Filter interviews by
posted on 29 Jul 2024
I applied via Job Portal and was interviewed before Jul 2023. There were 2 interview rounds.
Reasoning, maths and coding
Top trending discussions
I applied via Campus Placement and was interviewed in Dec 2022. There were 2 interview rounds.
About any road ways and types of bridges and classification of is codes for building construction
About any road ways and classification of turnouts.
I applied via Walk-in and was interviewed in Sep 2022. There were 2 interview rounds.
Diaphragm walls are used to create a barrier while retaining walls are used to hold back soil.
Diaphragm walls are underground walls that are used to create a barrier to prevent water from entering a construction site.
Retaining walls are used to hold back soil and prevent it from sliding or eroding.
Diaphragm walls are typically made of reinforced concrete and are used in deep excavations.
Retaining walls can be made of v...
Plywood, steel, aluminum, and plastic are commonly used materials for shuttering.
Plywood is the most commonly used material for shuttering due to its durability and affordability.
Steel is used for heavy-duty construction projects as it can withstand high pressure and weight.
Aluminum is lightweight and easy to handle, making it ideal for small-scale projects.
Plastic is a cost-effective option for simple construction pro...
Calculate the bbs of a 4x3m footing with d=300mm and 12mm dia steel.
Calculate the total length of steel required
Determine the spacing between the bars
Prepare a detailed bar bending schedule
To calculate the quantity of concrete for trapezoidal footing, we need to use the formula for volume of a trapezoidal prism.
Measure the length, width, and height of the trapezoidal footing
Calculate the area of the trapezoidal base using the formula (a+b)/2 * h
Calculate the volume of the trapezoidal prism using the formula area of base * height
Multiply the volume by the number of trapezoidal footings needed
Add an additi
posted on 11 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.
Identifying the required personnel for a project
Recruiting and hiring personnel
Training and orienting personnel to the project
Assigning roles and responsibilities to personnel
Managing personnel performance and productivity
Ensuring compliance with labor laws and regulations
Examples include mobilizing a construc...
Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.
Create a detailed project budget and stick to it
Track expenses regularly and adjust budget as needed
Identify and eliminate unnecessary expenses
Negotiate with vendors for better pricing
Implement cost-saving measures without compromising quality
Use project management tools to monitor expenses and progress
Reg...
Handling clients requires effective communication, understanding their needs, and providing timely solutions.
Listen actively to their concerns and requirements
Communicate clearly and professionally
Provide timely updates and solutions
Build a strong relationship based on trust and respect
Be proactive in identifying and addressing potential issues
Ensure customer satisfaction by going above and beyond expectations
Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.
Identify the need for manpower
Plan the recruitment process
Source and screen candidates
Conduct interviews and assessments
Select and hire candidates
Provide training and orientation
Deploy manpower to required locations
posted on 14 Apr 2024
I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.
I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
posted on 11 Oct 2021
I applied via Company Website and was interviewed in Sep 2021. There was 1 interview round.
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Junior Engineer Civil
317
salaries
| ₹1.2 L/yr - ₹5 L/yr |
Junior Engineer
173
salaries
| ₹1.5 L/yr - ₹5.5 L/yr |
Assistant Engineer
106
salaries
| ₹3.5 L/yr - ₹8.5 L/yr |
Assistant Engineer - Civil
92
salaries
| ₹3 L/yr - ₹7.1 L/yr |
Senior Engineer
81
salaries
| ₹4.5 L/yr - ₹10 L/yr |
L&T Energy Hydrocarbon
AECOM
Sam Higginbottom Institute of Agriculture, Technology and Sciences
Apco Infratech