Upload Button Icon Add office photos

Filter interviews by

BASIS MOLD INDIA Interview Questions and Answers

Be the first one to contribute and help others!

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2024. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. They asked to tell about ourselves and then why did you skipped that previous job?
Round 2 - Technical 

(2 Questions)

  • Q1. Shoot the questions about Injection Moulding and Paint Shop as well I have been worked before..
  • Q2. Ask about the QMS, IATF and SQ Mark

Interview Preparation Tips

Interview preparation tips for other job seekers - Ask questions with regarding with his/her previous work experience.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Dec 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Basic instrumentation questions
  • Q2. Plc , scada
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(1 Question)

  • Q1. What is your knowledge regarding the infrastructure of System Center Configuration Manager (SCCM) and Microsoft Intune?
Round 2 - HR 

(1 Question)

  • Q1. How flexible are you regarding your work schedule?
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. How can bring transformation in the operations scaleup
  • Ans. 

    Transformation in operations scaleup can be achieved through strategic planning, process optimization, technology integration, and continuous improvement.

    • Develop a comprehensive strategic plan outlining goals, objectives, and key performance indicators for the scaleup process.

    • Optimize existing processes to eliminate inefficiencies and streamline operations for increased productivity.

    • Integrate technology solutions such ...

  • Answered by AI
  • Q2. Expected salary
  • Ans. 

    My expected salary is negotiable and dependent on the overall compensation package offered.

    • I am open to discussing salary based on the responsibilities and benefits provided in the role.

    • I am looking for a competitive salary that aligns with industry standards and my level of experience.

    • I am also interested in opportunities for performance-based bonuses or incentives.

    • I am flexible and willing to consider different compe...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Do not waste your time
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Production targets
  • Ans. 

    Production targets are set goals for the quantity and quality of products to be produced within a specific timeframe.

    • Production targets are typically set based on market demand, available resources, and production capacity.

    • Targets should be realistic, achievable, and aligned with overall business objectives.

    • Regular monitoring and adjustment of targets may be necessary to ensure optimal production efficiency.

    • Examples: S...

  • Answered by AI
  • Q2. Quality products
  • Q3. Empty tube making

Interview Preparation Tips

Interview preparation tips for other job seekers - Production targets and goals quality products is good making in tha machine
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Kleanchute installation across residential apartments
  • Ans. 

    Kleanchute installation involves implementing waste disposal systems in residential apartments.

    • Consider the layout and size of the apartments to determine the best placement for Kleanchutes.

    • Ensure proper ventilation and safety measures are in place during installation.

    • Train residents on how to use the Kleanchute system effectively to avoid blockages or malfunctions.

  • Answered by AI
  • Q2. Siphonic drainage system
  • Ans. 

    A siphonic drainage system is a type of drainage system that uses the siphonic action to quickly remove large volumes of water from a building or area.

    • Utilizes the siphonic action to create a vacuum and rapidly drain water

    • Ideal for areas with high rainfall or where large volumes of water need to be removed quickly

    • Requires fewer and smaller pipes compared to traditional drainage systems

    • Commonly used in commercial buildi

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Nothing
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

I was good.reasoning , mathematics question and historical.

Round 2 - One-on-one 

(1 Question)

  • Q1. Tell me your self ,past experience brief,job profile which is suitable for current company ,reason why we select you

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident,share step by step process of previous job profile
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Why u want to change
  • Q2. Why this salary

Interview Preparation Tips

Interview preparation tips for other job seekers - never join
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-

I was interviewed in Nov 2024.

Round 1 - Technical 

(1 Question)

  • Q1. Your role in previous org
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

One by one excel data arrange and same as copy pest

Interview Preparation Tips

Interview preparation tips for other job seekers - Please Chek and review after that join

Tell us how to improve this page.

Interview Questions from Similar Companies

UNO Minda Interview Questions
4.0
 • 168 Interviews
Bharat Forge Interview Questions
3.9
 • 55 Interviews
Rane (Madras) Interview Questions
4.0
 • 33 Interviews
View all

BASIS MOLD INDIA Reviews and Ratings

based on 16 reviews

4.3/5

Rating in categories

4.5

Skill development

3.8

Work-life balance

3.8

Salary

3.7

Job security

4.0

Company culture

4.0

Promotions

4.2

Work satisfaction

Explore 16 Reviews and Ratings
Tool Room Engineer
11 salaries
unlock blur

₹2.5 L/yr - ₹5.4 L/yr

Senior Engineer
7 salaries
unlock blur

₹4 L/yr - ₹6 L/yr

Tool & DIE Maker
6 salaries
unlock blur

₹1.7 L/yr - ₹3.5 L/yr

EDM Operator
6 salaries
unlock blur

₹2.5 L/yr - ₹3.8 L/yr

Tool Maker
5 salaries
unlock blur

₹1.9 L/yr - ₹3 L/yr

Explore more salaries
Compare BASIS MOLD INDIA with

Precision Camshafts

3.2
Compare

Sundaram Clayton

4.1
Compare

Samvardhana Motherson Group

3.7
Compare

Endurance Technologies

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview