Development length is the minimum length of reinforcement required to transfer stress from reinforcing bar to concrete.
It is the length of the bar that is embedded in concrete
It is required to ensure that the reinforcing bar develops its full strength
It depends on the diameter of the bar, the strength of the concrete, and the bond between the bar and the concrete
It is important to calculate the development length accur...
Soundness test of cement checks the ability of cement to retain its volume after setting.
Soundness test determines the presence of uncombined lime in cement.
It is done by mixing cement with water and gauging it with a standard consistency.
The mixture is then made into a pat and kept in water for 24 hours.
After 24 hours, the pat is removed and observed for any cracks or distortion.
If the pat remains sound, the cement is
Zones in beam & column refer to different regions with varying behavior and load distribution.
Zones in a beam include compression zone, tension zone, and neutral axis.
Compression zone experiences compressive stresses, while tension zone experiences tensile stresses.
Neutral axis is the region where there are no stresses.
In a column, zones include the core and the flange.
The core carries most of the axial load, while the
High strength concrete is a type of concrete with a compressive strength greater than 6,000 psi.
High strength concrete is typically used in high-rise buildings, bridges, and other structures that require high load-bearing capacity.
It is made by using a lower water-to-cement ratio, high-quality aggregates, and special admixtures.
The compressive strength of high strength concrete can range from 6,000 to 20,000 psi.
It is ...
Mivan formwork sequence involves setting up the wall panels, fixing the corner pieces, placing the slab panels, and then removing the wall panels.
Start by setting up the wall panels in the desired configuration
Fix the corner pieces to ensure proper alignment and stability
Place the slab panels on top of the wall panels
Remove the wall panels once the concrete has set
Repeat the process for the next level
I applied via Recruitment Consultant and was interviewed in Jan 2021. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Feb 2021. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed before Sep 2020. There were 3 interview rounds.
I applied via Referral and was interviewed before Jan 2021. There was 1 interview round.
I applied via Campus Placement and was interviewed before Feb 2021. There were 3 interview rounds.
Aptitude round consists Logical reasoning, General Aptitude, Grammar related questions etc. All are moderate level questions.
OOPs is a programming paradigm that uses objects to represent real-world entities. Java is an OOPs language.
OOPs stands for Object-Oriented Programming System
Java is a class-based OOPs language
Encapsulation, Inheritance, Polymorphism, and Abstraction are the four pillars of OOPs
Objects have state and behavior
Java supports interfaces, which allow for multiple inheritance
Example: A car can be represented as an object wit...
Java solves machine dependency by using bytecode and virtual machine.
Java code is compiled into bytecode which is platform-independent
The bytecode is executed by the Java Virtual Machine (JVM) which is platform-specific
JVM translates bytecode into machine code for the specific platform
This allows Java code to run on any platform with a JVM installed
Example: A Java program compiled on Windows can run on Linux or Mac as
based on 6 interviews
Interview experience
based on 88 reviews
Rating in categories
Assistant Manager
36
salaries
| ₹4.6 L/yr - ₹12.2 L/yr |
Electrical Design Engineer
15
salaries
| ₹3.2 L/yr - ₹5.3 L/yr |
Senior Engineer
14
salaries
| ₹4.5 L/yr - ₹10.5 L/yr |
Installation & Commissioning Engineer
12
salaries
| ₹2.5 L/yr - ₹5.5 L/yr |
Design Engineer
11
salaries
| ₹3.8 L/yr - ₹6.8 L/yr |
L&T Technology Services
TCS
Infosys
Wipro