Upload Button Icon Add office photos

Filter interviews by

Ashish Interbuild Interview Questions and Answers

Updated 2 Aug 2023

Ashish Interbuild Interview Experiences

Popular Designations

4 interviews found

I applied via Recruitment Consulltant and was interviewed in Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(4 Questions)

  • Q1. What are your salary expectations?
  • Ans. 

    I am open to discussing a fair and competitive salary based on my qualifications and the responsibilities of the position.

    • I am flexible and willing to negotiate based on the specific details of the job

    • I have researched industry standards and salary ranges for this position

    • I am looking for a salary that reflects my experience and skills

    • I am also interested in discussing benefits and opportunities for growth within the c

  • Answered by AI
  • Q2. What is your family background?
  • Ans. 

    My family background is diverse and has taught me to appreciate different cultures and perspectives.

    • My parents are from different countries, which has exposed me to different languages and traditions.

    • I have siblings who have pursued different career paths, which has taught me the value of individuality.

    • My family has faced challenges, such as financial struggles and health issues, which has taught me resilience and empa...

  • Answered by AI
  • Q3. Share details of your previous job.
  • Ans. 

    I worked as a Safety Officer at XYZ company.

    • Conducted regular safety inspections and audits to identify potential hazards and risks.

    • Developed and implemented safety policies and procedures to ensure compliance with regulations.

    • Provided safety training to employees and conducted drills to prepare for emergencies.

    • Investigated accidents and incidents to determine root causes and implemented corrective actions.

    • Maintained s...

  • Answered by AI
  • Q4. Tell me about yourself.
  • Ans. 

    I am a safety officer with experience in implementing safety protocols and ensuring compliance with regulations.

    • I have a degree in Occupational Health and Safety and have completed various safety training programs.

    • I have experience conducting safety audits and inspections to identify potential hazards and risks.

    • I have implemented safety protocols and procedures to ensure compliance with regulations and reduce the risk ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Compliance Documentation , induction Training, general work permit, TBT training, Height Work, General computer knowledge ,Hot work, Demo fire fiting, PPE Training. Etc.

Safety Officer Interview Questions asked at other Companies

Q1. If you don't have any safety equipment and documents how to complete the work ?
View answer (17)

QS Engineer Interview Questions & Answers

user image Anonymous

posted on 2 Aug 2023

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Where did you work before ?
  • Q2. Can you do multi tasking ?
  • Ans. 

    Yes, I am able to multitask effectively by prioritizing tasks, staying organized, and managing my time efficiently.

    • I prioritize tasks based on deadlines and importance

    • I stay organized by using tools like to-do lists and calendars

    • I manage my time effectively by setting realistic goals and deadlines

    • Example: I have successfully managed multiple projects simultaneously by dividing my time and attention appropriately

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Are the details correct?
  • Q2. You would be on fixed term contract basis for one year, is it okey for you ?

Interview Preparation Tips

Topics to prepare for Ashish Interbuild QS Engineer interview:
  • It was good and pleasant that ti

QS Engineer Interview Questions asked at other Companies

Q1. Basic specifications of Plastering, How much Deductions are to be made for plastering (internal and External), what is Bar Bending Schedule what will be the cutting length for stirrups of Beam size 230x450 what are the Basic Documentation f... read more
View answer (1)

I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Nothing 

(1 Question)

  • Q1. Asking about your background

Interview Preparation Tips

Interview preparation tips for other job seekers - Please avoid Ashish Interbuild. It's not good for hardworking man.

Interior Project Manager Interview Questions asked at other Companies

Q1. What is technical qualification
View answer (1)

I applied via Walk-in and was interviewed before Aug 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. About civil

Interview Preparation Tips

Interview preparation tips for other job seekers - I am civil engineer and experience is 4 years...

Diploma Civil Engineer Interview Questions asked at other Companies

Q1. What is width of pavement in two lines road with out kerb?
View answer (1)

Ashish Interbuild interview questions for popular designations

 Diploma Civil Engineer

 (1)

 Interior Project Manager

 (1)

 QS Engineer

 (1)

 Safety Officer

 (1)

Jobs at Ashish Interbuild

View all

Interview questions from similar companies

I applied via Company Website and was interviewed in Apr 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Your contributions & learnings in each of the work you did ?
  • Q2. How did you handle any difficult situation or challenging assognment ir work in past ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Honest in your answers & Continue to look long term career in such a nice organization.

Interview Questionnaire 

11 Questions

  • Q1. Introduce Yourselves.
  • Q2. What projects are you working on?
  • Q3. Questions related to past projects - Which projects did you work on? What were you responsibilities? How many Engineers & CAD technicians did you manage?
  • Q4. Explain the organization chart at your current work place?
  • Q5. Are you a Professional/Chartered Engineer? Current Status?
  • Q6. Geometric Departures, Design Considerations, Client Requirements, Mitigation of superelevation spillover at reverse curves (if horizontal alignment is fixed), etc.
  • Q7. BIM Application in Highway Models?
  • Ans. 

    BIM application in highway models involves creating a digital representation of the road and its infrastructure.

    • BIM can be used to design and visualize highway projects

    • It allows for collaboration between different stakeholders

    • BIM can help with clash detection and reduce errors in construction

    • It can also be used for maintenance and asset management

    • Examples include the use of BIM in the construction of the M25 motorway i

  • Answered by AI
  • Q8. How do you review/check work of an originator in Civil3D Models?
  • Ans. 

    I review/check work of an originator in Civil3D Models by following a systematic approach.

    • I check for errors and inconsistencies in the model.

    • I verify that the model adheres to the project standards and specifications.

    • I ensure that the model is accurate and complete.

    • I communicate with the originator to clarify any issues or concerns.

    • I document any changes or revisions made to the model.

    • I perform a final review before s

  • Answered by AI
  • Q9. Roundabout Parameters and values for urban and rural roundabouts
  • Ans. 

    Roundabout parameters and values vary based on urban and rural settings.

    • Urban roundabouts typically have smaller diameters and tighter curves than rural roundabouts.

    • Rural roundabouts may have larger diameters and wider curves to accommodate larger vehicles.

    • Speed limits, traffic volume, and pedestrian and cyclist activity also influence roundabout design.

    • Roundabout parameters may include lane widths, splitter island wid...

  • Answered by AI
  • Q10. What input is required in ARCADY and PICADY software?
  • Ans. 

    ARCADY and PICADY software require input such as road geometry, traffic flow, and vehicle characteristics.

    • Road geometry data such as lane widths, radii, and gradients

    • Traffic flow data such as traffic volume, speed, and composition

    • Vehicle characteristics such as dimensions, speed, and acceleration

    • Other inputs such as signal timings and pedestrian crossings

  • Answered by AI
  • Q11. What are your capabilities in Civil3D?
  • Ans. 

    I am proficient in Civil3D and have extensive experience in using it for designing and drafting civil engineering projects.

    • Expertise in creating and editing surfaces, alignments, profiles, and corridors

    • Ability to generate 3D models and perform earthwork calculations

    • Experience in creating plan and profile sheets, cross-sections, and quantity takeoffs

    • Familiarity with Civil3D add-ons such as AutoTURN and Hydraflow

    • Proficie...

  • Answered by AI

ABCI infrastructure Pvt ltd Interview Questions & Answers

ABCI Infrastructures user image Anonymous

posted on 24 Jul 2021

Interview Questionnaire 

4 Questions

  • Q1. Salary increment purpose
  • Q2. I join ABCI infrastructure Pvt ltd Charanbanda project NH94 2year continued salary increment
  • Q3. Structural engineer culvert Bridge construction Building construction structure interested
  • Q4. I am joining your team working management system site purpose

Interview Questionnaire 

5 Questions

  • Q1. Draw a simple line chart for 10 km action plan with in 10 min ( including all safety precautions , procurement , manpower , equipment's , all )
  • Ans. 

    A line chart for a 10 km action plan with safety precautions, procurement, manpower, and equipment.

    • Identify safety precautions needed for the project

    • Procure necessary equipment and manpower

    • Create a timeline for the project

    • Allocate resources efficiently

    • Ensure compliance with regulations and standards

    • Monitor progress and adjust plan as needed

  • Answered by AI
  • Q2. Calculate pup-piece length for - two section are already lowered and overlap 5m and s- bend rolling ,two 90 degree LR bends for 12 inch pipeline ?
  • Ans. 

    To calculate pup-piece length for a 12 inch pipeline with two sections already lowered and overlap 5m and s-bend rolling, two 90 degree LR bends.

    • Calculate the total length of the pipeline

    • Subtract the length of the two sections already lowered and overlap 5m

    • Add the length of the two 90 degree LR bends

    • Divide the result by 2 to get the length of each pup-piece

  • Answered by AI
  • Q3. How you calculate collapse and damage percentage for HDD crossings ?
  • Ans. 

    Collapse and damage percentage for HDD crossings are calculated based on various factors such as soil type, borehole diameter, and drilling fluid properties.

    • Collapse percentage is calculated using the Mohr-Coulomb failure criterion

    • Damage percentage is calculated based on the tensile strength of the pipe and the bending stress induced during the pullback process

    • Factors such as soil type, borehole diameter, and drilling ...

  • Answered by AI
  • Q4. What is methodology for rock excavation and how to measure the quantity?
  • Ans. 

    Methodology for rock excavation involves drilling, blasting, and removal of debris. Quantity is measured by volume or weight.

    • Drilling holes in rock using specialized equipment

    • Placing explosives in the holes and detonating them

    • Removing the debris using heavy machinery

    • Measuring the quantity of rock excavated by volume or weight

    • Using software to calculate the amount of explosives needed for a specific excavation project

  • Answered by AI
  • Q5. In Radiography Interpretation at 30 segment position seems like a crake , but you dint find in UT test how you solve this situation?

Interview Preparation Tips

Interview preparation tips for other job seekers - Pipeline field is full of stress and based on will power management at site fields activities , apart from technical questions have to test his stress handling ,planning and site management .And also confirm that candidate is suitable for pipeline based on his will power and how passionate in pipeline field he can fulfill his responsibilities of any critical situations and targets.

Interview Questionnaire 

7 Questions

  • Q1. Tell about youself
  • Q2. Overall experience of commissioning activities in Oil&Gas field
  • Ans. 

    I have extensive experience in commissioning activities in the Oil&Gas field.

    • I have worked on multiple commissioning projects in the Oil&Gas industry.

    • I have a deep understanding of the commissioning process and its importance in ensuring safe and efficient operations.

    • I have successfully led commissioning teams and coordinated activities to ensure timely completion.

    • I have experience in troubleshooting and resolving comm...

  • Answered by AI
  • Q3. How completion system works for a project.
  • Ans. 

    Completion system is a process that ensures all components of a project are fully functional and ready for operation.

    • Completion system involves testing and verifying all equipment, systems, and processes.

    • It includes conducting inspections, functional tests, and performance tests.

    • Documentation and certification of completion are important aspects of the process.

    • Examples of completion systems include commissioning a powe...

  • Answered by AI
  • Q4. How system is handed over to client
  • Ans. 

    The system is handed over to the client through a structured process of testing, documentation, and training.

    • The system is thoroughly tested to ensure it meets all requirements and specifications

    • Documentation is provided to the client, including user manuals and technical specifications

    • Training is provided to the client's staff to ensure they can effectively use and maintain the system

    • A formal acceptance process is con...

  • Answered by AI
  • Q5. Once completion dossiers are ready, offer is made for verification. Post completion of documents verification dossier submitted to client
  • Q6. Why do you want to leave current job? Why do you want to join us?
  • Q7. I have the relevant knowledge and experience as per requirement. I feel this post could provide me multiple opportunities to enhance my skills and expertise. It will strengthen furhter my leadership skils ...

Interview Preparation Tips

Interview preparation tips for other job seekers - Most essential things we have to pull the interviewer in our area of expertise. Once they feel our knowledge and interpretation skills it validates the recruitment. We must have the confidence to express ourselves. Need to be honest if know something then only answer. Otherwise ,simply say "pardon me Sir I don't know ". Show your enthusiasm elegently without hestitation.

Skills evaluated in this interview

I applied via Walk-in and was interviewed in Jan 2021. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Layout plan of switching station and how many interruptor use in ssp?
  • Ans. 

    The layout plan of a switching station includes the arrangement of equipment and the number of interrupters used.

    • The layout plan of a switching station is designed to ensure efficient and safe operation.

    • It includes the arrangement of various equipment such as transformers, circuit breakers, and disconnect switches.

    • The number of interrupters used in a switching station depends on the size and capacity of the station.

    • Int...

  • Answered by AI
  • Q2. What's the function of Neutral section and section insulator in OHE
  • Ans. 

    The neutral section and section insulator in OHE have important functions in electrical systems.

    • The neutral section is used to provide a return path for the current in the electrical system.

    • It helps maintain the balance of electrical potential between the overhead wires and the ground.

    • The section insulator is used to electrically isolate different sections of the overhead wires.

    • It prevents the flow of current between a...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Learn railway standards policy and guidance from seniors and briefs about the execution work, list out materials and utilisations.

Ashish Interbuild Interview FAQs

How many rounds are there in Ashish Interbuild interview?
Ashish Interbuild interview process usually has 2-3 rounds. The most common rounds in the Ashish Interbuild interview process are Resume Shortlist, HR and Technical.
How to prepare for Ashish Interbuild interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Ashish Interbuild. The most common topics and skills that interviewers at Ashish Interbuild expect are Rate Analysis, Negotiation, AutoCAD, Billing Engineering and Customer Handling.
What are the top questions asked in Ashish Interbuild interview?

Some of the top questions asked at the Ashish Interbuild interview -

  1. Can you do multi taskin...read more
  2. Are the details corre...read more
  3. About ci...read more

Tell us how to improve this page.

Ashish Interbuild Interview Process

based on 5 interviews

Interview experience

4.6
  
Excellent
View more

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 128 Interviews
DLF Interview Questions
3.9
 • 75 Interviews
Prestige Group Interview Questions
4.3
 • 36 Interviews
Brigade Group Interview Questions
4.1
 • 32 Interviews
Oberoi Realty Interview Questions
4.1
 • 17 Interviews
View all

Ashish Interbuild Reviews and Ratings

based on 53 reviews

4.2/5

Rating in categories

3.6

Skill development

3.4

Work-life balance

3.2

Salary

3.1

Job security

3.3

Company culture

2.8

Promotions

3.3

Work satisfaction

Explore 53 Reviews and Ratings
Assistant Project Manager

Mumbai

2-5 Yrs

₹ 0.5-3 LPA

HR Recruiter

Mumbai

1-4 Yrs

₹ 0.5-2.25 LPA

Explore more jobs
Site Engineer
9 salaries
unlock blur

₹2.1 L/yr - ₹4 L/yr

Assistant Project Manager
5 salaries
unlock blur

₹5.9 L/yr - ₹7 L/yr

Estimation Manager
5 salaries
unlock blur

₹14.1 L/yr - ₹17.5 L/yr

Senior Project Manager
5 salaries
unlock blur

₹11.1 L/yr - ₹12 L/yr

Store Incharge
5 salaries
unlock blur

₹3 L/yr - ₹4.2 L/yr

Explore more salaries
Compare Ashish Interbuild with

Godrej Properties

3.7
Compare

DLF

3.9
Compare

Sobha

3.9
Compare

Prestige Group

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview