Upload Button Icon Add office photos

BT Business

Compare button icon Compare button icon Compare

Filter interviews by

BT Business Scrum Master Interview Questions and Answers

Updated 18 Feb 2024

BT Business Scrum Master Interview Experiences

1 interview found

Scrum Master Interview Questions & Answers

user image Anonymous

posted on 18 Feb 2024

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Feb 2023. There were 2 interview rounds.

Round 1 - Coding Test 

Java c python testing

Round 2 - HR 

(2 Questions)

  • Q1. Expected salary
  • Q2. Nothing much asked

Interview Preparation Tips

Topics to prepare for BT Business Scrum Master interview:
  • Agile Methodology
  • Scrum Master
Interview preparation tips for other job seekers - Do well to crack

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jun 2023. There were 3 interview rounds.

Round 1 - Technical 

(5 Questions)

  • Q1. Quantity of steel in over head tanks of various capacities.
  • Ans. 

    The quantity of steel in overhead tanks varies based on their capacities.

    • The quantity of steel required for an overhead tank depends on the size and shape of the tank.

    • Calculations involve determining the surface area of the tank walls and base, and the thickness of the steel used.

    • Different capacities of overhead tanks will require different amounts of steel.

    • For example, a 1000 liter tank will require less steel compare

  • Answered by AI
  • Q2. How many days a over head tank take to finish?
  • Ans. 

    The time it takes to finish an overhead tank depends on various factors such as size, materials used, labor availability, and weather conditions.

    • Factors affecting the time to finish an overhead tank include size of the tank, materials used, labor availability, and weather conditions.

    • For example, a small overhead tank made of concrete may take a few days to finish, while a larger tank made of steel could take weeks.

    • Effi...

  • Answered by AI
  • Q3. Process of hydro pressure tesing of line .
  • Ans. 

    Hydro pressure testing of a line involves filling the line with water and pressurizing it to check for leaks or weaknesses.

    • Fill the line with water to the required pressure level

    • Monitor the pressure for a specified duration to ensure it remains stable

    • Inspect the line for any leaks or weaknesses

    • Release the pressure and drain the water from the line after testing

    • Document the results and any necessary repairs or maintenan

  • Answered by AI
  • Q4. Full form of HDPE pipe .
  • Ans. 

    High Density Polyethylene pipe

    • HDPE stands for High Density Polyethylene

    • HDPE pipes are commonly used in water supply, drainage, and gas distribution systems

    • They are known for their durability, flexibility, and resistance to corrosion

    • HDPE pipes are lightweight and easy to install, making them a popular choice in construction projects

  • Answered by AI
  • Q5. Process of air valve, sluice valve and scour valve and fire hydrant fixing .
Round 2 - Technical 

(2 Questions)

  • Q1. Vendor development of execution work .
  • Ans. 

    Vendor development of execution work involves building relationships with vendors to ensure successful completion of project tasks.

    • Identify potential vendors who can provide the required services or products

    • Negotiate contracts and agreements with vendors to establish terms and conditions

    • Monitor vendor performance to ensure they meet project requirements and deadlines

    • Provide feedback to vendors to improve their performa...

  • Answered by AI
  • Q2. Team management
Round 3 - HR 

(3 Questions)

  • Q1. Previous employment salery
  • Q2. Previous employment roles and responsibilities
  • Ans. 

    Managed multiple projects simultaneously, overseeing timelines, budgets, and resources.

    • Led cross-functional teams to ensure project goals were met

    • Developed project plans and schedules

    • Monitored project progress and reported updates to stakeholders

    • Identified and resolved project issues and risks

    • Managed project budgets and resources effectively

  • Answered by AI
  • Q3. Expectations of salery
  • Ans. 

    I have researched the average salary range for Project Managers in this industry and location.

