Filter interviews by
I applied via LinkedIn and was interviewed before Dec 2022. There were 2 interview rounds.
I applied via Approached by Company and was interviewed before Mar 2023. There were 4 interview rounds.
Answers to questions related to Quantity Supervisor role and responsibilities.
Billings refer to the invoices raised by the contractor for the work done, while QS is responsible for cost estimation, budgeting, and cost control.
The role of QS includes cost estimation, budgeting, cost control, tendering, contract administration, and project management.
Prime approval is the approval given by the client or the consultant fo...
I applied via Approached by Company and was interviewed before Dec 2022. There were 5 interview rounds.
BARSYL interview questions for popular designations
OHE stands for Overhead Equipment. It refers to the electrical infrastructure used to power and support trains in railway systems.
OHE is an essential component of railway systems, providing power to trains through overhead wires.
It consists of various elements such as catenary wires, contact wires, insulators, and supporting structures.
OHE engineers are responsible for designing, installing, and maintaining the OHE sys...
Top trending discussions
posted on 27 Jan 2025
posted on 28 Jan 2025
I was interviewed before Jan 2024.
posted on 26 Oct 2024
I applied via Referral and was interviewed in Jul 2024. There was 1 interview round.
Plate weight can be calculated by multiplying the area of the plate by its density.
Calculate the area of the plate by multiplying its length and width.
Determine the density of the material of the plate.
Multiply the area by the density to get the weight of the plate.
Cycle time can be calculated by dividing the total production time by the total number of units produced.
Calculate the total production time, including setup time, processing time, and downtime.
Determine the total number of units produced during that time period.
Divide the total production time by the total number of units produced to get the cycle time.
Cycle Time = Total Production Time / Total Number of Units Produce
Interview experience
Assistant Manager
8
salaries
| ₹4 L/yr - ₹8.7 L/yr |
Electrical Supervisor
7
salaries
| ₹4.4 L/yr - ₹4.9 L/yr |
Civil Expert
6
salaries
| ₹5.5 L/yr - ₹7.2 L/yr |
Civil Site Engineer
5
salaries
| ₹3.8 L/yr - ₹4.2 L/yr |
Safety Engineer
5
salaries
| ₹4.5 L/yr - ₹6.5 L/yr |
Feedback Infrastructure Services
Mecon
RITES
IL&FS Engineering and Construction