and other structures.
It is a durable and strong material that can withstand heavy loads and harsh weather conditions.
The strength and durability of concrete can be improved by adding reinforcing materials such as steel bars or fibers.
There are differen...
posted on 23 Oct 2023
I applied via Referral and was interviewed in Sep 2023. There were 2 interview rounds.
posted on 7 May 2023
Grade of concrete refers to the strength of concrete determined by its compressive strength at 28 days.
Grade of concrete is denoted by the ratio of cement, sand, and aggregate used in the mix.
The most commonly used grades of concrete are M20, M25, M30, and M35.
Higher grade of concrete indicates higher strength and durability.
Grade of concrete is determined by conducting compressive strength tests on concrete cubes or c
As a Jr. Engineer Civil, my responsibility is to assist senior engineers in designing, planning, and executing construction projects.
Assist senior engineers in designing and planning construction projects
Execute construction projects as per the plan
Ensure compliance with safety regulations and building codes
Maintain project documentation and communicate progress to stakeholders
based on 1 review
Rating in categories
Project Engineer
83
salaries
| ₹3.6 L/yr - ₹8.4 L/yr |
Project Manager
7
salaries
| ₹5 L/yr - ₹9.6 L/yr |
PMC Engineer
7
salaries
| ₹3 L/yr - ₹7.2 L/yr |
Assistant Project Manager
7
salaries
| ₹4.8 L/yr - ₹9.6 L/yr |
Project Manager Civil
6
salaries
| ₹8.3 L/yr - ₹10 L/yr |
Millennium Engineers & Contractors
Karam Industries
S V S Projects India
MaRS Planning & Engineering Services