System implementation process involves planning, designing, testing, and deploying new software or hardware systems.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating system architecture, database design, and user interface.
Testing phase involves conducting various tests to ensure system functionality and performance.
Deployment phase includes installing...
Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.
Set clear performance expectations for team members
Provide regular feedback on performance
Track progress towards goals and objectives
Address any performance issues promptly and constructively
I applied via Newspaper Ad and was interviewed before Oct 2022. There were 2 interview rounds.
I applied via Company Website
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
posted on 15 Nov 2020
I applied via Walk-in and was interviewed before Nov 2019. There were 3 interview rounds.
The duration and machinery requirement for dumping and compacting one lakh cum of soil.
The duration depends on the capacity of the machinery and the number of machines used.
The type of soil and the site conditions also affect the duration.
On average, it takes around 30-45 days to complete the task.
The machinery required includes excavators, bulldozers, dump trucks, and compactors.
Minor bridges are usually shorter and have a lower weight capacity than major bridges.
Major bridges are typically longer and have a higher weight capacity than minor bridges.
Minor bridges are often used for pedestrian or bike traffic, while major bridges are used for vehicles and heavy machinery.
Major bridges may require more maintenance and have a higher construction cost than minor bridges.
Examples of major bridges i...
I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.
Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.
The vessel or pipeline is filled with water and pressurized to a specified level
The pressure is held for a specified amount of time to check for leaks or deformations
The test is usually performed before commissioning or after repairs
The test pressure and duration are deter...
HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.
Ensure the HDD is compatible with the computer system
Physically install the HDD in the appropriate bay
Connect the necessary cables to the HDD and motherboard
Configure the HDD in the BIOS settings
Format the HDD and install the operating system
Test the HDD for proper functionality
posted on 21 Jan 2025
I was interviewed before Jan 2024.
Steps involved in preparing a project budget
Identify all project expenses including labor, materials, equipment, etc.
Estimate the cost of each expense item based on historical data or quotes from vendors
Allocate funds for unexpected costs or contingencies
Determine the timeline for the project and spread out costs accordingly
Review and finalize the budget with key stakeholders
Factors considered in project costing include materials, labor, overhead, equipment, and indirect costs.
Materials: Cost of raw materials needed for the project.
Labor: Cost of labor required to complete the project.
Overhead: Indirect costs such as utilities, rent, and administrative expenses.
Equipment: Cost of equipment needed for the project.
Indirect costs: Miscellaneous costs like permits, insurance, and taxes.
Example...
I monitor the budget by regularly reviewing expenses, comparing them to projections, and making adjustments as needed.
Regularly review expenses to ensure they are in line with the budget
Compare actual expenses to budget projections to identify any discrepancies
Make adjustments to the budget as needed based on the review and analysis
Track spending patterns and identify areas where cost savings can be made
Indirect costs are expenses that are not directly tied to a specific project or department, but still contribute to overall operational costs.
Indirect costs are overhead expenses that cannot be easily traced to a specific cost object.
Examples include rent, utilities, administrative salaries, and office supplies.
These costs are necessary for the business to function, but are not directly attributable to a specific produ...
Cash flow can be effectively monitored by tracking income and expenses, creating cash flow statements, setting up cash flow projections, and using accounting software.
Track income and expenses regularly to understand the flow of cash in and out of the business.
Create cash flow statements to analyze the sources and uses of cash over a specific period.
Set up cash flow projections to forecast future cash flow based on exp...
based on 1 review
Rating in categories
Assistant Manager
9
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrical Supervisor
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Expert
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Safety Engineer
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Feedback Infrastructure Services
Mecon
RITES
IL&FS Engineering and Construction