Filter interviews by
I was interviewed in Jun 2021.
The loads considered in telecom towers design include wind loads, dead loads, ice loads, and equipment loads.
Wind loads: Towers are designed to withstand the force of wind at different speeds and directions.
Dead loads: These include the weight of the tower structure itself and any permanent fixtures.
Ice loads: Towers in cold climates need to be designed to support the weight of ice accumulation.
Equipment loads: The wei...
Wind load calculation as per IS875 involves determining the wind pressure acting on the structure and calculating the resultant force.
Wind pressure is calculated based on the wind speed and the terrain category of the site
The pressure coefficients for different parts of the structure are determined based on the shape and orientation of the surface
The wind load acting on the structure is calculated by multiplying the pr...
I was interviewed in Sep 2024.
Dynamic sales professional with over 8 years of experience in driving revenue growth and managing high-performing sales teams.
Started my career as a Sales Executive at XYZ Corp, where I exceeded sales targets by 30% in my first year.
Promoted to Sales Manager at ABC Ltd, leading a team of 10 and implementing strategies that increased market share by 15%.
Developed strong relationships with key clients, resulting in a 25%...
Balancing work involves effective time management, prioritization, and maintaining a healthy work-life balance.
Set clear priorities: Identify urgent tasks and focus on them first. For example, use the Eisenhower Matrix to categorize tasks.
Establish a routine: Create a daily schedule that allocates specific time blocks for work and personal activities.
Use technology: Leverage tools like calendars and task management app...
Effective team management involves clear communication, motivation, and performance tracking to achieve sales goals.
Set clear goals: Define specific sales targets for each team member, e.g., increasing sales by 20% in Q2.
Foster open communication: Hold regular one-on-one meetings to discuss challenges and provide feedback.
Encourage collaboration: Organize team-building activities to strengthen relationships and improve...
My goal is to drive sales growth, build strong client relationships, and lead a high-performing sales team to exceed targets.
Achieve a 20% increase in sales within the first year by implementing targeted marketing strategies.
Develop and maintain strong relationships with key clients, ensuring their needs are met and exceeded.
Lead and mentor a sales team, fostering a culture of collaboration and continuous improvement.
U...
My notice period is 30 days.
My notice period is standard 30 days as per company policy.
I am required to serve a 30-day notice period before leaving my current position.
I can start the new role after completing the 30-day notice period.
I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.
A test designted to determine a persons ability in a perticular person skills are field of knowledge.
Bondada Engineering interview questions for popular designations
I applied via Referral and was interviewed in Sep 2023. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Sep 2023. There were 3 interview rounds.
The topic is About AI in market
I applied via Approached by Company and was interviewed in Oct 2023. There were 2 interview rounds.
I applied via Company Website and was interviewed before Oct 2023. There was 1 interview round.
Designed and analyzed a multi-story residential building using software like ETABS and STAAD Pro.
Designed structural elements such as beams, columns, and slabs to ensure safety and stability.
Analyzed the building for various loads including dead, live, wind, and seismic loads.
Used software like ETABS and STAAD Pro for structural analysis and design.
Collaborated with architects and other engineers to ensure the structur...
I was interviewed before Jun 2023.
I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.
To start OFC cable blowing, follow these steps
Ensure that the ducts are clean and free of any obstruction
Attach the cable blowing machine to the duct
Connect the cable to the machine and start the blowing process
Monitor the cable's progress and adjust the machine's speed as needed
Once the cable has been blown through the entire length of the duct, detach the machine and cable
I applied via Referral and was interviewed before Nov 2022. There were 2 interview rounds.
Top trending discussions
The duration of Bondada Engineering interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 11 interviews
Interview experience
based on 138 reviews
Rating in categories
Hyderabad / Secunderabad,
Narketpalle
+10-5 Yrs
Not Disclosed
Design Engineer
10
salaries
| ₹0 L/yr - ₹0 L/yr |
HR Executive
9
salaries
| ₹0 L/yr - ₹0 L/yr |
MIS Executive
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy General Manager
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
TCS
BHEL
Thermax Limited