ATS Group Senior Project Billing Engineer Interview Questions and Answers

Updated 27 Nov 2023

ATS Group Senior Project Billing Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Oct 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. About IS CODE-456 and mode of measurement
  • Q2. Reconcilation knowledge

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. About salary and benefits
Round 3 - One-on-one 

(4 Questions)

  • Q1. About my key activity and responsibility
  • Q2. Process of variation
  • Ans. 

    Process of variation involves documenting and analyzing changes in project scope, cost, or schedule.

    • Variations are changes to the original scope, cost, or schedule of a project

    • Variations must be documented and approved by the relevant parties

    • The impact of variations on project budget and timeline must be analyzed

    • Examples of variations include design changes, unforeseen site conditions, and client requests

  • Answered by AI
  • Q3. Details about TDS
  • Q4. Details about NS items

Interview Preparation Tips

Topics to prepare for The Louis Berger Group Billing Engineer interview:
  • Contact
  • Running bill
  • Escalations
  • Variation
  • Ns items

I applied via Walk-in and was interviewed in Jun 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Total experience Previous company salary
Round 3 - Technical 

(1 Question)

  • Q1. General technical questions

Interview Preparation Tips

Topics to prepare for Dee Vee Projects Billing Engineer interview:
  • Steel Structures
  • Finishing
  • AutoCAD
  • Bbs
  • MS Office
  • Ms excel
Interview preparation tips for other job seekers - General questions Reddy to go the enterview

I applied via Recruitment Consulltant and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Rate analysis for plaster
  • Ans. 

    Rate analysis for plaster involves calculating the cost of materials, labor, and equipment required for plastering a specific area.

    • Determine the area to be plastered

    • Calculate the quantity of materials required (cement, sand, water)

    • Determine the cost of materials per unit

    • Calculate the cost of labor per unit area

    • Include the cost of equipment and tools used

    • Add all costs to get the total cost of plastering

    • Example: For plas...

  • Answered by AI
  • Q2. BBS for steel and BOQ for building items
  • Ans. 

    BBS is Bar Bending Schedule used for steel reinforcement and BOQ is Bill of Quantities used for building items.

    • BBS provides details of reinforcement steel required for construction.

    • BOQ lists all the materials and quantities required for construction.

    • BBS is used for steel reinforcement in structures like columns, beams, slabs, etc.

    • BOQ is used for building items like bricks, cement, sand, etc.

    • Both BBS and BOQ are importa...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Study IS 1200 all parts, material reconciliation

ATS Group Interview FAQs

How many rounds are there in ATS Group Senior Project Billing Engineer interview?
ATS Group interview process usually has 2 rounds. The most common rounds in the ATS Group interview process are Resume Shortlist and Technical.
What are the top questions asked in ATS Group Senior Project Billing Engineer interview?

Some of the top questions asked at the ATS Group Senior Project Billing Engineer interview -

  1. About IS CODE-456 and mode of measurem...read more
  2. Reconcilation knowle...read more

Tell us how to improve this page.

ATS Group Senior Project Billing Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

TCS Interview Questions
3.7
 • 10.5k Interviews
Infosys Interview Questions
3.6
 • 7.6k Interviews
Wipro Interview Questions
3.7
 • 5.7k Interviews
Tech Mahindra Interview Questions
3.5
 • 3.9k Interviews
HCLTech Interview Questions
3.5
 • 3.8k Interviews
LTIMindtree Interview Questions
3.8
 • 3k Interviews
Mphasis Interview Questions
3.4
 • 810 Interviews
View all
Assistant Manager
36 salaries
unlock blur

₹4.6 L/yr - ₹12.2 L/yr

Electrical Design Engineer
15 salaries
unlock blur

₹3.2 L/yr - ₹5.3 L/yr

Senior Engineer
14 salaries
unlock blur

₹4.5 L/yr - ₹10.5 L/yr

Design Engineer
13 salaries
unlock blur

₹2.6 L/yr - ₹6.8 L/yr

Installation & Commissioning Engineer
12 salaries
unlock blur

₹2.5 L/yr - ₹5.5 L/yr

Explore more salaries
Compare ATS Group with

L&T Technology Services

3.3
Compare

TCS

3.7
Compare

Infosys

3.6
Compare

Wipro

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview