Filter interviews by
I applied via Approached by Company and was interviewed in Nov 2017. There were 3 interview rounds.
To remove asphalt quantity, it can be milled, recycled, or excavated.
Milling: Using specialized machinery to remove the top layer of asphalt.
Recycling: Crushing and reusing the asphalt for new construction.
Excavation: Digging and removing the asphalt manually or with heavy equipment.
Top trending discussions
Concrete is checked at site through various methods to ensure its quality and strength.
Visual inspection of concrete surface
Slump test to check consistency
Compression test to check strength
Ultrasonic testing to detect defects
Core testing to check strength and uniformity
Rebound hammer test to check surface hardness
Temperature monitoring during curing process
Checking for proper mix proportions and curing conditions
Verifi...
Free fall in concrete refers to the process of pouring concrete without any external force to assist in its placement.
Free fall is a method of placing concrete where it is allowed to fall from the mixer truck or pump without any external force.
This method is used for small jobs or in areas where access is limited.
It can result in segregation and air pockets in the concrete if not properly managed.
Free fall height shoul...
Grade of concrete refers to the strength of the concrete mix.
Grade of concrete is denoted by the ratio of cement, sand, and aggregate used in the mix.
The strength of concrete increases with the increase in the grade of concrete.
For example, M20 grade of concrete means the mix contains 1 part cement, 1.5 parts sand, and 3 parts aggregate.
Higher grade of concrete is used for structures that require higher strength, such
Select fill material is a type of soil used to fill in areas where the ground needs to be raised or leveled.
Select fill material is typically composed of clay, sand, and gravel.
It is used in construction projects to create a stable base for buildings, roads, and other structures.
The material is carefully selected and tested to ensure it meets specific engineering requirements.
Examples of select fill material include cr...
Embedded length is the length of a reinforcing bar that is embedded in concrete.
It is the length of a reinforcing bar that is embedded in concrete
It is used to provide anchorage to the reinforcement in the concrete
The length is determined by the diameter of the bar and the strength of the concrete
It is important to ensure that the embedded length is sufficient to prevent failure of the structure
I applied via Naukri.com and was interviewed before Jan 2022. There were 2 interview rounds.
I have a strong technical knowledge about pipeline design, construction, and maintenance.
I am familiar with different types of pipelines such as oil, gas, water, and sewage pipelines.
I have experience in designing pipeline routes, selecting materials, and calculating pressure drops.
I am knowledgeable about pipeline construction techniques, including welding, trenching, and backfilling.
I am skilled in pipeline inspectio...
Bar bending schedule is a document that provides details of reinforcement steel bars used in construction.
It includes information like bar diameter, length, shape, and number of bars required for each structural element.
It helps in estimating the quantity of steel required for a project and ensures that the reinforcement is placed correctly.
It is prepared by a structural engineer or a detailer and is used by the site e...
Civil Supervisor
5
salaries
| ₹7.1 L/yr - ₹8.4 L/yr |
Bombardier Transportation
Linfox Logistics
Maharashtra State Road Transport Corporation
Delhi Integrated Multi Modal Transit System