I applied via campus placement at Indian Institute of Technology (IIT), Hyderabad and was interviewed in Dec 2021. There were 2 interview rounds.
Test included aptitude and technical subject questions
I applied via campus placement at Institute for Technology and Management (ITM) and was interviewed in Jan 2022. There were 3 interview rounds.
I am a Junior Engineer Civil with a strong passion for construction and infrastructure development.
Graduated with a Bachelor's degree in Civil Engineering
Completed internships at construction companies, gaining hands-on experience
Proficient in AutoCAD and other design software
Strong problem-solving and analytical skills
Excellent communication and teamwork abilities
I applied via campus placement at Institute for Technology and Management (ITM) and was interviewed in Jan 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Nov 2021. There were 4 interview rounds.
Multiple choice questions to be solved online
ArcelorMittal interview questions for popular designations
I applied via Walk-in and was interviewed before Aug 2020. There was 1 interview round.
Flushing and pickling are processes used to clean and protect hydraulic systems.
Flushing involves removing contaminants and debris from the system using a flushing fluid.
Pickling involves applying a protective coating to the system to prevent corrosion.
Both processes are important for maintaining the performance and longevity of hydraulic systems.
Examples of flushing fluids include water, solvents, and specialized flus...
Preventive maintenance is planned maintenance to prevent breakdowns, while breakdown maintenance is repairing equipment after it has failed.
Preventive maintenance is scheduled and proactive
Breakdown maintenance is reactive and occurs after equipment failure
Preventive maintenance reduces downtime and increases equipment lifespan
Breakdown maintenance can be costly and cause production delays
Examples of preventive mainten...
Get interview-ready with Top ArcelorMittal Interview Questions
I was interviewed in Jun 2020.
I applied via Naukri.com and was interviewed in Oct 2020. There was 1 interview round.
I applied via Shine and was interviewed before Jul 2020. There were 3 interview rounds.
The size of a transformer can vary greatly depending on its intended use and power capacity.
The size of a transformer is typically measured in kVA (kilovolt-amperes) or MVA (megavolt-amperes).
Transformers used in residential settings can range from 5-50 kVA.
Transformers used in industrial settings can range from 500 kVA to over 100 MVA.
The physical size of a transformer can also vary greatly depending on its power capa
Project management is the practice of planning, organizing, and executing projects to achieve specific goals within a defined timeframe.
Project management involves defining project objectives, creating a project plan, and allocating resources.
It includes coordinating and communicating with team members, stakeholders, and clients.
Project managers monitor progress, manage risks, and make adjustments to ensure successful ...
Clashing refers to conflicts or clashes between different elements or parties.
Clashing occurs when there is a disagreement or collision between two or more entities.
It can happen in various contexts such as project management, team dynamics, or resource allocation.
Examples of clashing include conflicting priorities, incompatible schedules, or disagreements on project scope.
Clashing can lead to delays, inefficiencies, o...
Recording delays involves documenting the cause, duration, and impact of the delay.
Identify the cause of the delay, such as equipment failure or resource unavailability.
Record the duration of the delay, including start and end times.
Document the impact of the delay on the project timeline, budget, and resources.
Use a standardized format or template to ensure consistency in recording delays.
Include any relevant supporti...
To claim, provide necessary documentation and evidence to support the claim.
Gather all relevant documentation and evidence to support the claim
Prepare a written claim statement explaining the basis of the claim
Submit the claim along with supporting documents to the appropriate authority
Follow up on the claim to ensure it is being processed
Provide any additional information or clarification if requested
The daily log contains a record of activities, progress, issues, and decisions made during a project.
Activities performed by the project team
Progress made on project tasks
Issues encountered and their resolutions
Decisions made during project meetings
Changes to project scope or requirements
Communication with stakeholders
Risks identified and mitigation strategies
Resource allocation and utilization
Budget updates
Milestones
Top trending discussions
Interview experience
based on 358 reviews
Rating in categories
Deputy Manager
118
salaries
| ₹5 L/yr - ₹16 L/yr |
Manager
111
salaries
| ₹7.2 L/yr - ₹26.5 L/yr |
Assistant Manager
85
salaries
| ₹3.8 L/yr - ₹12 L/yr |
Senior Manager
48
salaries
| ₹11.4 L/yr - ₹30 L/yr |
Assistant Field Engineer
43
salaries
| ₹1.8 L/yr - ₹4.3 L/yr |
Tata Steel
JSW Steel
Steel Authority Of India
Vedanta Limited