I applied via Naukri.com and was interviewed in Apr 2024. There were 2 interview rounds.
Top trending discussions
I applied via Recruitment Consulltant and was interviewed in Mar 2023. There were 2 interview rounds.
I am currently working at a construction site in downtown city.
Construction site in downtown city
Working on a high-rise building project
Coordinating with architects, contractors, and workers
Ensuring adherence to safety regulations and project timelines
I applied via Company Website and was interviewed in Aug 2024. There were 3 interview rounds.
Plaster wall thickness 6mm slab bottom
12mm plaster smooth surface
Cube test after 7 day nd 14 day
Slump cone test true
posted on 18 Mar 2024
posted on 10 Apr 2023
I applied via Approached by Company and was interviewed in Mar 2023. There were 2 interview rounds.
The development length for M25 concrete and Fe 500 steel is determined based on various factors.
Development length is the length of reinforcement required to transfer the stress between the concrete and steel.
It depends on the bond strength between concrete and steel, concrete cover, and the diameter of the steel bar.
For M25 concrete and Fe 500 steel, the development length can be calculated using empirical formulas or...
The minimum thickness of slab depends on various factors such as load, span, and type of slab.
The minimum thickness of slab is generally 4 inches for residential buildings.
For commercial buildings, the minimum thickness of slab is 6 inches.
The thickness of slab also depends on the type of slab such as one-way or two-way slab.
The thickness of slab also depends on the span of the slab and the load it will bear.
The minimu...
The slab shuttering removal time depends on various factors such as concrete strength, weather conditions, and type of formwork used.
The removal time can range from 3 days to 21 days depending on the above factors.
For normal concrete with temperature above 20°C, the removal time is usually 7 days.
For concrete with high early strength, the removal time can be reduced to 3 days.
In cold weather conditions, the removal tim...
Mortars used for tiles bed are cement-based and are used to fix tiles to the substrate.
Cement-based mortars are commonly used for tiles bed
They are used to fix tiles to the substrate
The mortar should be mixed with water to form a paste
The paste is then applied to the substrate using a notched trowel
Tiles are then placed onto the mortar and pressed firmly into place
The mortar should be allowed to dry and set before grou
I applied via Walk-in and was interviewed in Sep 2021. There was 1 interview round.
based on 5 reviews
Rating in categories
Assistant Manager
29
salaries
| ₹3 L/yr - ₹7.1 L/yr |
Executive Accountant
29
salaries
| ₹1.2 L/yr - ₹3.4 L/yr |
Civil Site Engineer
28
salaries
| ₹1.2 L/yr - ₹5 L/yr |
Site Engineer
22
salaries
| ₹2.4 L/yr - ₹4.5 L/yr |
Safety Supervisor
22
salaries
| ₹1.4 L/yr - ₹3 L/yr |
Prestige Group
Sobha
Brigade Group
Godrej Properties