I was interviewed in Oct 2023.
Load calculation is the process of determining the electrical load requirements for a project.
Identify the electrical devices and equipment that will be used in the project
Determine the power requirements (in watts) for each device
Calculate the total power demand by summing up the power requirements of all devices
Consider factors like diversity factor and demand factor to account for variations in usage
Ensure that the ...
The number of amps required for 1kVA depends on the voltage.
The formula to calculate amps is: Amps = kVA / Voltage
For example, if the voltage is 120V, then the amps required for 1kVA would be 8.33A
If the voltage is 240V, then the amps required for 1kVA would be 4.17A
I was interviewed before Jan 2024.
Regarding the innovative solutions and problem solving.
QA focuses on preventing defects, while QC focuses on identifying and fixing defects in construction projects.
QA involves processes and procedures to ensure that the project meets quality standards throughout the entire construction process.
QC involves activities such as inspections, testing, and checks to identify defects and ensure that the project meets quality standards at specific checkpoints.
QA is proactive and p...
Common defects in concrete include cracks, honeycombing, segregation, and bleeding.
Cracks: caused by shrinkage, settlement, or overloading. Can be identified visually or by sounding with a hammer.
Honeycombing: voids in concrete due to poor compaction. Visible on the surface or by breaking a sample.
Segregation: separation of coarse aggregates from the concrete mix. Can be seen during pouring or by examining a cross-sect...
Performing a site inspection involves thorough examination of construction materials, workmanship, and adherence to specifications.
Reviewing construction plans and specifications to understand requirements
Inspecting materials for quality and compliance with standards
Checking workmanship for accuracy and adherence to specifications
Conducting tests and measurements to ensure structural integrity
Documenting findings and c...
Field density test is used to determine the density of soil or asphalt in the field to ensure proper compaction.
Role: Ensures proper compaction of soil or asphalt to meet project specifications
Carried out using a nuclear gauge or sand cone method
Measurements taken at different depths and locations to assess uniformity
Results used to adjust compaction efforts and ensure structural integrity
Example: In road construction,...
IS codes or other relevant standards play a crucial role in ensuring quality and safety in civil engineering projects.
IS codes provide guidelines for materials, construction practices, and quality control measures in civil engineering projects.
Following IS codes helps in ensuring that the structures are built to withstand various loads and environmental conditions.
Adherence to relevant standards helps in achieving unif...
Tests on reinforcement steel bars include visual inspection, dimensional checks, chemical composition analysis, and mechanical testing.
Visual inspection for any visible defects or damages
Dimensional checks to ensure the bars meet specified size and shape requirements
Chemical composition analysis to verify the material composition meets standards
Mechanical testing such as tensile strength, yield strength, and elongation...
Soil compaction testing on site involves using various methods to determine the density and moisture content of the soil.
Use a nuclear density gauge to measure the density of the soil by emitting low-level radiation and detecting the amount of radiation that is scattered back.
Perform a sand cone test by excavating a hole in the soil, filling it with sand of known density, and then measuring the volume of the hole befor...
Documentation for quality control includes test plans, inspection reports, non-conformance reports, and quality assurance records.
Test plans outlining testing procedures and criteria
Inspection reports documenting results of inspections
Non-conformance reports detailing any deviations from quality standards
Quality assurance records for tracking quality control activities
An Inspection and Test Plan (ITP) is a document that outlines the procedures and requirements for inspecting and testing materials, products, or services.
ITPs are typically created before the start of a project to ensure that all necessary inspections and tests are planned and carried out.
ITPs include details such as the scope of work, acceptance criteria, responsibilities of personnel, and the frequency of inspections...
By conducting regular inspections, providing clear guidelines, and offering training and support.
Regularly conduct on-site inspections to ensure compliance
Provide clear quality standards and guidelines for contractors to follow
Offer training and support to help contractors meet quality standards
Common issues with materials on-site include quality control, supply chain delays, and incorrect specifications.
Quality control issues such as defects in materials or incorrect measurements
Supply chain delays leading to shortages or late deliveries
Incorrect specifications causing compatibility or performance problems
I use a systematic approach to manage project documentation and ensure completion of all tests and inspections.
Create a detailed project plan outlining all necessary tests and inspections
Assign responsibilities to team members for each test and inspection
Regularly review and update project documentation to track progress
Utilize project management tools to organize and track tests and inspections
Conduct regular meetings...
I would escalate the issue to higher management and document all communication for record keeping.
Communicate the issue to the contractor and explain the reasons for rejection of the materials.
Consult with the project manager or higher management for guidance on how to proceed.
Document all communication with the contractor regarding the substandard materials for record keeping.
If necessary, involve legal department or ...
Address quality concerns by communicating with suppliers, adjusting timelines, and implementing contingency plans.
Communicate with suppliers to understand reasons for delay
Adjust project timelines accordingly
Implement contingency plans such as sourcing materials from alternative suppliers or using substitute materials
Ensure quality standards are maintained despite delays
I applied via Walk-in and was interviewed in Nov 2022. There were 2 interview rounds.
Bren Corporation interview questions for popular designations
I applied via Referral and was interviewed before Feb 2023. There were 2 interview rounds.
I applied via LinkedIn and was interviewed before Jan 2022. There were 5 interview rounds.
Case study and demonstration of skills through a campaign creation and strategizing one
I applied via Walk-in and was interviewed in Sep 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed before Dec 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Jun 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Nov 2021. There were 2 interview rounds.
Top trending discussions
Some of the top questions asked at the Bren Corporation interview -
based on 11 interviews
Interview experience
based on 84 reviews
Rating in categories
Project Engineer
14
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
12
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
10
salaries
| ₹0 L/yr - ₹0 L/yr |
Quantity Surveyor
9
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Manager
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Prestige Group
Sobha
Brigade Group
Puravankara