i
Sangir Plastics
Filter interviews by
I applied via Approached by Company and was interviewed in Mar 2024. There was 1 interview round.
Kleanchute installation involves implementing waste disposal systems in residential apartments.
Consider the layout and size of the apartments to determine the best placement for Kleanchutes.
Ensure proper ventilation and safety measures are in place during installation.
Train residents on how to use the Kleanchute system effectively to avoid blockages or malfunctions.
A siphonic drainage system is a type of drainage system that uses the siphonic action to quickly remove large volumes of water from a building or area.
Utilizes the siphonic action to create a vacuum and rapidly drain water
Ideal for areas with high rainfall or where large volumes of water need to be removed quickly
Requires fewer and smaller pipes compared to traditional drainage systems
Commonly used in commercial buildi
Top trending discussions
posted on 18 Oct 2024
I applied via Walk-in and was interviewed in Sep 2024. There were 2 interview rounds.
posted on 21 Aug 2024
I applied via Referral and was interviewed before Aug 2023. There was 1 interview round.
Experienced retail professional with 5+ years in management roles. Skilled in team leadership, customer service, and inventory management.
5+ years of experience in retail management
Strong leadership skills
Excellent customer service abilities
Proficient in inventory management
Managed a team of 15 employees at previous job
Pitching the product involves highlighting its key features, benefits, and unique selling points to potential customers.
Identify the target audience and tailor the pitch to their needs and preferences
Focus on the product's unique selling points and how it solves a problem or fulfills a need
Use storytelling and real-life examples to make the pitch more engaging and relatable
Highlight any special promotions, discounts, o...
There are different types of maintenance such as corrective, preventive, predictive, and proactive. Achievements include reducing downtime and increasing equipment lifespan.
Corrective maintenance involves fixing equipment after it has failed.
Preventive maintenance involves regularly scheduled maintenance to prevent equipment failure.
Predictive maintenance involves using data and analytics to predict when maintenance is...
I applied via Naukri.com and was interviewed in Aug 2021. There was 1 interview round.
I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.
Production targets are set goals for the quantity and quality of products to be produced within a specific timeframe.
Production targets are typically set based on market demand, available resources, and production capacity.
Targets should be realistic, achievable, and aligned with overall business objectives.
Regular monitoring and adjustment of targets may be necessary to ensure optimal production efficiency.
Examples: S...
posted on 15 Mar 2023
I applied via Naukri.com and was interviewed before Mar 2022. There were 4 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Jan 2024. There was 1 interview round.
One difficulty faced while processing is managing unexpected equipment failures.
Managing unexpected equipment failures can lead to delays in production.
Finding alternative solutions or repairing the equipment quickly is crucial.
Implementing preventive maintenance strategies can help reduce the frequency of equipment failures.
posted on 25 Oct 2024
Seeking new challenges and opportunities for growth in a dynamic sales environment.
Looking for new challenges and opportunities for professional growth
Interested in working in a more dynamic sales environment
Seeking a company with better career advancement prospects
I have over 5 years of experience in sales, with a proven track record of exceeding targets and building strong client relationships.
Managed a portfolio of key accounts, consistently meeting and exceeding sales targets
Developed and implemented strategic sales plans to drive revenue growth
Built and maintained strong relationships with clients, resulting in high customer satisfaction and repeat business
based on 1 interview
Interview experience
Assistant Engineer
12
salaries
| ₹2.2 L/yr - ₹5 L/yr |
Project Engineer
9
salaries
| ₹2.4 L/yr - ₹4.2 L/yr |
Assistant Engineer Production
7
salaries
| ₹2 L/yr - ₹3.5 L/yr |
Quality Engineer
7
salaries
| ₹2.4 L/yr - ₹4.2 L/yr |
Sales & Marketing Engineer
6
salaries
| ₹4.8 L/yr - ₹6.5 L/yr |
Jotun Paints
All Time Plastics
RC Plasto Tanks And Pipes
Daelim Industrial Co.