The duration and machinery requirement for dumping and compacting one lakh cum of soil.
The duration depends on the capacity of the machinery and the number of machines used.
The type of soil and the site conditions also affect the duration.
On average, it takes around 30-45 days to complete the task.
The machinery required includes excavators, bulldozers, dump trucks, and compactors.
Minor bridges are usually shorter and have a lower weight capacity than major bridges.
Major bridges are typically longer and have a higher weight capacity than minor bridges.
Minor bridges are often used for pedestrian or bike traffic, while major bridges are used for vehicles and heavy machinery.
Major bridges may require more maintenance and have a higher construction cost than minor bridges.
Examples of major bridges i...
I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.
Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.
The vessel or pipeline is filled with water and pressurized to a specified level
The pressure is held for a specified amount of time to check for leaks or deformations
The test is usually performed before commissioning or after repairs
The test pressure and duration are deter...
HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.
Ensure the HDD is compatible with the computer system
Physically install the HDD in the appropriate bay
Connect the necessary cables to the HDD and motherboard
Configure the HDD in the BIOS settings
Format the HDD and install the operating system
Test the HDD for proper functionality
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
I applied via Newspaper Ad and was interviewed before Oct 2022. There were 2 interview rounds.
I applied via Company Website
System implementation process involves planning, designing, testing, and deploying new software or hardware systems.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating system architecture, database design, and user interface.
Testing phase involves conducting various tests to ensure system functionality and performance.
Deployment phase includes installing...
Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.
Set clear performance expectations for team members
Provide regular feedback on performance
Track progress towards goals and objectives
Address any performance issues promptly and constructively
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Assistant Manager
9
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrical Supervisor
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Expert
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Safety Engineer
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Feedback Infrastructure Services
Mecon
RITES
IL&FS Engineering and Construction