Upload Button Icon Add office photos

Filter interviews by

R.V.R. PROJECTS Senior Civil Engineer Interview Questions and Answers

Updated 28 Nov 2023

R.V.R. PROJECTS Senior Civil Engineer Interview Experiences

2 interviews found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. How to execution of ms line , DI line ,HDPE line etc
  • Ans. 

    Execution of MS line, DI line, HDPE line involves proper planning, material selection, installation, and testing.

    • Plan the layout and route of the lines based on project requirements and specifications.

    • Select appropriate materials such as MS, DI, or HDPE based on factors like pressure rating, corrosion resistance, and cost.

    • Ensure proper installation of the lines including welding, jointing, and fittings.

    • Conduct pressure...

  • Answered by AI
  • Q2. Which types of your good skills
  • Q3. Your will work in all location in India
  • Ans. My answer in only mp in india
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - We are advice given that only add cv that points,you do work in job .
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in May 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Group Discussion 

Question & Discussion about previous project, working methods,hindreces, management and other policies of previous companies.

Round 3 - HR 

(2 Questions)

  • Q1. Last & least salary released discussion.
  • Q2. Last company package.
  • Ans. 

    The last company package was competitive and included various benefits.

    • Competitive salary

    • Health insurance

    • Retirement plan

    • Paid time off

    • Performance bonuses

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't lose confidence at the time of interview.

Senior Civil Engineer Interview Questions Asked at Other Companies

Q1. Why reinforcement is provided alternative in column?
Q2. How much accepted 8mm to 10mm steel rod rolling margine value ?
Q3. Do you have idea about safety and safety rules at L&T?
asked in Dr. Reddy's
Q4. What is the estimated cost of 100 feet by 100 feet of office in t ... read more
Q5. What is the slump range for boom pressure?

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jun 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. What is the basics concept used for construction of Substation from start to Finish
  • Ans. 

    The basic concept for construction of a substation involves site selection, design, equipment installation, and commissioning.

    • Site selection involves identifying a suitable location for the substation based on factors such as proximity to power sources and load centers.

    • Design involves creating a plan for the substation layout, including the placement of equipment such as transformers, switchgear, and control systems.

    • Eq...

  • Answered by AI
  • Q2. What is Single Line Diagram of Substation
  • Ans. 

    Single Line Diagram of Substation is a graphical representation of electrical distribution system in a substation.

    • It shows the electrical components and their connections in a simplified manner

    • It helps in understanding the flow of power and voltage levels in the system

    • It is used for planning, designing, and maintenance of the substation

    • It includes information about transformers, circuit breakers, busbars, and other equ...

  • Answered by AI
  • Q3. What is your strength
  • Q4. If the company not provide the payment timely to the contractor, then you will conveyance the contractor for the work

Interview Preparation Tips

Interview preparation tips for other job seekers - Just keep the confidence & positive attitude. Mostly technically & management questions are asked

I applied via Naukri.com and was interviewed before Dec 2020. There were 2 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Execution work Related question
  • Q2. Estimation related questions
  • Q3. Costing and budget of building
  • Ans. 

    Costing and budget of building

    • Costing and budgeting are crucial aspects of any building project

    • It involves estimating the cost of materials, labor, and other expenses

    • Creating a budget helps in managing the project and avoiding overspending

    • Regular monitoring and updating of the budget is necessary to ensure the project stays on track

    • Factors like inflation, unexpected expenses, and changes in scope can impact the budget

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - No o(kkkkkkkkkkkkkk
Okkkk
Okkkkkk
Okkkkkkk
Okkk
Okk
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Nov 2023. There were 3 interview rounds.

Round 1 - Aptitude Test 

Reasoning portion, quantitative aptitude portion

Round 2 - Group Discussion 

Technical group discussion

Round 3 - Technical 

(3 Questions)

  • Q1. Structure related questions
  • Q2. Highway related questions
  • Q3. Earthwork related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Grate
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Not Selected

I applied via Newspaper Ad and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. About Carriageways, Service Roads and patchwork i.e pot Holes, slippage cracks i.e alligator crack, horizontal or vertical crack, Undulating surface,rain cut, Metals beam crash barrier,Gaurd Rail or Mild s...
Round 2 - Technical 

(3 Questions)

  • Q1. Checking level of the layer
  • Q2. Testing the field dry density of the bed like Sub Grade ,GSB,WMM, DBM or BC
  • Q3. Checking the road width

Interview Preparation Tips

Interview preparation tips for other job seekers - Sir I m very hardworker employee .
I m very panchtual for my job duty and going to site daily and prepare daily progress report and also prepare monthly progress report.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is mix design, grade of concerte, and its lab testing name
  • Ans. 

