Filter interviews by
I applied via Approached by Company and was interviewed in Nov 2017. There were 3 interview rounds.
To remove asphalt quantity, it can be milled, recycled, or excavated.
Milling: Using specialized machinery to remove the top layer of asphalt.
Recycling: Crushing and reusing the asphalt for new construction.
Excavation: Digging and removing the asphalt manually or with heavy equipment.
posted on 16 Jan 2021
I applied via Approached by Company and was interviewed before Mar 2023. There were 4 interview rounds.
posted on 28 Mar 2024
posted on 28 Mar 2024
posted on 23 Nov 2015
SDLC is a process followed by software development teams to design, develop and test high-quality software.
SDLC consists of several phases including planning, analysis, design, development, testing, deployment, and maintenance.
Each phase has its own set of deliverables and objectives.
SDLC models include Waterfall, Agile, and DevOps.
SDLC helps ensure that software is developed efficiently, on time, and within budget.
SDL...
Different software development models
Waterfall model
Agile model
Spiral model
V-model
Iterative model
RAD model
Prototype model
Incremental model
Waterfall model is a linear sequential approach to software development.
Advantages: clear and well-defined stages, easy to understand and manage, suitable for small projects with stable requirements
Disadvantages: inflexible, difficult to make changes once a stage is completed, testing is done only at the end, not suitable for large or complex projects
Stages: requirements gathering, design, implementation, testing, depl...
Agile is an iterative approach to software development that emphasizes flexibility and customer satisfaction.
Agile involves breaking down projects into smaller, more manageable chunks called sprints.
It prioritizes collaboration between developers, customers, and stakeholders.
It allows for changes and adjustments to be made throughout the development process.
It promotes continuous delivery and improvement.
Advantages ove...
Questions about my project, E-R diagram, C/C++ projects, and software development model used.
Explained my project and its E-R diagram
Shared my experience with C/C++ projects
Discussed the software development model used
Provided examples to support my answers
posted on 6 May 2019
I applied via Campus Placement and was interviewed before May 2018. There was 0 interview round.
OHE stands for Overhead Equipment. It refers to the electrical infrastructure used to power and support trains in railway systems.
OHE is an essential component of railway systems, providing power to trains through overhead wires.
It consists of various elements such as catenary wires, contact wires, insulators, and supporting structures.
OHE engineers are responsible for designing, installing, and maintaining the OHE sys...
based on 5 reviews
Rating in categories
Civil Supervisor
5
salaries
| ₹7.1 L/yr - ₹8.4 L/yr |
Bombardier Transportation
Linfox Logistics
Maharashtra State Road Transport Corporation
Delhi Integrated Multi Modal Transit System