    • Researched average salary range for Project Managers in industry and location

    • Considered my experience, skills, and qualifications when determining salary expectations

    • Open to negotiation based on benefits package and growth opportunities

  • Answered by AI

I applied via Naukri.com and was interviewed in Sep 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Simple process..basic questions about your profile and about skills you mention in your CV

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident about your roles in your current organization. Ask them questions about the roles they are offering because their JD is not much clear.

I applied via LinkedIn and was interviewed before Nov 2021. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Written test based on mathematical..analytical

Round 3 - Technical 

(1 Question)

  • Q1. Technical based upon telecom
Round 4 - HR 

(1 Question)

  • Q1. Hr round based upon family and salary

Interview Preparation Tips

Interview preparation tips for other job seekers - Focus upon the question based upon telecom only. Fundamentals and basic need of telecomunication
Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
-

I applied via Job Portal and was interviewed in Feb 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. One and one round with Project Delivery manager and then HR round
  • Q2. Technical and project related questions which relevant with post i applied
Round 3 - HR 

(1 Question)

  • Q1. About the experience on related field.

Interview Questionnaire 

2 Questions

  • Q1. Based on my cv
  • Q2. Nothing more

Interview Preparation Tips

Interview preparation tips for other job seekers - Time taking to get response

I applied via Naukri.com

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Pure questions on Informatica sql unix
Round 3 - HR 

(1 Question)

  • Q1. About role and package

Interview Preparation Tips

Interview preparation tips for other job seekers - Please keep efforts and do it then all will come to u
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Sql realted questions
  • Q2. Sas related questions

Interview Questionnaire 

2 Questions

  • Q1. Simple
  • Q2. Based on experience

I applied via Referral and was interviewed before Jan 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Where do you see yourself in next 5 years
  • Q2. Golden rules of accouing
  • Ans. 

    Golden rules of accounting include consistency, relevance, reliability, comparability, and understandability.

    • Consistency: using the same accounting methods and principles consistently over time

    • Relevance: ensuring that financial information is relevant to the decision-making needs of users

    • Reliability: ensuring that financial information is accurate and can be relied upon

    • Comparability: ensuring that financial information...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please don't go to finance department.
Poor work life balance.
Poor salary hike.
Toxic work environment

Good things are
you will learn many things like soft skill. Excel reporting others stuff. You will lot of exposure.

BT Business Interview FAQs

How many rounds are there in BT Business Scrum Master interview?
BT Business interview process usually has 2 rounds. The most common rounds in the BT Business interview process are Coding Test and HR.
How to prepare for BT Business Scrum Master interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at BT Business. The most common topics and skills that interviewers at BT Business expect are Agile, Scrum, Scrum Master, Agile Development and Agile Methodology.

Tell us how to improve this page.

BT Business Scrum Master Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Cisco Interview Questions
4.2
 • 375 Interviews
Indus Towers Interview Questions
3.8
 • 184 Interviews
Nvidia Interview Questions
3.7
 • 108 Interviews
Tejas Networks Interview Questions
4.0
 • 76 Interviews
Arista Networks Interview Questions
4.1
 • 43 Interviews
ITI Interview Questions
3.6
 • 34 Interviews
View all

Fast track your campus placements

View all
BT Business Scrum Master Salary
based on 6 salaries
₹26 L/yr - ₹40 L/yr
56% more than the average Scrum Master Salary in India
View more details
Associate Engineer
285 salaries
unlock blur

₹3 L/yr - ₹6 L/yr

Associate
284 salaries
unlock blur

₹1.8 L/yr - ₹7 L/yr

Project Manager
263 salaries
unlock blur

₹6.9 L/yr - ₹29.2 L/yr

Financial Analyst
225 salaries
unlock blur

₹8.5 L/yr - ₹23 L/yr

Service Reliability Engineer
222 salaries
unlock blur

₹3 L/yr - ₹10 L/yr

Explore more salaries
Compare BT Business with

Sterlite Technologies

3.8
Compare

Indus Towers

3.8
Compare

Cisco

4.2
Compare

Lumen Technologies

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview