I applied via Naukri.com and was interviewed in Oct 2023. There were 2 interview rounds.
Top trending discussions
I applied via Naukri.com and was interviewed in Jan 2024. There were 2 interview rounds.
Plaster measurement deduction criteria refers to the standard guidelines used to calculate the deduction for plastering work in construction projects.
Deductions are made for openings such as doors, windows, and ducts in the plastered area.
The deduction criteria may vary based on the type of plastering material used and the specifications of the project.
Common deduction percentages range from 5% to 10% for openings in p...
The excess quantity executed beyond the BOQ quantity needs to be documented and approved by the client before billing.
Document the excess quantity separately from the original BOQ quantity
Seek approval from the client for the excess quantity before including it in the billing
Adjust the billing amount accordingly based on the approved excess quantity
Maintain clear communication with the client regarding the excess quant
posted on 14 Oct 2023
I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.
Process of variation involves documenting and analyzing changes in project scope, cost, or schedule.
Variations are changes to the original scope, cost, or schedule of a project
Variations must be documented and approved by the relevant parties
The impact of variations on project budget and timeline must be analyzed
Examples of variations include design changes, unforeseen site conditions, and client requests
posted on 11 Oct 2022
I applied via Naukri.com and was interviewed in Feb 2023. There were 2 interview rounds.
The code that follows for measurements as per CPWD specifications is CPWD-6.
CPWD-6 is the code used for measurements as per CPWD (Central Public Works Department) specifications.
It provides guidelines for measurement and billing of various construction activities.
CPWD-6 includes detailed instructions on how to measure and quantify different items of work in construction projects.
It helps in ensuring uniformity and stan...
Centering and shuttering can be measured after 3.5m slab level using various methods.
Use measuring tape to measure the distance between the slab level and the centering or shuttering
Check the alignment and levelness of the centering and shuttering using a spirit level
Inspect the quality of the materials used for centering and shuttering
Ensure proper bracing and support for the centering and shuttering
Consider any addit...
The unit of granite measurements is typically square feet or square meters.
The most common unit of measurement for granite is square feet.
In some countries, square meters may be used as the unit of measurement.
Granite slabs are often sold by the square foot or square meter.
When estimating or billing for granite, it is important to accurately measure the area to determine the quantity needed.
I applied via Recruitment Consulltant and was interviewed before Apr 2021. There was 1 interview round.
Rate analysis for plaster involves calculating the cost of materials, labor, and equipment required for plastering a specific area.
Determine the area to be plastered
Calculate the quantity of materials required (cement, sand, water)
Determine the cost of materials per unit
Calculate the cost of labor per unit area
Include the cost of equipment and tools used
Add all costs to get the total cost of plastering
Example: For plas...
BBS is Bar Bending Schedule used for steel reinforcement and BOQ is Bill of Quantities used for building items.
BBS provides details of reinforcement steel required for construction.
BOQ lists all the materials and quantities required for construction.
BBS is used for steel reinforcement in structures like columns, beams, slabs, etc.
BOQ is used for building items like bricks, cement, sand, etc.
Both BBS and BOQ are importa...
Assistant Manager
25
salaries
| ₹5.7 L/yr - ₹12.2 L/yr |
Electrical Design Engineer
16
salaries
| ₹3.2 L/yr - ₹5.3 L/yr |
Senior Engineer
14
salaries
| ₹4.5 L/yr - ₹10.5 L/yr |
Design Engineer
13
salaries
| ₹2.6 L/yr - ₹6.8 L/yr |
Installation & Commissioning Engineer
12
salaries
| ₹2.5 L/yr - ₹5.5 L/yr |
L&T Technology Services
TCS
Infosys
Wipro