I applied via Walk-in and was interviewed before Nov 2021. There were 2 interview rounds.
Development length is the minimum length of reinforcement required to transfer stress from reinforcing bar to concrete.
It is the length of the bar that is embedded in concrete
It is required to ensure that the reinforcing bar develops its full strength
It depends on the diameter of the bar, the strength of the concrete, and the bond between the bar and the concrete
It is important to calculate the development length accur...
Soundness test of cement checks the ability of cement to retain its volume after setting.
Soundness test determines the presence of uncombined lime in cement.
It is done by mixing cement with water and gauging it with a standard consistency.
The mixture is then made into a pat and kept in water for 24 hours.
After 24 hours, the pat is removed and observed for any cracks or distortion.
If the pat remains sound, the cement is
Zones in beam & column refer to different regions with varying behavior and load distribution.
Zones in a beam include compression zone, tension zone, and neutral axis.
Compression zone experiences compressive stresses, while tension zone experiences tensile stresses.
Neutral axis is the region where there are no stresses.
In a column, zones include the core and the flange.
The core carries most of the axial load, while the
High strength concrete is a type of concrete with a compressive strength greater than 6,000 psi.
High strength concrete is typically used in high-rise buildings, bridges, and other structures that require high load-bearing capacity.
It is made by using a lower water-to-cement ratio, high-quality aggregates, and special admixtures.
The compressive strength of high strength concrete can range from 6,000 to 20,000 psi.
It is ...
Mivan formwork sequence involves setting up the wall panels, fixing the corner pieces, placing the slab panels, and then removing the wall panels.
Start by setting up the wall panels in the desired configuration
Fix the corner pieces to ensure proper alignment and stability
Place the slab panels on top of the wall panels
Remove the wall panels once the concrete has set
Repeat the process for the next level
I applied via Walk-in and was interviewed in Jul 2023. There were 2 interview rounds.
Execution of MS line, DI line, HDPE line involves proper planning, material selection, installation, and testing.
Plan the layout and route of the lines based on project requirements and specifications.
Select appropriate materials such as MS, DI, or HDPE based on factors like pressure rating, corrosion resistance, and cost.
Ensure proper installation of the lines including welding, jointing, and fittings.
Conduct pressure...
I appeared for an interview in Aug 2024.
I am currently working at XYZ Engineering Firm as a Senior Civil Engineer.
XYZ Engineering Firm
Senior Civil Engineer position
Responsibilities include project management and design work
Collaborating with team members and clients
Current CTC is confidential and can be discussed during negotiation.
Current CTC is subject to company policies and confidentiality agreements.
It is common practice to discuss salary expectations during the interview process.
Candidates should be prepared to provide their current CTC if requested by the employer.
Plastering thickness and specifications refer to the recommended thickness and quality standards for applying plaster on walls or ceilings.
Plastering thickness is typically around 12-15mm for internal walls and 15-20mm for external walls.
Specifications include using the right mix of plaster, ensuring a smooth finish, and allowing for proper curing time.
Plastering should be done in multiple layers to achieve the desired...
Currently working on building footings and column sizes at various construction sites.
Designing footings based on soil conditions and structural requirements
Calculating column sizes based on load-bearing capacity and architectural design
Coordinating with structural engineers and architects to ensure proper sizing and placement
Inspecting construction sites to verify footing and column dimensions
Utilizing software such a
I applied via Walk-in and was interviewed in May 2023. There were 3 interview rounds.
Question & Discussion about previous project, working methods,hindreces, management and other policies of previous companies.
The last company package was competitive and included various benefits.
Competitive salary
Health insurance
Retirement plan
Paid time off
Performance bonuses
posted on 13 Dec 2022
I applied via Walk-in and was interviewed in Jun 2022. There were 2 interview rounds.
The basic concept for construction of a substation involves site selection, design, equipment installation, and commissioning.
Site selection involves identifying a suitable location for the substation based on factors such as proximity to power sources and load centers.
Design involves creating a plan for the substation layout, including the placement of equipment such as transformers, switchgear, and control systems.
Eq...
Single Line Diagram of Substation is a graphical representation of electrical distribution system in a substation.
It shows the electrical components and their connections in a simplified manner
It helps in understanding the flow of power and voltage levels in the system
It is used for planning, designing, and maintenance of the substation
It includes information about transformers, circuit breakers, busbars, and other equ...
posted on 11 May 2018
I applied via Naukri.com and was interviewed before May 2017. There was 1 interview round.
The density of soil in the embankment layer varies depending on the type of soil and compaction methods used.
The density of soil in the embankment layer is typically measured in terms of dry density or wet density.
Dry density refers to the mass of solid soil particles per unit volume of soil, while wet density includes the mass of water as well.
The density of soil in the embankment layer is influenced by factors such a...
posted on 17 Jul 2017
I appeared for an interview before Jul 2016.
I applied via Approached by Company and was interviewed in Apr 2022. There was 1 interview round.
I applied via LinkedIn and was interviewed in Feb 2022. There were 2 interview rounds.
I am a civil engineer with experience in designing and managing construction projects.
I have a Bachelor's degree in Civil Engineering from XYZ University.
I have worked on various projects including designing bridges, roads, and buildings.
I am skilled in using software such as AutoCAD and Revit for designing.
I have experience in managing construction projects and ensuring they are completed on time and within budget.
I a...
posted on 25 Mar 2023
I applied via Newspaper Ad and was interviewed in Feb 2023. There were 3 interview rounds.
Assistant Manager
36
salaries
| ₹4.6 L/yr - ₹12.2 L/yr |
Electrical Design Engineer
15
salaries
| ₹3.2 L/yr - ₹5.3 L/yr |
Senior Engineer
14
salaries
| ₹4.5 L/yr - ₹10.5 L/yr |
Installation & Commissioning Engineer
12
salaries
| ₹2.5 L/yr - ₹5.5 L/yr |
Design Engineer
11
salaries
| ₹2.6 L/yr - ₹6.8 L/yr |
Lea Associates South Asia
R.V.R. PROJECTS
ABCI Infrastructures
VIKRAN Engineering & Exim