    Mix design is the process of determining the proportions of cement, water, aggregates, and admixtures to produce concrete of desired strength and durability.

    • Grade of concrete refers to the strength of the concrete mix, which is determined by its compressive strength after 28 days of curing.

    • Lab testing for concrete includes tests for compressive strength, slump, air content, and density.

    • Mix design involves selecting the...

  • Answered by AI
  • Q2. Qistion arise from level sheet making ,wmm wbm dbm bc
  • Ans. 

    The question is related to the process of making level sheets using WMM, WBM, DBM, and BC.

    • Level sheet making involves the use of different materials such as WMM, WBM, DBM, and BC.

    • WMM stands for Wet Mix Macadam and is used as a base layer for roads.

    • WBM stands for Water Bound Macadam and is used as a base layer for flexible pavements.

    • DBM stands for Dense Bituminous Macadam and is used as a binder course layer for roads.

    • B...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident during interviews time and negotiating time of salary ,they try to offer less

I applied via Approached by Company and was interviewed in Apr 2022. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. How mutch your working experience?

Interview Preparation Tips

Interview preparation tips for other job seekers - Intrust the field architecture and construction field

I applied via Approached by Company and was interviewed in Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Related to department

Interview Preparation Tips

Topics to prepare for Hyundai Engineering Civil Engineer interview:
  • Related to experience
Interview preparation tips for other job seekers - Please prepare professional cv related to work

I applied via LinkedIn and was interviewed in Feb 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Tell me about yourself.
  • Ans. 

    I am a civil engineer with experience in designing and managing construction projects.

    • I have a Bachelor's degree in Civil Engineering from XYZ University.

    • I have worked on various projects including designing bridges, roads, and buildings.

    • I am skilled in using software such as AutoCAD and Revit for designing.

    • I have experience in managing construction projects and ensuring they are completed on time and within budget.

    • I a...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Thanks for the selection in SCC Infrastructure Pvt Ltd

R.V.R. PROJECTS Interview FAQs

How many rounds are there in R.V.R. PROJECTS Senior Civil Engineer interview?
R.V.R. PROJECTS interview process usually has 2-3 rounds. The most common rounds in the R.V.R. PROJECTS interview process are HR, Resume Shortlist and Group Discussion.
What are the top questions asked in R.V.R. PROJECTS Senior Civil Engineer interview?

Some of the top questions asked at the R.V.R. PROJECTS Senior Civil Engineer interview -

  1. How to execution of ms line , DI line ,HDPE line ...read more
  2. Your will work in all location in In...read more

Tell us how to improve this page.

R.V.R. PROJECTS Senior Civil Engineer Interview Process

based on 2 interviews

Interview experience

4.5
  
Good
View more
R.V.R. PROJECTS Senior Civil Engineer Salary
based on 16 salaries
₹4.5 L/yr - ₹6.6 L/yr
18% less than the average Senior Civil Engineer Salary in India
View more details

R.V.R. PROJECTS Senior Civil Engineer Reviews and Ratings

based on 8 reviews

3.9/5

Rating in categories

3.7

Skill development

3.8

Work-life balance

3.8

Salary

3.2

Job security

3.7

Company culture

3.2

Promotions

3.7

Work satisfaction

Explore 8 Reviews and Ratings
Senior Engineer
49 salaries
unlock blur

₹4.3 L/yr - ₹8.6 L/yr

Civil Engineer
42 salaries
unlock blur

₹2.4 L/yr - ₹6.5 L/yr

Mechanical Engineer
40 salaries
unlock blur

₹2 L/yr - ₹6 L/yr

Junior Engineer
37 salaries
unlock blur

₹1.8 L/yr - ₹3.8 L/yr

Safety Executive
32 salaries
unlock blur

₹2.2 L/yr - ₹4.2 L/yr

Explore more salaries
Compare R.V.R. PROJECTS with

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Hindustan Construction Company

4.2
Compare

Shapoorji Pallonji Group

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview