I applied via Walk-in and was interviewed in Jan 2021. There were 4 interview rounds.
The layout plan of a switching station includes the arrangement of equipment and the number of interrupters used.
The layout plan of a switching station is designed to ensure efficient and safe operation.
It includes the arrangement of various equipment such as transformers, circuit breakers, and disconnect switches.
The number of interrupters used in a switching station depends on the size and capacity of the station.
Int...
The neutral section and section insulator in OHE have important functions in electrical systems.
The neutral section is used to provide a return path for the current in the electrical system.
It helps maintain the balance of electrical potential between the overhead wires and the ground.
The section insulator is used to electrically isolate different sections of the overhead wires.
It prevents the flow of current between a...
Top trending discussions
posted on 12 Oct 2024
I applied via campus placement at PSG College of Technology, Coimbatore and was interviewed in Sep 2024. There were 3 interview rounds.
General knowlegde, Basic Aptitude, Domain Technical MCQ
Genx vs Genz, Altitude and comparsion
Components of a transformer include core, windings, and insulation.
Core: Provides a path for magnetic flux
Windings: Primary and secondary coils for inducing voltage
Insulation: Prevents short circuits and ensures safety
MCB is a miniature circuit breaker used for low voltage applications, while MCCB is a molded case circuit breaker used for higher currents and voltages.
MCB is designed for low voltage applications, typically up to 1000V, while MCCB is designed for higher currents and voltages, typically up to 2500V.
MCB is usually thermal-magnetic in operation, while MCCB can be thermal-magnetic or electronic trip units.
MCB is compact i...
Different types of breakers include circuit breakers, fuse breakers, and ground fault circuit interrupters.
Circuit breakers: Automatically switch off electrical circuits during abnormal conditions.
Fuse breakers: Use a fuse to interrupt the circuit when overloaded.
Ground fault circuit interrupters (GFCI): Detect imbalances in current flow to prevent electrical shocks.
Miniature circuit breakers (MCB): Provide protection ...
I applied via Recruitment Consulltant and was interviewed before Jan 2024. There was 1 interview round.
Online interview and shared my experience.
posted on 11 Oct 2024
I applied via Company Website and was interviewed in Apr 2024. There was 1 interview round.
I applied via Company Website and was interviewed in Apr 2023. There were 2 interview rounds.
Ohm's law states that the current through a conductor between two points is directly proportional to the voltage across the two points.
Ohm's law is represented by the equation I = V/R, where I is the current, V is the voltage, and R is the resistance.
It is named after Georg Simon Ohm, a German physicist who first formulated this law.
This law is applicable to all types of circuits, including DC and AC circuits.
It is use...
I applied via Walk-in and was interviewed in Mar 2023. There were 4 interview rounds.
The Loto system stands for Lockout/Tagout, a safety procedure used to ensure that dangerous machines are properly shut off and not started up again during maintenance or servicing.
Loto system involves locking the energy-isolating devices with individual lockout devices to prevent the machine from being turned on
Tagout involves placing a tag on the locked device to indicate that it should not be operated
Employees workin...
posted on 16 Dec 2023
posted on 25 Oct 2023
I applied via Recruitment Consulltant and was interviewed in Sep 2022. There were 4 interview rounds.
The process for a project involves planning, design, implementation, testing, and commissioning.
Define project scope and objectives
Create a project plan with timelines and milestones
Design the system or product
Procure necessary materials and equipment
Implement the design and build the system or product
Test the system or product to ensure it meets requirements
Commission the system or product for use
Provide ongoing suppo...
based on 2 reviews
Rating in categories
Project Engineer
256
salaries
| ₹5.5 L/yr - ₹22 L/yr |
Senior Engineer
204
salaries
| ₹7.5 L/yr - ₹28 L/yr |
L2 Engineer
147
salaries
| ₹3.4 L/yr - ₹10 L/yr |
Architect
132
salaries
| ₹4.1 L/yr - ₹14.9 L/yr |
Engineer
127
salaries
| ₹3.2 L/yr - ₹14.5 L/yr |
Jacobs Engineering Group
Fluor Corporation
Bechtel
Worley